{"title":"A制造企业库存周期的风险分析","authors":"Hana Nurila Alfatin, Lianny Leo","doi":"10.2991/aprish-18.2019.20","DOIUrl":null,"url":null,"abstract":"This study aims to analyze risk management in the inventory cycle of manufacturing companies and aims to provide recommendations to reduce identified risks. This study uses small and medium enterprises as a case study because it has limited resources to respond to potential risks that threaten business continuity. The method used is qualitative descriptive method with case study approach. Data obtained through document analysis, observation, and in-depth interview. The results show that there are risks identified in the inventory cycle that have not been mitigated by the company's internal controls. Risk maturity assessment conducted before the study showed that the company was at the risk level of naïve and increased to risk defined after the research. Keywords—Risk analysis, Inventory cycle, Manufacturing, Small medium enterprise","PeriodicalId":111073,"journal":{"name":"Proceedings of the 3rd Asia-Pacific Research in Social Sciences and Humanities Universitas Indonesia Conference (APRISH 2018)","volume":"76 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Risk Analysis in A Manufacturing Company's Inventory Cycle\",\"authors\":\"Hana Nurila Alfatin, Lianny Leo\",\"doi\":\"10.2991/aprish-18.2019.20\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study aims to analyze risk management in the inventory cycle of manufacturing companies and aims to provide recommendations to reduce identified risks. This study uses small and medium enterprises as a case study because it has limited resources to respond to potential risks that threaten business continuity. The method used is qualitative descriptive method with case study approach. Data obtained through document analysis, observation, and in-depth interview. The results show that there are risks identified in the inventory cycle that have not been mitigated by the company's internal controls. Risk maturity assessment conducted before the study showed that the company was at the risk level of naïve and increased to risk defined after the research. Keywords—Risk analysis, Inventory cycle, Manufacturing, Small medium enterprise\",\"PeriodicalId\":111073,\"journal\":{\"name\":\"Proceedings of the 3rd Asia-Pacific Research in Social Sciences and Humanities Universitas Indonesia Conference (APRISH 2018)\",\"volume\":\"76 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 3rd Asia-Pacific Research in Social Sciences and Humanities Universitas Indonesia Conference (APRISH 2018)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2991/aprish-18.2019.20\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 3rd Asia-Pacific Research in Social Sciences and Humanities Universitas Indonesia Conference (APRISH 2018)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/aprish-18.2019.20","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Risk Analysis in A Manufacturing Company's Inventory Cycle
This study aims to analyze risk management in the inventory cycle of manufacturing companies and aims to provide recommendations to reduce identified risks. This study uses small and medium enterprises as a case study because it has limited resources to respond to potential risks that threaten business continuity. The method used is qualitative descriptive method with case study approach. Data obtained through document analysis, observation, and in-depth interview. The results show that there are risks identified in the inventory cycle that have not been mitigated by the company's internal controls. Risk maturity assessment conducted before the study showed that the company was at the risk level of naïve and increased to risk defined after the research. Keywords—Risk analysis, Inventory cycle, Manufacturing, Small medium enterprise