{"title":"中压变电站改造调试的经验与分析","authors":"Azelma Demirović, Amir Kurtić","doi":"10.2478/bhee-2021-0019","DOIUrl":null,"url":null,"abstract":"Abstract The paper will present experiences in the reconstruction of the transformer station, which supplies the industrial factory. The previous version of the medium voltage (MV) substation with oil-filled transformers, and the new MV substation with dry and more energy efficient transformers, will be presented. An analysis of the operation and maintenance methods of oil transformers will be given. As oil transformers have many disadvantages, the reason, choice and cost-effectiveness of replacement with new dry transformers will be presented. Tests and measurements of insulation resistance of the winding and transformer protection during commissioning will also be presented. PT100 probes, which are connected to the thermostat, are installed in each low voltage winding of the dry transformer. Testing of this thermal protection of the transformer will be presented as well. Since transformers supply industrial consumers, mostly nonlinear ones, it is important to analyse the losses and life span of transformers. Nonlinear consumers lead to early aging of winding insulation, premature failures and reduction of transformer life. The newly designed and installed MV substation with Ring-main unit is ABB type SafePlus, and its installation and operating instructions will also be presented. The MV is equipped with a protection terminal, so settings and measurements of this terminal in transformer cells will be done. After the commissioning of the transformer station, the most important are diagnostics and periodic tests. Methods of periodic testing of MV substations will be presented in this paper.","PeriodicalId":236883,"journal":{"name":"B&H Electrical Engineering","volume":"85 2","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Experiences and Analyses of Reconstruction and Commissioning of Medium Voltage Substation\",\"authors\":\"Azelma Demirović, Amir Kurtić\",\"doi\":\"10.2478/bhee-2021-0019\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The paper will present experiences in the reconstruction of the transformer station, which supplies the industrial factory. The previous version of the medium voltage (MV) substation with oil-filled transformers, and the new MV substation with dry and more energy efficient transformers, will be presented. An analysis of the operation and maintenance methods of oil transformers will be given. As oil transformers have many disadvantages, the reason, choice and cost-effectiveness of replacement with new dry transformers will be presented. Tests and measurements of insulation resistance of the winding and transformer protection during commissioning will also be presented. PT100 probes, which are connected to the thermostat, are installed in each low voltage winding of the dry transformer. Testing of this thermal protection of the transformer will be presented as well. Since transformers supply industrial consumers, mostly nonlinear ones, it is important to analyse the losses and life span of transformers. Nonlinear consumers lead to early aging of winding insulation, premature failures and reduction of transformer life. The newly designed and installed MV substation with Ring-main unit is ABB type SafePlus, and its installation and operating instructions will also be presented. The MV is equipped with a protection terminal, so settings and measurements of this terminal in transformer cells will be done. After the commissioning of the transformer station, the most important are diagnostics and periodic tests. Methods of periodic testing of MV substations will be presented in this paper.\",\"PeriodicalId\":236883,\"journal\":{\"name\":\"B&H Electrical Engineering\",\"volume\":\"85 2\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"B&H Electrical Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/bhee-2021-0019\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"B&H Electrical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/bhee-2021-0019","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摘要:本文介绍了为工业厂房供电的变电站的改造经验。将介绍采用充油变压器的中压(MV)变电站的旧版本,以及采用干式和更节能变压器的新型中压变电站。对油变压器的运行和维护方法进行了分析。由于油变压器有许多缺点,本文将介绍更换干式变压器的原因、选择和成本效益。并介绍了调试过程中绕组和变压器保护绝缘电阻的测试和测量。PT100探头与恒温器相连,安装在干式变压器的每个低压绕组中。变压器热保护的测试也将被介绍。由于变压器为工业用户供电,且大多是非线性用户,因此对变压器的损耗和寿命进行分析是非常重要的。非线性消耗导致绕组绝缘过早老化,过早失效,降低变压器寿命。新设计安装的环形主机组中压变电站为ABB SafePlus型,并介绍其安装和操作说明。中压机配有保护端子,因此在变压器单元中对该端子进行设置和测量。变电站投产后,最重要的是诊断和定期试验。本文将介绍中压变电站的定期检测方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Experiences and Analyses of Reconstruction and Commissioning of Medium Voltage Substation
Abstract The paper will present experiences in the reconstruction of the transformer station, which supplies the industrial factory. The previous version of the medium voltage (MV) substation with oil-filled transformers, and the new MV substation with dry and more energy efficient transformers, will be presented. An analysis of the operation and maintenance methods of oil transformers will be given. As oil transformers have many disadvantages, the reason, choice and cost-effectiveness of replacement with new dry transformers will be presented. Tests and measurements of insulation resistance of the winding and transformer protection during commissioning will also be presented. PT100 probes, which are connected to the thermostat, are installed in each low voltage winding of the dry transformer. Testing of this thermal protection of the transformer will be presented as well. Since transformers supply industrial consumers, mostly nonlinear ones, it is important to analyse the losses and life span of transformers. Nonlinear consumers lead to early aging of winding insulation, premature failures and reduction of transformer life. The newly designed and installed MV substation with Ring-main unit is ABB type SafePlus, and its installation and operating instructions will also be presented. The MV is equipped with a protection terminal, so settings and measurements of this terminal in transformer cells will be done. After the commissioning of the transformer station, the most important are diagnostics and periodic tests. Methods of periodic testing of MV substations will be presented in this paper.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Increasing the Capacity of the Distribution Network by Changing Consumers’ Habits - Case Study Long-Range Remote Control Based on LoRa Transceivers Digital Transformation Path of Manually Collected Meter Reading Data Profile Optimisation in Real Distribution Networks (Case Study Long MV Feeder) New Functions of VSC Based HVDC Transmission Systems that Can Effectively Support the Future South-East European Grid with Low Inertia and Large Amount of Res Generation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1