Dhea Junestya Pradipta, I. N. P. Pradnyana, T. Raharjo
{"title":"海关总署项目管理新常态策略","authors":"Dhea Junestya Pradipta, I. N. P. Pradnyana, T. Raharjo","doi":"10.1109/IC2IE50715.2020.9274568","DOIUrl":null,"url":null,"abstract":"The Coronavirus Disease (COVID-19) pandemic in 2020 in Indonesia caused the Indonesian government to adopt New Normal as an adaptive step to mitigate the risk of the spread of COVID-19. The Directorate General of Customs and Excise (DGCE) as one of the government institutions participated in implementing the New Normal which affects the work patterns of employees, especially from project management. Based on interviews conducted, the implementation of the New Normal causes obstacles in project management in terms of time, cost, and performance. Therefore, top management wants to know what critical factors influence the success of a management project. This study conducted a Systematic Literature Review (SLR) and seven expert judgment to get an academic and practical view. From the results of the analysis, it is known that there are 22 critical success factors, five categories, and seven project management success criteria in DGCE with the New Normal condition.","PeriodicalId":211983,"journal":{"name":"2020 3rd International Conference on Computer and Informatics Engineering (IC2IE)","volume":"72 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"The New Normal Strategy for Project Management in Directorate General of Customs and Excise\",\"authors\":\"Dhea Junestya Pradipta, I. N. P. Pradnyana, T. Raharjo\",\"doi\":\"10.1109/IC2IE50715.2020.9274568\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Coronavirus Disease (COVID-19) pandemic in 2020 in Indonesia caused the Indonesian government to adopt New Normal as an adaptive step to mitigate the risk of the spread of COVID-19. The Directorate General of Customs and Excise (DGCE) as one of the government institutions participated in implementing the New Normal which affects the work patterns of employees, especially from project management. Based on interviews conducted, the implementation of the New Normal causes obstacles in project management in terms of time, cost, and performance. Therefore, top management wants to know what critical factors influence the success of a management project. This study conducted a Systematic Literature Review (SLR) and seven expert judgment to get an academic and practical view. From the results of the analysis, it is known that there are 22 critical success factors, five categories, and seven project management success criteria in DGCE with the New Normal condition.\",\"PeriodicalId\":211983,\"journal\":{\"name\":\"2020 3rd International Conference on Computer and Informatics Engineering (IC2IE)\",\"volume\":\"72 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 3rd International Conference on Computer and Informatics Engineering (IC2IE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IC2IE50715.2020.9274568\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 3rd International Conference on Computer and Informatics Engineering (IC2IE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IC2IE50715.2020.9274568","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The New Normal Strategy for Project Management in Directorate General of Customs and Excise
The Coronavirus Disease (COVID-19) pandemic in 2020 in Indonesia caused the Indonesian government to adopt New Normal as an adaptive step to mitigate the risk of the spread of COVID-19. The Directorate General of Customs and Excise (DGCE) as one of the government institutions participated in implementing the New Normal which affects the work patterns of employees, especially from project management. Based on interviews conducted, the implementation of the New Normal causes obstacles in project management in terms of time, cost, and performance. Therefore, top management wants to know what critical factors influence the success of a management project. This study conducted a Systematic Literature Review (SLR) and seven expert judgment to get an academic and practical view. From the results of the analysis, it is known that there are 22 critical success factors, five categories, and seven project management success criteria in DGCE with the New Normal condition.