具有随机交货期和维修行动的两级装配系统的最优供应计划

Z. Guiras, S. Turki, N. Rezg, A. Dolgui
{"title":"具有随机交货期和维修行动的两级装配系统的最优供应计划","authors":"Z. Guiras, S. Turki, N. Rezg, A. Dolgui","doi":"10.1109/IEEM.2016.7797936","DOIUrl":null,"url":null,"abstract":"This paper deals with the supply planning for two level assembly systems under stochastic lead time and random failure machine. The objective is to determine the optimal supply planning of the assembly system while considering the maintenance actions and then to study their impact on the optimal release dates for the components at level 2. The optimal supply planning minimizes the total cost which is the sum of inventory holding cost for components at level 1 and 2, assembly cost, maintenance cost, backlogging and inventory holding cost for the finished product. A mathematical model is proposed to compute the total cost and then to determine the optimal supply planning. Numerical results are presented to discuss the impact of maintenance actions on the optimal release dates.","PeriodicalId":114906,"journal":{"name":"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":"238 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Optimal supply planning for two-levels assembly system with stochastic lead-times and maintenance actions\",\"authors\":\"Z. Guiras, S. Turki, N. Rezg, A. Dolgui\",\"doi\":\"10.1109/IEEM.2016.7797936\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper deals with the supply planning for two level assembly systems under stochastic lead time and random failure machine. The objective is to determine the optimal supply planning of the assembly system while considering the maintenance actions and then to study their impact on the optimal release dates for the components at level 2. The optimal supply planning minimizes the total cost which is the sum of inventory holding cost for components at level 1 and 2, assembly cost, maintenance cost, backlogging and inventory holding cost for the finished product. A mathematical model is proposed to compute the total cost and then to determine the optimal supply planning. Numerical results are presented to discuss the impact of maintenance actions on the optimal release dates.\",\"PeriodicalId\":114906,\"journal\":{\"name\":\"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"volume\":\"238 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM.2016.7797936\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2016.7797936","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

研究了随机提前期和随机故障机条件下两级装配系统的供应规划问题。目标是在考虑维护行动的同时确定装配系统的最佳供应计划,然后研究它们对第2级组件的最佳发布日期的影响。最优供应计划使总成本最小化,总成本是一级和二级部件的库存成本、装配成本、维护成本、积压成本和成品库存成本的总和。提出了一个计算总成本的数学模型,从而确定最优供应计划。通过数值结果讨论了维护行为对最优发布日期的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimal supply planning for two-levels assembly system with stochastic lead-times and maintenance actions
This paper deals with the supply planning for two level assembly systems under stochastic lead time and random failure machine. The objective is to determine the optimal supply planning of the assembly system while considering the maintenance actions and then to study their impact on the optimal release dates for the components at level 2. The optimal supply planning minimizes the total cost which is the sum of inventory holding cost for components at level 1 and 2, assembly cost, maintenance cost, backlogging and inventory holding cost for the finished product. A mathematical model is proposed to compute the total cost and then to determine the optimal supply planning. Numerical results are presented to discuss the impact of maintenance actions on the optimal release dates.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The effect of collaborative communication, power dependency, and price satisfaction on trust and loyalty of individual farmers to dairy cooperative case study dairy supply chain in Boyolali Supply chain collaboration: A triadic view Adoption of Near Field Communication in hotel industry based on risk perspectives and individual characteristics One's fault is another's lesson: What motivates the employees to Participate in the learning activity? Internet of things value for mechanical engineers and evolving commercial product lifecycle management system
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1