孟加拉电力危机:能源有限水电机组优化利用对系统可靠性和生产成本的影响

Q. Ahsan, M.T. Alam
{"title":"孟加拉电力危机:能源有限水电机组优化利用对系统可靠性和生产成本的影响","authors":"Q. Ahsan, M.T. Alam","doi":"10.1109/EPC.2007.4520315","DOIUrl":null,"url":null,"abstract":"Bangladesh power system (BPS) is forced to curtail electric demand during the peak hours; usually evening, of the day throughout the year and most of the hours of the day in the summer. Although the lower available generation capacity compared to demand is the reason of this crisis, however, it may be reduced if the present hydro resource is optimally utilized. This paper investigates the impacts of the exhaustive use of the existing energy limited (EL) hydro plant on the reliability and production cost with a view to provide a guideline to the system planner. It compares the reliability and production costs of BPS with the conventional use of hydro resource with those with the optimal hydro resource use. The investigation period ranges from the last one year to coming nineteen years. To create a feeling about the magnitude of the crisis among the utility planners and consumers the interruption cost of the unserved energy is evaluated. The simulation results seem to be useful for the system planners.","PeriodicalId":196861,"journal":{"name":"2007 IEEE Canada Electrical Power Conference","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Electrical Power Crisis in Bangladesh: Impacts of the Optimal Use of Energy Limited Hydro Unit on the System Reliability and Production Cost\",\"authors\":\"Q. Ahsan, M.T. Alam\",\"doi\":\"10.1109/EPC.2007.4520315\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Bangladesh power system (BPS) is forced to curtail electric demand during the peak hours; usually evening, of the day throughout the year and most of the hours of the day in the summer. Although the lower available generation capacity compared to demand is the reason of this crisis, however, it may be reduced if the present hydro resource is optimally utilized. This paper investigates the impacts of the exhaustive use of the existing energy limited (EL) hydro plant on the reliability and production cost with a view to provide a guideline to the system planner. It compares the reliability and production costs of BPS with the conventional use of hydro resource with those with the optimal hydro resource use. The investigation period ranges from the last one year to coming nineteen years. To create a feeling about the magnitude of the crisis among the utility planners and consumers the interruption cost of the unserved energy is evaluated. The simulation results seem to be useful for the system planners.\",\"PeriodicalId\":196861,\"journal\":{\"name\":\"2007 IEEE Canada Electrical Power Conference\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 IEEE Canada Electrical Power Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPC.2007.4520315\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Canada Electrical Power Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPC.2007.4520315","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

孟加拉国电力系统(BPS)被迫在高峰时段减少电力需求;通常是晚上,全年的白天和夏天的大部分时间。虽然与需求相比,可用发电能力较低是造成这场危机的原因,但是,如果目前的水力资源得到最佳利用,它可能会减少。本文研究了现有限能水电站穷竭利用对可靠性和生产成本的影响,以期为系统规划者提供指导。比较了常规利用水力资源和最优利用水力资源的管网的可靠性和生产成本。调查期从过去一年到未来十九年不等。为了在公用事业规划者和消费者之间建立一种对危机程度的感觉,对未服务能源的中断成本进行了评估。仿真结果对系统规划者有一定的参考价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Electrical Power Crisis in Bangladesh: Impacts of the Optimal Use of Energy Limited Hydro Unit on the System Reliability and Production Cost
Bangladesh power system (BPS) is forced to curtail electric demand during the peak hours; usually evening, of the day throughout the year and most of the hours of the day in the summer. Although the lower available generation capacity compared to demand is the reason of this crisis, however, it may be reduced if the present hydro resource is optimally utilized. This paper investigates the impacts of the exhaustive use of the existing energy limited (EL) hydro plant on the reliability and production cost with a view to provide a guideline to the system planner. It compares the reliability and production costs of BPS with the conventional use of hydro resource with those with the optimal hydro resource use. The investigation period ranges from the last one year to coming nineteen years. To create a feeling about the magnitude of the crisis among the utility planners and consumers the interruption cost of the unserved energy is evaluated. The simulation results seem to be useful for the system planners.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Variable Speed Wind Turbines Using Cage Rotor Induction Generators Connected to the Grid Exergy Concept and its Application PMSG Wind Turbine Performance Analysis During Short Circuit Faults Dynamic Voltage Stabilization of Stand-Alone Wind Energy Schemes Analysis of a Hybrid Current Source Converter with Bi-directional Power Flow Capability
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1