大容量输电系统拥塞实时管理分析系统

V. Nechataev, G. Krost, J. Vanzetta, M. Rogge
{"title":"大容量输电系统拥塞实时管理分析系统","authors":"V. Nechataev, G. Krost, J. Vanzetta, M. Rogge","doi":"10.1109/CIGRE.2005.1532740","DOIUrl":null,"url":null,"abstract":"A tool was developed supporting transmission system operators (TSO) fast and in non-discriminatory manner in redistributing active power generation in cases of sudden and unexpected overload of lines or transformers. Despite of scrutinized generation schedules such situations might happen in cases of system failure or large uncertain (e.g., wind) power production. The system is based on SCADA information and delivers concrete and well measured suggestions to the operator, indicating the generation of which generators should be adjusted in order to remove the occurred overload, see principle sketch fig. 1, and is able to optionally account for generation displacement cost, too. It was developed in close cooperation of a university and a TSO in Germany and successfully verified on the basis of real bulk power system data","PeriodicalId":414346,"journal":{"name":"International Symposium CIGRE/IEEE PES, 2005.","volume":"55 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-11-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Analysis system for real time management of congestions in bulk transmission systems\",\"authors\":\"V. Nechataev, G. Krost, J. Vanzetta, M. Rogge\",\"doi\":\"10.1109/CIGRE.2005.1532740\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A tool was developed supporting transmission system operators (TSO) fast and in non-discriminatory manner in redistributing active power generation in cases of sudden and unexpected overload of lines or transformers. Despite of scrutinized generation schedules such situations might happen in cases of system failure or large uncertain (e.g., wind) power production. The system is based on SCADA information and delivers concrete and well measured suggestions to the operator, indicating the generation of which generators should be adjusted in order to remove the occurred overload, see principle sketch fig. 1, and is able to optionally account for generation displacement cost, too. It was developed in close cooperation of a university and a TSO in Germany and successfully verified on the basis of real bulk power system data\",\"PeriodicalId\":414346,\"journal\":{\"name\":\"International Symposium CIGRE/IEEE PES, 2005.\",\"volume\":\"55 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-11-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Symposium CIGRE/IEEE PES, 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CIGRE.2005.1532740\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Symposium CIGRE/IEEE PES, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIGRE.2005.1532740","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

开发了一种工具,支持输电系统运营商(TSO)在线路或变压器突然和意外过载的情况下,以快速和非歧视的方式重新分配有功发电。尽管有严格的发电计划,但这种情况可能发生在系统故障或大量不确定的情况下(例如,风力发电)。该系统基于SCADA信息,并向运营商提供具体且经过测量的建议,指示应调整哪些发电机的发电量以消除发生的过载,参见原理草图图1,并且还可以选择考虑发电位移成本。它是由德国一所大学和一家TSO密切合作开发的,并在实际大容量电力系统数据的基础上成功验证
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Analysis system for real time management of congestions in bulk transmission systems
A tool was developed supporting transmission system operators (TSO) fast and in non-discriminatory manner in redistributing active power generation in cases of sudden and unexpected overload of lines or transformers. Despite of scrutinized generation schedules such situations might happen in cases of system failure or large uncertain (e.g., wind) power production. The system is based on SCADA information and delivers concrete and well measured suggestions to the operator, indicating the generation of which generators should be adjusted in order to remove the occurred overload, see principle sketch fig. 1, and is able to optionally account for generation displacement cost, too. It was developed in close cooperation of a university and a TSO in Germany and successfully verified on the basis of real bulk power system data
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Practicability of SPS coordination in market environment for impending UCTE-IPS/UPS interconnection Coordinated auction project in Central Europe Congestion management: The system operators challenge to balance transmission transfer capacity with an acceptable security level Congestion management in Japan Financial impacts of congestion relief measures under different congestion management schemes
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1