A. Ebert, M. Eppel, S. Genthe, H. Schwarzjirg, J. Stark, W. Werner
{"title":"传输网络的系统恢复","authors":"A. Ebert, M. Eppel, S. Genthe, H. Schwarzjirg, J. Stark, W. Werner","doi":"10.1109/EMPD.1995.500706","DOIUrl":null,"url":null,"abstract":"In a large SCADA/EMS-system an expert system for fault diagnosis and for system restoration is integrated. The system restoration covered by the expert system gives assistance to the operator in any kind of blackout by presenting restoration plans. In case any number of busbars is outaged the system automatically determines the affected network areas and thereby the magnitude of the whole blackout. The restoration of the network is done in phases depending on the kind of blackout and is based on a global utility-strategy-plan. Within this scheme the detailed restoration plan is determined dynamically based on the actual situation and some predefinitions such as load priorities and power plants to be reenergized with priority. The described system covers all cases of blackouts by evaluating a plan based on the individual case. The expert system is a hybrid system using an optimal power flow, too, and is fully integrated in the SCADA/EMS system. The plans of each phase are presented via the common MMI to the operator and supervised due to execution. The system distinguishes between operator wanted deviations and unwanted deviations during execution. Thus the operator at any time can continue as he likes.","PeriodicalId":447674,"journal":{"name":"Proceedings 1995 International Conference on Energy Management and Power Delivery EMPD '95","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-11-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"System restoration of a transmission network\",\"authors\":\"A. Ebert, M. Eppel, S. Genthe, H. Schwarzjirg, J. Stark, W. Werner\",\"doi\":\"10.1109/EMPD.1995.500706\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In a large SCADA/EMS-system an expert system for fault diagnosis and for system restoration is integrated. The system restoration covered by the expert system gives assistance to the operator in any kind of blackout by presenting restoration plans. In case any number of busbars is outaged the system automatically determines the affected network areas and thereby the magnitude of the whole blackout. The restoration of the network is done in phases depending on the kind of blackout and is based on a global utility-strategy-plan. Within this scheme the detailed restoration plan is determined dynamically based on the actual situation and some predefinitions such as load priorities and power plants to be reenergized with priority. The described system covers all cases of blackouts by evaluating a plan based on the individual case. The expert system is a hybrid system using an optimal power flow, too, and is fully integrated in the SCADA/EMS system. The plans of each phase are presented via the common MMI to the operator and supervised due to execution. The system distinguishes between operator wanted deviations and unwanted deviations during execution. Thus the operator at any time can continue as he likes.\",\"PeriodicalId\":447674,\"journal\":{\"name\":\"Proceedings 1995 International Conference on Energy Management and Power Delivery EMPD '95\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1995-11-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings 1995 International Conference on Energy Management and Power Delivery EMPD '95\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EMPD.1995.500706\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings 1995 International Conference on Energy Management and Power Delivery EMPD '95","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EMPD.1995.500706","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
In a large SCADA/EMS-system an expert system for fault diagnosis and for system restoration is integrated. The system restoration covered by the expert system gives assistance to the operator in any kind of blackout by presenting restoration plans. In case any number of busbars is outaged the system automatically determines the affected network areas and thereby the magnitude of the whole blackout. The restoration of the network is done in phases depending on the kind of blackout and is based on a global utility-strategy-plan. Within this scheme the detailed restoration plan is determined dynamically based on the actual situation and some predefinitions such as load priorities and power plants to be reenergized with priority. The described system covers all cases of blackouts by evaluating a plan based on the individual case. The expert system is a hybrid system using an optimal power flow, too, and is fully integrated in the SCADA/EMS system. The plans of each phase are presented via the common MMI to the operator and supervised due to execution. The system distinguishes between operator wanted deviations and unwanted deviations during execution. Thus the operator at any time can continue as he likes.