2006年伊利诺斯州电力拍卖的教训

M. Negrete-Pincetic, G. Gross
{"title":"2006年伊利诺斯州电力拍卖的教训","authors":"M. Negrete-Pincetic, G. Gross","doi":"10.1109/IREP.2007.4410562","DOIUrl":null,"url":null,"abstract":"The high prices of the outcomes of the 2006 Illinois Electricity Auction have generated considerably controversy because of their impacts in increasing retail electricity prices in Illinois. In this work, we present a review and a critical analysis of the design of, and the results obtained in, the reverse auction performed in September of 2006 for the two major distribution companies, ComEd and Ameren. Our work is from the vantage point of power system operations and economics, and aims to assess how well the auction process was designed, putting special emphasis in the consequences of the definition of the products.","PeriodicalId":214545,"journal":{"name":"2007 iREP Symposium - Bulk Power System Dynamics and Control - VII. Revitalizing Operational Reliability","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-12-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Lessons from the 2006 Illinois Electricity Auction\",\"authors\":\"M. Negrete-Pincetic, G. Gross\",\"doi\":\"10.1109/IREP.2007.4410562\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The high prices of the outcomes of the 2006 Illinois Electricity Auction have generated considerably controversy because of their impacts in increasing retail electricity prices in Illinois. In this work, we present a review and a critical analysis of the design of, and the results obtained in, the reverse auction performed in September of 2006 for the two major distribution companies, ComEd and Ameren. Our work is from the vantage point of power system operations and economics, and aims to assess how well the auction process was designed, putting special emphasis in the consequences of the definition of the products.\",\"PeriodicalId\":214545,\"journal\":{\"name\":\"2007 iREP Symposium - Bulk Power System Dynamics and Control - VII. Revitalizing Operational Reliability\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-12-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 iREP Symposium - Bulk Power System Dynamics and Control - VII. Revitalizing Operational Reliability\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IREP.2007.4410562\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 iREP Symposium - Bulk Power System Dynamics and Control - VII. Revitalizing Operational Reliability","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IREP.2007.4410562","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

2006年伊利诺斯州电力拍卖结果的高价格产生了相当大的争议,因为它们对伊利诺斯州零售电价的上涨产生了影响。在这项工作中,我们对2006年9月为两家主要分销公司ComEd和Ameren进行的反向拍卖的设计和结果进行了回顾和批判性分析。我们的工作是从电力系统运行和经济的角度出发,旨在评估拍卖过程的设计情况,特别强调产品定义的后果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Lessons from the 2006 Illinois Electricity Auction
The high prices of the outcomes of the 2006 Illinois Electricity Auction have generated considerably controversy because of their impacts in increasing retail electricity prices in Illinois. In this work, we present a review and a critical analysis of the design of, and the results obtained in, the reverse auction performed in September of 2006 for the two major distribution companies, ComEd and Ameren. Our work is from the vantage point of power system operations and economics, and aims to assess how well the auction process was designed, putting special emphasis in the consequences of the definition of the products.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Risk assessment approach for re-regulated distribution systems The economic aspects of operational reliability in electricity markets Optimal Energy Flow of integrated energy systems with hydrogen economy considerations A hybrid on-line slow voltage control scheme for large power systems Satellite based communication network for large scale power system applications
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1