{"title":"基于粒子群优化的模糊作业车间调度问题研究","authors":"Wen Haijun, Hou Shiwang, Faning Long","doi":"10.1109/ICCIAUTOM.2011.6183917","DOIUrl":null,"url":null,"abstract":"Aiming at the uncertain factors in job shop scheduling problem, this paper proposed a scheduling model with the goal of maximum minimal customer satisfaction. Based on fuzzy theory, the uncertain machining time and due-date time were treated as triangle fuzzy number and trapezoidal fuzzy number. The hybrid PSO algorithm was adopted to solve the problem and its validity was validated with a simulation test. The results illustrate that the approach has good effect on solving the JSSP with fuzzy machining time and due-date time.","PeriodicalId":177039,"journal":{"name":"2011 2nd International Conference on Control, Instrumentation and Automation (ICCIA)","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Study on fuzzy job-shop scheduling problem base on particle swarm optimization\",\"authors\":\"Wen Haijun, Hou Shiwang, Faning Long\",\"doi\":\"10.1109/ICCIAUTOM.2011.6183917\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Aiming at the uncertain factors in job shop scheduling problem, this paper proposed a scheduling model with the goal of maximum minimal customer satisfaction. Based on fuzzy theory, the uncertain machining time and due-date time were treated as triangle fuzzy number and trapezoidal fuzzy number. The hybrid PSO algorithm was adopted to solve the problem and its validity was validated with a simulation test. The results illustrate that the approach has good effect on solving the JSSP with fuzzy machining time and due-date time.\",\"PeriodicalId\":177039,\"journal\":{\"name\":\"2011 2nd International Conference on Control, Instrumentation and Automation (ICCIA)\",\"volume\":\"73 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 2nd International Conference on Control, Instrumentation and Automation (ICCIA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCIAUTOM.2011.6183917\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 2nd International Conference on Control, Instrumentation and Automation (ICCIA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCIAUTOM.2011.6183917","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Study on fuzzy job-shop scheduling problem base on particle swarm optimization
Aiming at the uncertain factors in job shop scheduling problem, this paper proposed a scheduling model with the goal of maximum minimal customer satisfaction. Based on fuzzy theory, the uncertain machining time and due-date time were treated as triangle fuzzy number and trapezoidal fuzzy number. The hybrid PSO algorithm was adopted to solve the problem and its validity was validated with a simulation test. The results illustrate that the approach has good effect on solving the JSSP with fuzzy machining time and due-date time.