巴勒斯坦领土纳布卢斯-巴坦公路边坡失稳(原因、分析和补救措施)

Isam Jardaneh, Sami Hijjawi, George Odeh
{"title":"巴勒斯坦领土纳布卢斯-巴坦公路边坡失稳(原因、分析和补救措施)","authors":"Isam Jardaneh, Sami Hijjawi, George Odeh","doi":"10.4236/wjet.2021.93036","DOIUrl":null,"url":null,"abstract":"Nablus-Al Bathan Road which connects Nablus City and Jordan Valley in the West Bank of Palestinian Territories, was widened, reconstructed and rehabilitated in 2009, however, between 2010 and 2012 road defects at several locations were observed. To fix these defects especially at station 2 + 100 of the road, soil replacement in the body of the road and big boulders to support the edge of the road were used. Unfortunately, large settlement occurred in the part of the road under maintenance and more sliding and slope instability occurred in the road at station 2+ 100 during the remedial measures. Studies were carried out to find the causes of this problem. These included surveying of the area, geotechnical studies (making trial pits, performing geophysical seismic exploration and digging out several boreholes), in addition to slope stability analysis. It was found that the main causes of landslides were types of soils at the site, high slopes, groundwater recharged from rainfall and changing of weights (cut and fill). Remedy measures were suggested to overcome sliding problem based on available resources and local technology.","PeriodicalId":344331,"journal":{"name":"World Journal of Engineering and Technology","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Slope Instability at Nablus-Al Bathan Road, Palestinian Territories (Causes, Analysis and Remedy Measurements)\",\"authors\":\"Isam Jardaneh, Sami Hijjawi, George Odeh\",\"doi\":\"10.4236/wjet.2021.93036\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Nablus-Al Bathan Road which connects Nablus City and Jordan Valley in the West Bank of Palestinian Territories, was widened, reconstructed and rehabilitated in 2009, however, between 2010 and 2012 road defects at several locations were observed. To fix these defects especially at station 2 + 100 of the road, soil replacement in the body of the road and big boulders to support the edge of the road were used. Unfortunately, large settlement occurred in the part of the road under maintenance and more sliding and slope instability occurred in the road at station 2+ 100 during the remedial measures. Studies were carried out to find the causes of this problem. These included surveying of the area, geotechnical studies (making trial pits, performing geophysical seismic exploration and digging out several boreholes), in addition to slope stability analysis. It was found that the main causes of landslides were types of soils at the site, high slopes, groundwater recharged from rainfall and changing of weights (cut and fill). Remedy measures were suggested to overcome sliding problem based on available resources and local technology.\",\"PeriodicalId\":344331,\"journal\":{\"name\":\"World Journal of Engineering and Technology\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"World Journal of Engineering and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4236/wjet.2021.93036\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Journal of Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4236/wjet.2021.93036","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

连接纳布卢斯市和巴勒斯坦领土西岸约旦河谷的纳布卢斯-艾尔巴坦公路于2009年得到拓宽、重建和修复,但在2010年至2012年期间,有几个地方的道路出现了缺陷。为了修复这些缺陷,特别是在道路2 + 100站,采用了道路体土置换和大卵石支撑道路边缘的方法。不幸的是,养护路段出现较大沉降,2+ 100站道路在修复过程中出现较多滑动和边坡失稳现象。为找出这个问题的原因进行了研究。这些工作包括该地区的测量、岩土技术研究(制造试验坑、进行地球物理地震勘探和挖出几个钻孔)以及边坡稳定性分析。研究发现,滑坡的主要原因是场地土壤类型、高边坡、降雨补给的地下水和重量变化(切填法)。根据现有资源和当地技术,提出了克服滑动问题的补救措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Slope Instability at Nablus-Al Bathan Road, Palestinian Territories (Causes, Analysis and Remedy Measurements)
Nablus-Al Bathan Road which connects Nablus City and Jordan Valley in the West Bank of Palestinian Territories, was widened, reconstructed and rehabilitated in 2009, however, between 2010 and 2012 road defects at several locations were observed. To fix these defects especially at station 2 + 100 of the road, soil replacement in the body of the road and big boulders to support the edge of the road were used. Unfortunately, large settlement occurred in the part of the road under maintenance and more sliding and slope instability occurred in the road at station 2+ 100 during the remedial measures. Studies were carried out to find the causes of this problem. These included surveying of the area, geotechnical studies (making trial pits, performing geophysical seismic exploration and digging out several boreholes), in addition to slope stability analysis. It was found that the main causes of landslides were types of soils at the site, high slopes, groundwater recharged from rainfall and changing of weights (cut and fill). Remedy measures were suggested to overcome sliding problem based on available resources and local technology.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Research on Influencing Factors of Reservoir Construction Risk Based on Interpretative Structural Modeling Preliminary Exploration on the Application of Saussure Sign Concept in Bio-Inspired Design: A Case of Tiantoushui Doll-Design Comparative Analysis of Hybrid Controllers of Done Systems (UPFC) and Interphase Power Regulators Type RPI 30p15 on Contingency Management in Electrical Networks Bureaucratic Factors Impeding the Delivery of Infrastructure at the Metropolitan Municipal and District Assemblies (MMDAs) in Ghana Summary of Application of Fuzzy Mathematics in Construction Project Management
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1