{"title":"公用有线电信设施中的特殊电磁兼容问题","authors":"G. Gratta, H. Lorke, P. Persson","doi":"10.1109/ISEMC.1979.7568835","DOIUrl":null,"url":null,"abstract":"This report is based on the results of activities carried out in CCITT * Study Group V. This Study Group is responsible for questions relating to the protection of wire telecommunication installations against the effects of external electromagnetic fields. The activities of Study Group V were described in detail on the EMC Symposium of 1978 in Wroclaw (People's Republic of Poland).","PeriodicalId":283257,"journal":{"name":"1979 IEEE International Symposium on Electromagnetic Compatibility","volume":"256 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1979-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Special EMC Problems in Public Wire Telecommunication Installations\",\"authors\":\"G. Gratta, H. Lorke, P. Persson\",\"doi\":\"10.1109/ISEMC.1979.7568835\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This report is based on the results of activities carried out in CCITT * Study Group V. This Study Group is responsible for questions relating to the protection of wire telecommunication installations against the effects of external electromagnetic fields. The activities of Study Group V were described in detail on the EMC Symposium of 1978 in Wroclaw (People's Republic of Poland).\",\"PeriodicalId\":283257,\"journal\":{\"name\":\"1979 IEEE International Symposium on Electromagnetic Compatibility\",\"volume\":\"256 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1979-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"1979 IEEE International Symposium on Electromagnetic Compatibility\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISEMC.1979.7568835\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"1979 IEEE International Symposium on Electromagnetic Compatibility","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISEMC.1979.7568835","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Special EMC Problems in Public Wire Telecommunication Installations
This report is based on the results of activities carried out in CCITT * Study Group V. This Study Group is responsible for questions relating to the protection of wire telecommunication installations against the effects of external electromagnetic fields. The activities of Study Group V were described in detail on the EMC Symposium of 1978 in Wroclaw (People's Republic of Poland).