Single Stage Power Electronic Interface for a Fuel Cell Based Power Supply System 基于燃料电池供电系统的单级电力电子接口
Pub Date : 2007-10-01 DOI: 10.1109/EPC.2007.4520330
Shailendra Jain, Jin Jiang, Xinhong Huang, S. Stevandic
Fuel cell systems have generated significant interests in residential applications as well as distributed power generation due to their cleanliness, portability and suitability for electricity and heat generation. Development of a suitable power electronic interface to make the technology viable is still a challenge. This paper presents a single stage power electronic interface for fuel cell power plant suitable for stand alone application as well as for grid interface. A single stage PWM inverter is selected as a power electronic interface between fuel cell and the grid, followed by a LC filter and a step-up transformer. The simulation model is developed in MATLAB environment with control scheme implementation in qd-reference frame.
燃料电池系统由于其清洁、便携和适合发电和供热,在住宅应用和分布式发电方面产生了巨大的兴趣。开发合适的电力电子接口以使该技术可行仍然是一个挑战。本文提出了一种适用于燃料电池电站的单级电力电子接口,既适用于单机应用,也适用于并网接口。选择单级PWM逆变器作为燃料电池与电网之间的电力电子接口,其次是LC滤波器和升压变压器。仿真模型在MATLAB环境下建立,控制方案在qd参考系下实现。
{"title":"Single Stage Power Electronic Interface for a Fuel Cell Based Power Supply System","authors":"Shailendra Jain, Jin Jiang, Xinhong Huang, S. Stevandic","doi":"10.1109/EPC.2007.4520330","DOIUrl":"https://doi.org/10.1109/EPC.2007.4520330","url":null,"abstract":"Fuel cell systems have generated significant interests in residential applications as well as distributed power generation due to their cleanliness, portability and suitability for electricity and heat generation. Development of a suitable power electronic interface to make the technology viable is still a challenge. This paper presents a single stage power electronic interface for fuel cell power plant suitable for stand alone application as well as for grid interface. A single stage PWM inverter is selected as a power electronic interface between fuel cell and the grid, followed by a LC filter and a step-up transformer. The simulation model is developed in MATLAB environment with control scheme implementation in qd-reference frame.","PeriodicalId":196861,"journal":{"name":"2007 IEEE Canada Electrical Power Conference","volume":"80 2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2007-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127177622","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 16
Reactive Power Ancillary Service from Wind Farms 风电场无功辅助服务
Pub Date : 2007-10-01 DOI: 10.1109/EPC.2007.4520393
N. Ullah, Kankar Bhattacharya, T. Thiringer
Reactive power/voltage control support, temporary primary frequency control support, power oscillation damping support are some of the functions that can be provided by modern wind farms (WFs) equipped with variable speed wind turbines (VSWT) with power electronic converters. This paper examines the possibility of WFs providing reactive power support to the grid system as part of ancillary service provisions. Detailed analysis of the WF capability curve is carried out, and a reactive power cost model is developed for wind turbine generators that can help the market operator or the independent system operator (ISO) in managing the system and the grid efficiently. The Cigre-32 bus test system is used to demonstrate a case study showing a 24-hour calculation of 10-minute average system operation cost considering the incoming wind energy.
无功功率/电压控制支持,临时一次频率控制支持,功率振荡阻尼支持是配备变速风力涡轮机(VSWT)的现代风电场(wf)可以提供的一些功能。本文考察了WFs作为辅助服务条款的一部分向电网系统提供无功支持的可能性。在对WF能力曲线进行详细分析的基础上,建立了风电机组无功成本模型,该模型可以帮助市场运营商或独立系统运营商(ISO)有效地管理系统和电网。Cigre-32总线测试系统用于演示一个案例研究,该案例研究显示了考虑进入风能的10分钟平均系统运行成本的24小时计算。
{"title":"Reactive Power Ancillary Service from Wind Farms","authors":"N. Ullah, Kankar Bhattacharya, T. Thiringer","doi":"10.1109/EPC.2007.4520393","DOIUrl":"https://doi.org/10.1109/EPC.2007.4520393","url":null,"abstract":"Reactive power/voltage control support, temporary primary frequency control support, power oscillation damping support are some of the functions that can be provided by modern wind farms (WFs) equipped with variable speed wind turbines (VSWT) with power electronic converters. This paper examines the possibility of WFs providing reactive power support to the grid system as part of ancillary service provisions. Detailed analysis of the WF capability curve is carried out, and a reactive power cost model is developed for wind turbine generators that can help the market operator or the independent system operator (ISO) in managing the system and the grid efficiently. The Cigre-32 bus test system is used to demonstrate a case study showing a 24-hour calculation of 10-minute average system operation cost considering the incoming wind energy.","PeriodicalId":196861,"journal":{"name":"2007 IEEE Canada Electrical Power Conference","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2007-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125904060","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 9
Analysis of Harmonic Reduction for Synchronized Phase-shifted Parallel PWM Inverters with Current Sharing Reactors 共流电抗器同步移相并联PWM逆变器谐波抑制分析
Pub Date : 2007-10-01 DOI: 10.1109/EPC.2007.4520319
N. Benaifa, H. Bierk, A. Rahim, E. Nowicki
Renewable energy sources are quickly becoming incorporated into increasingly distributed electrical utility grids. An ever present issue when interfacing these sources is that of harmonic distortion reduction at the inter-tie point. One very interesting approach to reduce harmonic distortion is to synchronize power transistor operation for inverters operating in parallel. In this paper, a rarely employed technique for harmonic reduction using synchronized phase shifted parallel PWM inverters with current-sharing reactors is presented and analyzed. Using the technique presented inverter output distortion can be reduced significantly, for example total harmonic reduction can be reduced typically in half using just two synchronized phase-shifted parallel inverters (our simulation and experimental studies indicate that even smaller distortion reduction factors can be achieved). We present analyses for two and three phase-shifted inverters operated in parallel employing current sharing reactors. Our analyses consider the impact of a wide range of phase-shift delays on net output total harmonic distortion, with the phase-shift delay from zero to one entire cycle of the fundamental component. Some results are expected, such as a dramatic increase in distortion when the fundamental components between multiple inverters tend to cancel out, on the other hand it is interesting to observe a leveling-off, and gradual, smooth increase in the distortion reduction factor over a significant portion of the phase-shift delay variable.
可再生能源正迅速被纳入日益分散的电网。当连接这些源时,一个始终存在的问题是在连接点处谐波失真的减少。一个非常有趣的方法来减少谐波失真是同步功率晶体管工作的逆变器并联工作。本文提出并分析了一种很少采用的同步移相并联PWM逆变器谐波抑制技术。使用该技术可以显著降低逆变器输出失真,例如,仅使用两个同步移相并联逆变器,总谐波降低通常可以减少一半(我们的仿真和实验研究表明,可以实现更小的失真降低因子)。我们提出了两个和三个相移逆变器并联运行采用电流共享电抗器的分析。我们的分析考虑了大范围的相移延迟对净输出总谐波失真的影响,其中基本分量的相移延迟从零到一个整个周期。一些结果是预期的,例如,当多个逆变器之间的基本分量趋于抵消时,失真会急剧增加,另一方面,有趣的是,在相移延迟变量的很大一部分上,观察到失真减小因子趋于平稳,并且逐渐平滑地增加。
{"title":"Analysis of Harmonic Reduction for Synchronized Phase-shifted Parallel PWM Inverters with Current Sharing Reactors","authors":"N. Benaifa, H. Bierk, A. Rahim, E. Nowicki","doi":"10.1109/EPC.2007.4520319","DOIUrl":"https://doi.org/10.1109/EPC.2007.4520319","url":null,"abstract":"Renewable energy sources are quickly becoming incorporated into increasingly distributed electrical utility grids. An ever present issue when interfacing these sources is that of harmonic distortion reduction at the inter-tie point. One very interesting approach to reduce harmonic distortion is to synchronize power transistor operation for inverters operating in parallel. In this paper, a rarely employed technique for harmonic reduction using synchronized phase shifted parallel PWM inverters with current-sharing reactors is presented and analyzed. Using the technique presented inverter output distortion can be reduced significantly, for example total harmonic reduction can be reduced typically in half using just two synchronized phase-shifted parallel inverters (our simulation and experimental studies indicate that even smaller distortion reduction factors can be achieved). We present analyses for two and three phase-shifted inverters operated in parallel employing current sharing reactors. Our analyses consider the impact of a wide range of phase-shift delays on net output total harmonic distortion, with the phase-shift delay from zero to one entire cycle of the fundamental component. Some results are expected, such as a dramatic increase in distortion when the fundamental components between multiple inverters tend to cancel out, on the other hand it is interesting to observe a leveling-off, and gradual, smooth increase in the distortion reduction factor over a significant portion of the phase-shift delay variable.","PeriodicalId":196861,"journal":{"name":"2007 IEEE Canada Electrical Power Conference","volume":"67 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2007-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116062167","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 10
Development of Investment Strategies for Wind Power Generation 风力发电投资策略的发展
Pub Date : 2007-10-01 DOI: 10.1109/EPC.2007.4520348
C. Kongnam, S. Nuchprayoon
This paper develops investment strategies for wind power generation under the assumption that generation capacity and investment resources are flexible. The investment problem is formulated as a mixed-integer programming problem with the constraints specified as intervals and the net present value of generation profits as the objective. The optimum solutions are expressed in terms of number and size of each wind turbine model. The screening & ranking method is proposed to identify the most attractive investment plan among multiple optimum solutions. Sensitivity analysis is then performed to assess the impact of investment parameters. Numerical simulations have been tested with actual wind speed data and a simplified model of wind power project in the southern coast of Thailand.
本文在发电能力和投资资源是灵活的前提下,研究了风电的投资策略。将投资问题表述为一个混合整数规划问题,约束条件为区间,目标为生产利润的净现值。最优解以每个风力机模型的数量和尺寸表示。提出了筛选排序法,从多个最优方案中找出最具吸引力的投资方案。然后进行敏感性分析以评估投资参数的影响。利用实际风速数据和泰国南部沿海风电项目的简化模型对数值模拟进行了验证。
{"title":"Development of Investment Strategies for Wind Power Generation","authors":"C. Kongnam, S. Nuchprayoon","doi":"10.1109/EPC.2007.4520348","DOIUrl":"https://doi.org/10.1109/EPC.2007.4520348","url":null,"abstract":"This paper develops investment strategies for wind power generation under the assumption that generation capacity and investment resources are flexible. The investment problem is formulated as a mixed-integer programming problem with the constraints specified as intervals and the net present value of generation profits as the objective. The optimum solutions are expressed in terms of number and size of each wind turbine model. The screening & ranking method is proposed to identify the most attractive investment plan among multiple optimum solutions. Sensitivity analysis is then performed to assess the impact of investment parameters. Numerical simulations have been tested with actual wind speed data and a simplified model of wind power project in the southern coast of Thailand.","PeriodicalId":196861,"journal":{"name":"2007 IEEE Canada Electrical Power Conference","volume":"96 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2007-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122531399","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 12
Impact of Large-Scale Distributed Energy Sources Under Government Incentive Programs: An Example 政府激励计划下大规模分布式能源的影响:一个例子
Pub Date : 2007-10-01 DOI: 10.1109/EPC.2007.4520334
A. Moore, J. Jiang
The province of Ontario has introduced a new program called the Clean Energy Standard Offer Program to encourage the development of new clean generation capacity in the province. The possibility exists in the near future that generation IV nuclear power plants will provide cost effective and reliable delivery of hydrogen to residences in Ontario. Hybrid generation consisting of a hydrogen fuel cell and photovoltaic arrays installed in a large number of residences can meet 45% of the annual demand for all of the residences of a representative city during the hours of peak demand.
安大略省推出了一项名为“清洁能源标准提供计划”的新项目,以鼓励该省发展新的清洁发电能力。在不久的将来,第四代核电站有可能为安大略省的居民提供成本效益高、可靠的氢气供应。由氢燃料电池和光伏阵列组成的混合发电系统安装在大量住宅中,可以满足一个代表性城市在需求高峰时段所有住宅年需求的45%。
{"title":"Impact of Large-Scale Distributed Energy Sources Under Government Incentive Programs: An Example","authors":"A. Moore, J. Jiang","doi":"10.1109/EPC.2007.4520334","DOIUrl":"https://doi.org/10.1109/EPC.2007.4520334","url":null,"abstract":"The province of Ontario has introduced a new program called the Clean Energy Standard Offer Program to encourage the development of new clean generation capacity in the province. The possibility exists in the near future that generation IV nuclear power plants will provide cost effective and reliable delivery of hydrogen to residences in Ontario. Hybrid generation consisting of a hydrogen fuel cell and photovoltaic arrays installed in a large number of residences can meet 45% of the annual demand for all of the residences of a representative city during the hours of peak demand.","PeriodicalId":196861,"journal":{"name":"2007 IEEE Canada Electrical Power Conference","volume":"11 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2007-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129367894","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
DSM Approach for Water Heater Control Strategy Utilizing Elman Neural Network 基于Elman神经网络的电热水器控制策略的DSM方法
Pub Date : 2007-10-01 DOI: 10.1109/EPC.2007.4520362
Y. M. Atwa, E. El-Saadany, M. Salama
This paper describes an artificial neural network based demand-side management (DSM) strategy to shift the peaks of the average residential electrical water heater power demand profile from periods of high demand to off peak periods. The DSM strategy is achieved by dividing the water heaters connected to certain distribution feeder into blocks and controlling each block by a different individual neural network controller. The proposed control schemes will consider an adequate representation of the customers' specifications and preferences. Simulation results are presented to show the effectiveness of the proposed DSM strategy to shift the average electrical water heater peak demand to off peak periods and to level the utility distribution demand profile.
本文介绍了一种基于人工神经网络的需求侧管理策略,将住宅电热水器平均电力需求曲线的峰值从高需求期转移到非高峰期。用电需求侧管理策略是通过将连接到某配电馈线的热水器划分成若干块,并通过不同的单个神经网络控制器对每个块进行控制来实现的。建议的控制方案将考虑充分代表客户的规格和偏好。仿真结果表明,所提出的需求侧管理策略能够有效地将电热水器的平均高峰需求转移到非高峰时段,并使公用事业分配需求曲线保持平衡。
{"title":"DSM Approach for Water Heater Control Strategy Utilizing Elman Neural Network","authors":"Y. M. Atwa, E. El-Saadany, M. Salama","doi":"10.1109/EPC.2007.4520362","DOIUrl":"https://doi.org/10.1109/EPC.2007.4520362","url":null,"abstract":"This paper describes an artificial neural network based demand-side management (DSM) strategy to shift the peaks of the average residential electrical water heater power demand profile from periods of high demand to off peak periods. The DSM strategy is achieved by dividing the water heaters connected to certain distribution feeder into blocks and controlling each block by a different individual neural network controller. The proposed control schemes will consider an adequate representation of the customers' specifications and preferences. Simulation results are presented to show the effectiveness of the proposed DSM strategy to shift the average electrical water heater peak demand to off peak periods and to level the utility distribution demand profile.","PeriodicalId":196861,"journal":{"name":"2007 IEEE Canada Electrical Power Conference","volume":"30 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2007-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123661167","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 9
Wind Power in Ontario: An Economical Valuation 安大略省的风力发电:经济评估
Pub Date : 2007-10-01 DOI: 10.1109/EPC.2007.4520382
Mohammed H. Albadi, E. El-Saadany
This paper presents an economical valuation for wind energy projects according to the Ontario's feed-in tariff, the Standard Offer Program (SOP). The study is done for different wind turbines and different wind speed scenarios. Given turbine and wind speed data, the Capacity Factor (CF) of each turbine at each site was calculated. Net Present Value (NPV) and Internal Rate of Return (IRR) for different scenarios were calculated.
本文根据安大略省的上网电价标准方案(SOP)对风电项目进行了经济评估。这项研究是针对不同的风力涡轮机和不同的风速场景进行的。在给定风力机和风速数据的情况下,计算了每个场址每台风力机的容量系数(CF)。计算了不同情景下的净现值(NPV)和内部收益率(IRR)。
{"title":"Wind Power in Ontario: An Economical Valuation","authors":"Mohammed H. Albadi, E. El-Saadany","doi":"10.1109/EPC.2007.4520382","DOIUrl":"https://doi.org/10.1109/EPC.2007.4520382","url":null,"abstract":"This paper presents an economical valuation for wind energy projects according to the Ontario's feed-in tariff, the Standard Offer Program (SOP). The study is done for different wind turbines and different wind speed scenarios. Given turbine and wind speed data, the Capacity Factor (CF) of each turbine at each site was calculated. Net Present Value (NPV) and Internal Rate of Return (IRR) for different scenarios were calculated.","PeriodicalId":196861,"journal":{"name":"2007 IEEE Canada Electrical Power Conference","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2007-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114687115","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 7
Dynamic analysis and field verification of an innovative anti-islanding protection scheme based on directional reactive power detection 基于定向无功检测的新型防孤岛保护方案动态分析与现场验证
Pub Date : 2007-10-01 DOI: 10.1109/EPC.2007.4520327
F. Katiraei, A. Foss, C. Abbey, B. Strehler
Based on current utility practice, anti-islanding protection is one of the main protection requirements for interconnection of a distribution generation (DG) to the medium and low voltage grids. For connecting a small synchronous generator to the utility grid, DG interconnection guidelines require the use of a transfer-trip scheme when the minimum load of a connecting feeder is less than twice the rated capacity of the total DG units. Some standards (e.g. IEEE Std. 1547) suggest a more aggressive generation to load ratio of one-third. Implementation of a fast communication based transfer-trip scheme with a detection time of less than a second is very expensive and not economically feasible for small DG projects. The fast islanding detection is mainly required to comply with the feeder protection coordination, especially the first reclosing time of the feeder automatic reclosure (in this case 1.5 seconds). This paper presents the computer modelling, simulation, and field verification of a proposed passive, local anti-islanding protection scheme based on directional reactive power measurement. The protection scheme was tested on a farm-based biogas DG to demonstrate compliance with the utility requirements. The detailed simulation studies and field tests consistently yielded detection times of less than 0.25 seconds. Based on these results the solution and the DG interconnection were approved by the utility. The proposed protection scheme can effectively be utilized for anti-islanding protection of synchronous generator based DG units on feeders with inductive load.
从目前的用电实践来看,防孤岛保护是配电网与中低压电网互联的主要保护要求之一。为了将小型同步发电机连接到公用电网,当连接馈线的最小负荷小于总DG机组额定容量的两倍时,DG互连指南要求使用转移跳闸方案。一些标准(例如IEEE Std. 1547)建议更激进的发电负载比为三分之一。实现一种基于快速通信的传输行程方案,检测时间小于一秒,这是非常昂贵的,对于小型DG项目来说在经济上是不可行的。快速孤岛检测主要要求符合给料机保护配合,特别是给料机自动重合闸的第一次重合闸时间(本例为1.5秒)。本文提出了一种基于定向无功功率测量的无源局部防孤岛保护方案的计算机建模、仿真和现场验证。该保护计划已在一个以农场为基地的沼气DG进行测试,以证明符合公用事业规定。详细的模拟研究和现场测试结果一致表明,探测时间小于0.25秒。基于这些结果,该解决方案和DG互连得到了公用事业公司的认可。该保护方案可有效地应用于带感性负荷馈线上同步发电机组的防孤岛保护。
{"title":"Dynamic analysis and field verification of an innovative anti-islanding protection scheme based on directional reactive power detection","authors":"F. Katiraei, A. Foss, C. Abbey, B. Strehler","doi":"10.1109/EPC.2007.4520327","DOIUrl":"https://doi.org/10.1109/EPC.2007.4520327","url":null,"abstract":"Based on current utility practice, anti-islanding protection is one of the main protection requirements for interconnection of a distribution generation (DG) to the medium and low voltage grids. For connecting a small synchronous generator to the utility grid, DG interconnection guidelines require the use of a transfer-trip scheme when the minimum load of a connecting feeder is less than twice the rated capacity of the total DG units. Some standards (e.g. IEEE Std. 1547) suggest a more aggressive generation to load ratio of one-third. Implementation of a fast communication based transfer-trip scheme with a detection time of less than a second is very expensive and not economically feasible for small DG projects. The fast islanding detection is mainly required to comply with the feeder protection coordination, especially the first reclosing time of the feeder automatic reclosure (in this case 1.5 seconds). This paper presents the computer modelling, simulation, and field verification of a proposed passive, local anti-islanding protection scheme based on directional reactive power measurement. The protection scheme was tested on a farm-based biogas DG to demonstrate compliance with the utility requirements. The detailed simulation studies and field tests consistently yielded detection times of less than 0.25 seconds. Based on these results the solution and the DG interconnection were approved by the utility. The proposed protection scheme can effectively be utilized for anti-islanding protection of synchronous generator based DG units on feeders with inductive load.","PeriodicalId":196861,"journal":{"name":"2007 IEEE Canada Electrical Power Conference","volume":"17 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2007-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127817100","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 21
A Practical Method for Estimation of Fault Ride-Through Capability of Wind Power Farms Based on Squirrel-Cage Rotor Induction Generators 基于鼠笼转子感应发电机的风电场故障穿越能力实用估计方法
Pub Date : 2007-10-01 DOI: 10.1109/EPC.2007.4520310
A. Grilo, D. Salles, W. Freitas, C. Murari
This paper presents a practical method for estimation of fault ride-through capability of wind power farms composed by squirrel-cage rotor induction generators. The proposed method is based on the steady-state equivalent circuit of the induction generator and on the concepts of stable and unstable electrical-mechanical equilibrium points, which are calculated in the electrical and mechanical torque versus rotor speed space. The method has been validated by comparing the results obtained by the analytical method with those determined by dynamic simulation results.
提出了一种实用的鼠笼式转子感应发电机组成的风电场故障通过能力估计方法。该方法基于感应发电机的稳态等效电路和稳定和不稳定的机电平衡点的概念,在电机转矩和转子转速空间中计算机电平衡点。通过将解析法得到的结果与动态仿真结果进行比较,验证了该方法的有效性。
{"title":"A Practical Method for Estimation of Fault Ride-Through Capability of Wind Power Farms Based on Squirrel-Cage Rotor Induction Generators","authors":"A. Grilo, D. Salles, W. Freitas, C. Murari","doi":"10.1109/EPC.2007.4520310","DOIUrl":"https://doi.org/10.1109/EPC.2007.4520310","url":null,"abstract":"This paper presents a practical method for estimation of fault ride-through capability of wind power farms composed by squirrel-cage rotor induction generators. The proposed method is based on the steady-state equivalent circuit of the induction generator and on the concepts of stable and unstable electrical-mechanical equilibrium points, which are calculated in the electrical and mechanical torque versus rotor speed space. The method has been validated by comparing the results obtained by the analytical method with those determined by dynamic simulation results.","PeriodicalId":196861,"journal":{"name":"2007 IEEE Canada Electrical Power Conference","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2007-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124217761","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Analysis of a Hybrid Current Source Converter with Bi-directional Power Flow Capability 具有双向潮流能力的混合电流源变换器的分析
Pub Date : 2007-10-01 DOI: 10.1109/EPC.2007.4520318
M. Naguib, L. Lopes
Current source converters (CSCs) present the desirable characteristics of inherent load and converter short- circuit protection. Silicon controlled rectifiers (SCR) based CSCs are rugged and affordable but they create low order harmonics and do not allow active and reactive power to be controlled independently. These drawbacks can be overcome with topologies based on more costly force-commutated switches. This paper proposes a hybrid three-phase CSC that employs three SCRs and four IGBTs and presents features comparable to the fully controllable CSC. The inherent commutation constraints of the SCRs are taken into consideration in the selection of a suitable space vector (SV) modulation technique. Comparisons with the fully controllable CSC are provided for a fair assessment of the potential of the proposed hybrid CSC. The theoretical analysis is verified by means of simulations.
电流源变换器(CSCs)具有固有负载和变换器短路保护的优良特性。基于硅控整流器(SCR)的CSCs坚固耐用且价格合理,但它们产生低次谐波,并且不允许独立控制有功和无功功率。这些缺点可以通过基于更昂贵的强制换流开关的拓扑来克服。本文提出了一种混合三相CSC,采用三个可控硅和四个igbt,具有与完全可控CSC相当的特性。在选择合适的空间矢量(SV)调制技术时,考虑了晶闸管固有的换相约束。并与完全可控CSC进行了比较,对所提出的混合CSC的潜力进行了公平的评估。通过仿真验证了理论分析的正确性。
{"title":"Analysis of a Hybrid Current Source Converter with Bi-directional Power Flow Capability","authors":"M. Naguib, L. Lopes","doi":"10.1109/EPC.2007.4520318","DOIUrl":"https://doi.org/10.1109/EPC.2007.4520318","url":null,"abstract":"Current source converters (CSCs) present the desirable characteristics of inherent load and converter short- circuit protection. Silicon controlled rectifiers (SCR) based CSCs are rugged and affordable but they create low order harmonics and do not allow active and reactive power to be controlled independently. These drawbacks can be overcome with topologies based on more costly force-commutated switches. This paper proposes a hybrid three-phase CSC that employs three SCRs and four IGBTs and presents features comparable to the fully controllable CSC. The inherent commutation constraints of the SCRs are taken into consideration in the selection of a suitable space vector (SV) modulation technique. Comparisons with the fully controllable CSC are provided for a fair assessment of the potential of the proposed hybrid CSC. The theoretical analysis is verified by means of simulations.","PeriodicalId":196861,"journal":{"name":"2007 IEEE Canada Electrical Power Conference","volume":"299 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2007-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114577239","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 5
期刊
2007 IEEE Canada Electrical Power Conference
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1