{"title":"韩国电力系统的长期输变电计划","authors":"Hyeon-jin Oh, Y. Won, Jong-young Hwang","doi":"10.1109/TD-ASIA.2009.5356821","DOIUrl":null,"url":null,"abstract":"According to the Electricity Enterprises Act, The Chief of Ministry Knowledge Economy has to release “the Basic Plan for long term Electricity supply & demand” biannually in order to stabilize Korea electric power system. The Basic Plan for long term Electricity supply & demand is composed of government power policy, long-term power demand forecast, power plant expansion plan and so on. The planning period is 15 years considering nuclear power plant construction period. It was released on 29, DEC. 2008.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"57 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The long-term transmission & substation plan in Korea power system\",\"authors\":\"Hyeon-jin Oh, Y. Won, Jong-young Hwang\",\"doi\":\"10.1109/TD-ASIA.2009.5356821\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"According to the Electricity Enterprises Act, The Chief of Ministry Knowledge Economy has to release “the Basic Plan for long term Electricity supply & demand” biannually in order to stabilize Korea electric power system. The Basic Plan for long term Electricity supply & demand is composed of government power policy, long-term power demand forecast, power plant expansion plan and so on. The planning period is 15 years considering nuclear power plant construction period. It was released on 29, DEC. 2008.\",\"PeriodicalId\":131589,\"journal\":{\"name\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"volume\":\"57 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TD-ASIA.2009.5356821\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5356821","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The long-term transmission & substation plan in Korea power system
According to the Electricity Enterprises Act, The Chief of Ministry Knowledge Economy has to release “the Basic Plan for long term Electricity supply & demand” biannually in order to stabilize Korea electric power system. The Basic Plan for long term Electricity supply & demand is composed of government power policy, long-term power demand forecast, power plant expansion plan and so on. The planning period is 15 years considering nuclear power plant construction period. It was released on 29, DEC. 2008.