卷材场动态调度系统的研究与应用

Xuejun Zhang, Z. Lv
{"title":"卷材场动态调度系统的研究与应用","authors":"Xuejun Zhang, Z. Lv","doi":"10.1109/ICINFA.2013.6720450","DOIUrl":null,"url":null,"abstract":"The crane and ground scheduling is the most important part of the inventory management. In the inventory management process if there are two or more warehouses and two or more cranes in each house, it becomes very difficult to obtain an optimal or near optimal solution under consideration of restrictions concerning ground logistic control and crane interference as well as many restrictions for Inventory optimization. In this paper, we first propose a scheduling problem taking account of multiple sub-warehouses and multiple cranes. In order to study the problem, we constructed and validated a system prototype using Petri net model and then propose a two stage hybrid scheduling algorithm, which finds a sub-optimal solution by starting from a feasible solution and solves the problem in a finite time. The applied result shows that the dynamic scheduling system plays an important role in the inventory management and the algorithm achieves satisfactory result.","PeriodicalId":250844,"journal":{"name":"2013 IEEE International Conference on Information and Automation (ICIA)","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research and application of dynamic scheduling system of coil yard\",\"authors\":\"Xuejun Zhang, Z. Lv\",\"doi\":\"10.1109/ICINFA.2013.6720450\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The crane and ground scheduling is the most important part of the inventory management. In the inventory management process if there are two or more warehouses and two or more cranes in each house, it becomes very difficult to obtain an optimal or near optimal solution under consideration of restrictions concerning ground logistic control and crane interference as well as many restrictions for Inventory optimization. In this paper, we first propose a scheduling problem taking account of multiple sub-warehouses and multiple cranes. In order to study the problem, we constructed and validated a system prototype using Petri net model and then propose a two stage hybrid scheduling algorithm, which finds a sub-optimal solution by starting from a feasible solution and solves the problem in a finite time. The applied result shows that the dynamic scheduling system plays an important role in the inventory management and the algorithm achieves satisfactory result.\",\"PeriodicalId\":250844,\"journal\":{\"name\":\"2013 IEEE International Conference on Information and Automation (ICIA)\",\"volume\":\"20 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 IEEE International Conference on Information and Automation (ICIA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICINFA.2013.6720450\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE International Conference on Information and Automation (ICIA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICINFA.2013.6720450","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

起重机和地面调度是库存管理的重要组成部分。在库存管理过程中,如果每个房屋有两个或两个以上的仓库和两台或两台以上的起重机,在考虑地面物流控制和起重机干扰的限制以及库存优化的许多限制的情况下,很难获得最优或接近最优解。本文首先提出了一个考虑多个子仓库和多台起重机的调度问题。为了研究该问题,利用Petri网模型构建并验证了系统原型,提出了一种两阶段混合调度算法,该算法从可行解出发寻找次优解,并在有限时间内求解问题。应用结果表明,动态调度系统在库存管理中发挥了重要作用,该算法取得了满意的效果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Research and application of dynamic scheduling system of coil yard
The crane and ground scheduling is the most important part of the inventory management. In the inventory management process if there are two or more warehouses and two or more cranes in each house, it becomes very difficult to obtain an optimal or near optimal solution under consideration of restrictions concerning ground logistic control and crane interference as well as many restrictions for Inventory optimization. In this paper, we first propose a scheduling problem taking account of multiple sub-warehouses and multiple cranes. In order to study the problem, we constructed and validated a system prototype using Petri net model and then propose a two stage hybrid scheduling algorithm, which finds a sub-optimal solution by starting from a feasible solution and solves the problem in a finite time. The applied result shows that the dynamic scheduling system plays an important role in the inventory management and the algorithm achieves satisfactory result.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Data fusion method for underwater object localization GPMSwLF: Group physiological monitoring system with location function Phase noise suppression for OFDM system with sparse constraint A design of surgical actuator instruments of new continuum institutions and finite element analysis An estimation method of optimal feature factor based on the balance of exploration and exploitation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1