{"title":"调频业务的分配","authors":"X.P. Zhang, C.Y. Chen, Z. Zheng, G. Strbac, J. Kubokawa","doi":"10.1109/DRPT.2000.855689","DOIUrl":null,"url":null,"abstract":"A novel concept for directly quantifying the value of frequency regulation services of individual generators is proposed in this paper. Individual generator dynamics are explicitly incorporated into the optimisation problem as constraints, which allowed the frequency fluctuations to be also directly monitored and controlled. The approach eliminates the need for not well defined concepts of primary and secondary responses. The developed optimisation problem contains a mix of algebraic and differential equations. In order to solve this complex problem, generating plant dynamic equations are transformed into discrete equations and then a Benders based decomposition applied. The validity of approach is demonstrated on an example with 8 generators.","PeriodicalId":127287,"journal":{"name":"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)","volume":"79 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Allocation of frequency regulation services\",\"authors\":\"X.P. Zhang, C.Y. Chen, Z. Zheng, G. Strbac, J. Kubokawa\",\"doi\":\"10.1109/DRPT.2000.855689\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A novel concept for directly quantifying the value of frequency regulation services of individual generators is proposed in this paper. Individual generator dynamics are explicitly incorporated into the optimisation problem as constraints, which allowed the frequency fluctuations to be also directly monitored and controlled. The approach eliminates the need for not well defined concepts of primary and secondary responses. The developed optimisation problem contains a mix of algebraic and differential equations. In order to solve this complex problem, generating plant dynamic equations are transformed into discrete equations and then a Benders based decomposition applied. The validity of approach is demonstrated on an example with 8 generators.\",\"PeriodicalId\":127287,\"journal\":{\"name\":\"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)\",\"volume\":\"79 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-04-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/DRPT.2000.855689\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DRPT.2000.855689","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

本文提出了一种直接量化单个发电机调频服务价值的新概念。单个发电机的动态被明确地纳入优化问题作为约束,这使得频率波动也可以直接监测和控制。该方法消除了对主要和次要响应的不明确定义的需要。开发的优化问题包含代数方程和微分方程的混合。为了解决这一复杂问题,将生成的植物动力学方程转化为离散方程,然后应用基于Benders的分解方法。通过8台发电机的算例验证了该方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Allocation of frequency regulation services
A novel concept for directly quantifying the value of frequency regulation services of individual generators is proposed in this paper. Individual generator dynamics are explicitly incorporated into the optimisation problem as constraints, which allowed the frequency fluctuations to be also directly monitored and controlled. The approach eliminates the need for not well defined concepts of primary and secondary responses. The developed optimisation problem contains a mix of algebraic and differential equations. In order to solve this complex problem, generating plant dynamic equations are transformed into discrete equations and then a Benders based decomposition applied. The validity of approach is demonstrated on an example with 8 generators.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Degeneracy and duality gap on optimization-based electricity auctions Evaluation of the Romanian electricity industry restructuring process in comparison with the experience in the United Kingdom The use of tangent vectors for voltage collapse analysis Study of interrelations between electric power systems and large consumers in Russia Short-term investment scheduling in transmission power systems by evolutionary computation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1