Fabiano Lima, L. Pereira, José Santos, R. Costa, Á. Dias
{"title":"奥运会和残奥会项目结构与治理:以奥运会和残奥会为例","authors":"Fabiano Lima, L. Pereira, José Santos, R. Costa, Á. Dias","doi":"10.4018/ijitpm.290420","DOIUrl":null,"url":null,"abstract":"The Olympic and Paralympic Games is a megaproject that involves huge investment and time effort from public and private entities to take place, which has been facing issues to find host candidate cities recently. This paper focus on the private side of the megaproject and discuss the Organizing Committee for Olympic Games (OCOG) project governance and structure taking advantage of Rio2016 case to detail project phases, reporting and governance structures. The paper presents the OCOG as a single purpose entity (SPE) and uses Rio2016 as a case study. A multi-method qualitative research was conducted to understand OCOG project environment and particularities. The role and participation of International Olympic Committee (IOC) in OCOG daily life could be improved to support the pressure for Games cost reduction, as well as, to increase the Games hosting attractiveness. This work contributes for the Olympic Games project environment understanding by future OCOGs","PeriodicalId":375999,"journal":{"name":"Int. J. Inf. Technol. Proj. Manag.","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Olympic and Paralympic Games Project Structure and Governance: The Case of Olympic and Paralympic Games\",\"authors\":\"Fabiano Lima, L. Pereira, José Santos, R. Costa, Á. Dias\",\"doi\":\"10.4018/ijitpm.290420\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Olympic and Paralympic Games is a megaproject that involves huge investment and time effort from public and private entities to take place, which has been facing issues to find host candidate cities recently. This paper focus on the private side of the megaproject and discuss the Organizing Committee for Olympic Games (OCOG) project governance and structure taking advantage of Rio2016 case to detail project phases, reporting and governance structures. The paper presents the OCOG as a single purpose entity (SPE) and uses Rio2016 as a case study. A multi-method qualitative research was conducted to understand OCOG project environment and particularities. The role and participation of International Olympic Committee (IOC) in OCOG daily life could be improved to support the pressure for Games cost reduction, as well as, to increase the Games hosting attractiveness. This work contributes for the Olympic Games project environment understanding by future OCOGs\",\"PeriodicalId\":375999,\"journal\":{\"name\":\"Int. J. Inf. Technol. Proj. Manag.\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Int. J. Inf. Technol. Proj. Manag.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4018/ijitpm.290420\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Inf. Technol. Proj. Manag.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/ijitpm.290420","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Olympic and Paralympic Games Project Structure and Governance: The Case of Olympic and Paralympic Games
The Olympic and Paralympic Games is a megaproject that involves huge investment and time effort from public and private entities to take place, which has been facing issues to find host candidate cities recently. This paper focus on the private side of the megaproject and discuss the Organizing Committee for Olympic Games (OCOG) project governance and structure taking advantage of Rio2016 case to detail project phases, reporting and governance structures. The paper presents the OCOG as a single purpose entity (SPE) and uses Rio2016 as a case study. A multi-method qualitative research was conducted to understand OCOG project environment and particularities. The role and participation of International Olympic Committee (IOC) in OCOG daily life could be improved to support the pressure for Games cost reduction, as well as, to increase the Games hosting attractiveness. This work contributes for the Olympic Games project environment understanding by future OCOGs