{"title":"交通服务岗位系统1B:集成与系统测试","authors":"R. Ahmari, R. Dipietro, S. C. Reed, J. Williams","doi":"10.1002/J.1538-7305.1983.TB04421.X","DOIUrl":null,"url":null,"abstract":"The integration testing and system testing strategies used in the development of the Traffic Service Position System No. 1B (TSPS No. 1B) are described in this article. It discusses novel methods developed for the integration and testing of the first embedded application of the 3B20D Processor and DMERT operating system. The new testing techniques and project management aides, which were vital to the achievement of system quality for the Bell System service, are described. The first TSPS No. 1B went into service on November 20, 1981, in Fresno, California.","PeriodicalId":447574,"journal":{"name":"The Bell System Technical Journal","volume":"106 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1983-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Traffic Service Position System No. 1B: Integration and system testing\",\"authors\":\"R. Ahmari, R. Dipietro, S. C. Reed, J. Williams\",\"doi\":\"10.1002/J.1538-7305.1983.TB04421.X\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The integration testing and system testing strategies used in the development of the Traffic Service Position System No. 1B (TSPS No. 1B) are described in this article. It discusses novel methods developed for the integration and testing of the first embedded application of the 3B20D Processor and DMERT operating system. The new testing techniques and project management aides, which were vital to the achievement of system quality for the Bell System service, are described. The first TSPS No. 1B went into service on November 20, 1981, in Fresno, California.\",\"PeriodicalId\":447574,\"journal\":{\"name\":\"The Bell System Technical Journal\",\"volume\":\"106 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1983-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Bell System Technical Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/J.1538-7305.1983.TB04421.X\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Bell System Technical Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/J.1538-7305.1983.TB04421.X","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Traffic Service Position System No. 1B: Integration and system testing
The integration testing and system testing strategies used in the development of the Traffic Service Position System No. 1B (TSPS No. 1B) are described in this article. It discusses novel methods developed for the integration and testing of the first embedded application of the 3B20D Processor and DMERT operating system. The new testing techniques and project management aides, which were vital to the achievement of system quality for the Bell System service, are described. The first TSPS No. 1B went into service on November 20, 1981, in Fresno, California.