动态迭代法:文化事件管理的新途径

E. Šviráková
{"title":"动态迭代法:文化事件管理的新途径","authors":"E. Šviráková","doi":"10.46300/91015.2021.15.16","DOIUrl":null,"url":null,"abstract":"This article provides project managers, the cultural events organizers, a new approach to plan preparation and to the monitoring of events realization. The Dynamic Iteration Method introduced in this article is based on the system dynamic modelling and on the principles of project iterative development. The plan model and the reality model are structurally similar; they differ in values of exogenous variables. The new approach enables to easily monitor the real project course in close connection with the plan and to take timely controlling steps. The effects resulting from the manager´s decisionmaking process are compared with the plan in regular iterations. The method thus reminds of a traveller whose route is adjusted by a GPS navigation system.","PeriodicalId":158702,"journal":{"name":"International Journal of Systems Applications, Engineering & Development","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Dynamic Iteration Method: New Approach to Cultural Events Management\",\"authors\":\"E. Šviráková\",\"doi\":\"10.46300/91015.2021.15.16\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article provides project managers, the cultural events organizers, a new approach to plan preparation and to the monitoring of events realization. The Dynamic Iteration Method introduced in this article is based on the system dynamic modelling and on the principles of project iterative development. The plan model and the reality model are structurally similar; they differ in values of exogenous variables. The new approach enables to easily monitor the real project course in close connection with the plan and to take timely controlling steps. The effects resulting from the manager´s decisionmaking process are compared with the plan in regular iterations. The method thus reminds of a traveller whose route is adjusted by a GPS navigation system.\",\"PeriodicalId\":158702,\"journal\":{\"name\":\"International Journal of Systems Applications, Engineering & Development\",\"volume\":\"11 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-11-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Systems Applications, Engineering & Development\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.46300/91015.2021.15.16\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Systems Applications, Engineering & Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46300/91015.2021.15.16","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文为项目经理、文化活动组织者提供了一种规划准备和活动实现监控的新方法。本文介绍的动态迭代方法是基于系统动态建模和项目迭代开发的原理。计划模型与现实模型在结构上相似;它们不同于外生变量的值。该方法可以方便地监控与计划密切相关的实际项目过程,并及时采取控制步骤。在常规迭代中,将管理者的决策过程所产生的效果与计划进行比较。因此,这种方法让人想起了通过GPS导航系统调整路线的旅行者。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Dynamic Iteration Method: New Approach to Cultural Events Management
This article provides project managers, the cultural events organizers, a new approach to plan preparation and to the monitoring of events realization. The Dynamic Iteration Method introduced in this article is based on the system dynamic modelling and on the principles of project iterative development. The plan model and the reality model are structurally similar; they differ in values of exogenous variables. The new approach enables to easily monitor the real project course in close connection with the plan and to take timely controlling steps. The effects resulting from the manager´s decisionmaking process are compared with the plan in regular iterations. The method thus reminds of a traveller whose route is adjusted by a GPS navigation system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ERP System Implementation: Benefits and Economic Effectiveness Economic Indicators Selection for Property Crime Rates using Grey Relational Analysis and Support Vector Regression Chaos Driven Evolutionary Algorithm: a Novel Approach for Optimization Design and Implementation of Digital Beam Former Architecture for Phased Array Radar A Simulation and Experimental Study on Identification of an Electromechanical System
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1