信息技术项目评估技术研究

James Prater, K. Kirytopoulos, T. Ma
{"title":"信息技术项目评估技术研究","authors":"James Prater, K. Kirytopoulos, T. Ma","doi":"10.1109/IEEM44572.2019.8978554","DOIUrl":null,"url":null,"abstract":"One of the key activities for a project manager at the commencement of a new project is to develop an accurate realistic schedule. The development of an accurate schedule sets the project up for success and understanding what estimation techniques work, and more importantly the ones that don't work is key to setting the project up for success. This research reviews eight estimation techniques and provides a statistical insight into which of these techniques is perceived to work by project management practitioners.","PeriodicalId":255418,"journal":{"name":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Investigation of Estimation Techniques for Information Technology Projects\",\"authors\":\"James Prater, K. Kirytopoulos, T. Ma\",\"doi\":\"10.1109/IEEM44572.2019.8978554\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"One of the key activities for a project manager at the commencement of a new project is to develop an accurate realistic schedule. The development of an accurate schedule sets the project up for success and understanding what estimation techniques work, and more importantly the ones that don't work is key to setting the project up for success. This research reviews eight estimation techniques and provides a statistical insight into which of these techniques is perceived to work by project management practitioners.\",\"PeriodicalId\":255418,\"journal\":{\"name\":\"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM44572.2019.8978554\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM44572.2019.8978554","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

项目经理在新项目开始时的关键活动之一是制定一个准确的、现实的时间表。制定准确的进度表为项目的成功奠定了基础,并且了解哪些评估技术有效,更重要的是哪些评估技术不起作用,这是为项目的成功奠定基础的关键。本研究回顾了八种评估技术,并提供了一种统计见解,以了解哪些技术被项目管理从业者认为是有效的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
An Investigation of Estimation Techniques for Information Technology Projects
One of the key activities for a project manager at the commencement of a new project is to develop an accurate realistic schedule. The development of an accurate schedule sets the project up for success and understanding what estimation techniques work, and more importantly the ones that don't work is key to setting the project up for success. This research reviews eight estimation techniques and provides a statistical insight into which of these techniques is perceived to work by project management practitioners.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Locating Humanitarian Relief Effort Facility Using P-Center Method A Method of Fault Identification Considering High Fix Priority in Open Source Project Model-based Systems Engineering Process for Supporting Variant Selection in the Early Product Development Phase A Method of Parameter Estimation in Flexible Jump Diffusion Process Models for Open Source Maintenance Effort Management Kanban-CONWIP Hybrid Model for Improving Productivity of an Electrostatic Coating Process
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1