平衡电力可用性与能源效率

P.D. Sundmark
{"title":"平衡电力可用性与能源效率","authors":"P.D. Sundmark","doi":"10.1109/INTLEC.2006.251618","DOIUrl":null,"url":null,"abstract":"There are various ways to achieve a target level of power availability in a network power system. Each method comes with its inherent costs and benefits, pros and cons. Decisions on which method to pursue may result from previous practice, perceived cost effectiveness, vendor relationships, operational efficiencies and so on. Often the real cost of the alternatives is not known, or one of the parameters has changed, affecting all downstream decisions. Unit costs for standby generator kW capacity, total owning and operating costs per amp of DC plant, part load characteristics of rectifiers, are among issues that need to be better understood. This understanding should lead to a heightened sense of the \"big picture\", leading to better decisions on planning and design of power system infrastructure. Large amounts of capital and expense dollars are dedicated to installation and maintenance of network power plants, and it is incumbent on stakeholders to spend the money wisely","PeriodicalId":356699,"journal":{"name":"INTELEC 06 - Twenty-Eighth International Telecommunications Energy Conference","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Balancing Power Availability With Energy Efficiency\",\"authors\":\"P.D. Sundmark\",\"doi\":\"10.1109/INTLEC.2006.251618\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"There are various ways to achieve a target level of power availability in a network power system. Each method comes with its inherent costs and benefits, pros and cons. Decisions on which method to pursue may result from previous practice, perceived cost effectiveness, vendor relationships, operational efficiencies and so on. Often the real cost of the alternatives is not known, or one of the parameters has changed, affecting all downstream decisions. Unit costs for standby generator kW capacity, total owning and operating costs per amp of DC plant, part load characteristics of rectifiers, are among issues that need to be better understood. This understanding should lead to a heightened sense of the \\\"big picture\\\", leading to better decisions on planning and design of power system infrastructure. Large amounts of capital and expense dollars are dedicated to installation and maintenance of network power plants, and it is incumbent on stakeholders to spend the money wisely\",\"PeriodicalId\":356699,\"journal\":{\"name\":\"INTELEC 06 - Twenty-Eighth International Telecommunications Energy Conference\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-12-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"INTELEC 06 - Twenty-Eighth International Telecommunications Energy Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INTLEC.2006.251618\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"INTELEC 06 - Twenty-Eighth International Telecommunications Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.2006.251618","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在网络电力系统中,有多种方法可以达到目标水平的电力可用性。每种方法都有其固有的成本和收益,利弊。选择哪种方法的决定可能源于以前的实践、可感知的成本效益、供应商关系、操作效率等等。通常,替代方案的实际成本是未知的,或者其中一个参数发生了变化,从而影响了所有下游决策。备用发电机千瓦容量的单位成本,直流电厂每安培的总拥有和运行成本,整流器的部分负载特性,都是需要更好地理解的问题。这种理解应该会提高对“大局”的认识,从而在电力系统基础设施的规划和设计方面做出更好的决策。大量的资金和费用用于安装和维护电网发电厂,利益相关者有责任明智地使用这笔钱
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Balancing Power Availability With Energy Efficiency
There are various ways to achieve a target level of power availability in a network power system. Each method comes with its inherent costs and benefits, pros and cons. Decisions on which method to pursue may result from previous practice, perceived cost effectiveness, vendor relationships, operational efficiencies and so on. Often the real cost of the alternatives is not known, or one of the parameters has changed, affecting all downstream decisions. Unit costs for standby generator kW capacity, total owning and operating costs per amp of DC plant, part load characteristics of rectifiers, are among issues that need to be better understood. This understanding should lead to a heightened sense of the "big picture", leading to better decisions on planning and design of power system infrastructure. Large amounts of capital and expense dollars are dedicated to installation and maintenance of network power plants, and it is incumbent on stakeholders to spend the money wisely
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Active Clamp Converter with Full Resonant Switching Float Life Expectancy of VRLA-Batteries Based on High Temperature Float Tests Impact of Discharge Rate, Design and Test Parameter Extended Run Fuel Cell Backup Power: Solving the Hydrogen Problem Ground Fault Detection by Differential Monitoring of the Float Current Different Frequency Instabilities of Averaged Current Controlled Boost PFC AC-DC Regulators
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1