{"title":"优化页岩油井ALS安装的创新井下设计","authors":"I. Cuneo, J. Ardito, G. Rivero","doi":"10.2118/190954-MS","DOIUrl":null,"url":null,"abstract":"\n The aim of this paper is to show how tubing (TBG) installation has evolved, with the problems and learning processes experienced along the brief history of exploitation of the Vaca Muerta formation in the Loma Campana field.\n The production behavior of wells from Vaca Muerta consists initially of flows close to 100m3/d, with sufficient pressure to produce natural flowing by the 5\" casing, controlled by an orifice at wellhead.\n Once the flowing period finishes, the well starts using mechanical pumping to keep producing with this system in the long term. Wells with a higher gas oil rate (GOR) are converted to plunger lift before resorting to mechanical pumping.\n Due to the fact that a well experiences different extraction stages in a relatively short period of time (flowing by casing - flowing by TBG - Plunger Lift - mechanical pumping), it is necessary to find an installation that is flexible enough to allow switching from one stage to the other with the least amount of slickline and pulling interventions.\n Likewise, the installation should be able to minimize the effects of sand and gas existing in Vaca Muerta, which affect the performance of mechanical pumping.\n Thus, this paper shows how TBG installations have changed to finally reach the current installation. This installation allows the conversion of a flowing by TGB installation into a mechanical pumping installation with gas buster, poor boy type, using slickline intervention and pump and rod running, thus avoiding the necessity of moving the TBG.","PeriodicalId":373819,"journal":{"name":"Day 3 Thu, August 30, 2018","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Innovative Downhole Design for Optimizing ALS Installation at Shale Oil Wells\",\"authors\":\"I. Cuneo, J. Ardito, G. Rivero\",\"doi\":\"10.2118/190954-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The aim of this paper is to show how tubing (TBG) installation has evolved, with the problems and learning processes experienced along the brief history of exploitation of the Vaca Muerta formation in the Loma Campana field.\\n The production behavior of wells from Vaca Muerta consists initially of flows close to 100m3/d, with sufficient pressure to produce natural flowing by the 5\\\" casing, controlled by an orifice at wellhead.\\n Once the flowing period finishes, the well starts using mechanical pumping to keep producing with this system in the long term. Wells with a higher gas oil rate (GOR) are converted to plunger lift before resorting to mechanical pumping.\\n Due to the fact that a well experiences different extraction stages in a relatively short period of time (flowing by casing - flowing by TBG - Plunger Lift - mechanical pumping), it is necessary to find an installation that is flexible enough to allow switching from one stage to the other with the least amount of slickline and pulling interventions.\\n Likewise, the installation should be able to minimize the effects of sand and gas existing in Vaca Muerta, which affect the performance of mechanical pumping.\\n Thus, this paper shows how TBG installations have changed to finally reach the current installation. This installation allows the conversion of a flowing by TGB installation into a mechanical pumping installation with gas buster, poor boy type, using slickline intervention and pump and rod running, thus avoiding the necessity of moving the TBG.\",\"PeriodicalId\":373819,\"journal\":{\"name\":\"Day 3 Thu, August 30, 2018\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-08-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, August 30, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/190954-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, August 30, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/190954-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文的目的是展示油管(TBG)安装的演变过程,以及在Loma Campana油田Vaca Muerta地层开发的短暂历史中所经历的问题和学习过程。Vaca Muerta地区的油井最初的生产流量接近100m3/d,有足够的压力通过5英寸套管产生自然流动,由井口的孔口控制。一旦流动周期结束,井开始使用机械泵来长期保持该系统的生产。在采用机械泵送之前,具有较高气油速率(GOR)的井将转换为柱塞举升。由于一口井在相对较短的时间内经历了不同的提取阶段(套管流动- TBG流动-柱塞举升-机械泵送),因此有必要找到一种足够灵活的装置,以便在最少的钢丝绳和拉拔干预下从一个阶段切换到另一个阶段。同样,安装应能够最大限度地减少Vaca Muerta中存在的砂和气的影响,这些影响会影响机械泵送的性能。因此,本文展示了TBG安装是如何变化到最终达到当前安装的。该装置可以将TGB流动装置转换为带有气体分离器的机械泵送装置,采用钢丝绳干预和泵杆下入,从而避免了移动TBG的必要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Innovative Downhole Design for Optimizing ALS Installation at Shale Oil Wells
The aim of this paper is to show how tubing (TBG) installation has evolved, with the problems and learning processes experienced along the brief history of exploitation of the Vaca Muerta formation in the Loma Campana field. The production behavior of wells from Vaca Muerta consists initially of flows close to 100m3/d, with sufficient pressure to produce natural flowing by the 5" casing, controlled by an orifice at wellhead. Once the flowing period finishes, the well starts using mechanical pumping to keep producing with this system in the long term. Wells with a higher gas oil rate (GOR) are converted to plunger lift before resorting to mechanical pumping. Due to the fact that a well experiences different extraction stages in a relatively short period of time (flowing by casing - flowing by TBG - Plunger Lift - mechanical pumping), it is necessary to find an installation that is flexible enough to allow switching from one stage to the other with the least amount of slickline and pulling interventions. Likewise, the installation should be able to minimize the effects of sand and gas existing in Vaca Muerta, which affect the performance of mechanical pumping. Thus, this paper shows how TBG installations have changed to finally reach the current installation. This installation allows the conversion of a flowing by TGB installation into a mechanical pumping installation with gas buster, poor boy type, using slickline intervention and pump and rod running, thus avoiding the necessity of moving the TBG.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Use of Run-Life Measures in Estimating Artificial Lift System Reliability Tuning VSDs in ESP Wells to Optimize Oil Production—Case Studies Innovative Well Designs for HGOR: Extending Gas Production with Common Gas Well Deliquification Techniques Innovative Downhole Design for Optimizing ALS Installation at Shale Oil Wells Getting Wells Back to Production Using an Innovative Artificial Lift System for Recovering Inactive Wells
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1