{"title":"联合能源与备用电力市场下梯级水电站基于风险的最优自调度","authors":"M. Heidarizadeh, M. Shivaie, M. Ahmadian, M. Ameli","doi":"10.1109/CTPP.2016.7483057","DOIUrl":null,"url":null,"abstract":"In this paper, the authors propose a new method for optimal self-scheduling of cascaded hydro power plants in energy and reserve electricity markets. In the proposed methodology, risk-based self-scheduling is applied with regard to volume of reservoirs impresses on both energy price and probability of presence in spinning reserve electricity market, whiles energy price influences on only probability of presence in spinning reserve market. In order to model optimal self-scheduling of cascaded hydro power plants in the energy and reserve electricity markets, daily operation in hourly interval is taken into account. The proposed method is one of Mixed-Integer, Non-Linear Programming (MINLP) problem with non-convex nature. Since, to solve the proposed MINLP problem, GAMS platform has been utilized. The newly developed method has been applied to a cascaded system with three hydro power plants over a time horizon of 24-hours. The obtained results demonstrate the feasibility and profitableness of the newly developed method in the optimal self-scheduling of cascaded hydro power plants in electricity markets, when compared with other methods.","PeriodicalId":309316,"journal":{"name":"2016 6th Conference on Thermal Power Plants (CTPP)","volume":"227 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"A risk-based optimal self-scheduling of cascaded hydro power plants in joint energy and reserve electricity markets\",\"authors\":\"M. Heidarizadeh, M. Shivaie, M. Ahmadian, M. Ameli\",\"doi\":\"10.1109/CTPP.2016.7483057\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, the authors propose a new method for optimal self-scheduling of cascaded hydro power plants in energy and reserve electricity markets. In the proposed methodology, risk-based self-scheduling is applied with regard to volume of reservoirs impresses on both energy price and probability of presence in spinning reserve electricity market, whiles energy price influences on only probability of presence in spinning reserve market. In order to model optimal self-scheduling of cascaded hydro power plants in the energy and reserve electricity markets, daily operation in hourly interval is taken into account. The proposed method is one of Mixed-Integer, Non-Linear Programming (MINLP) problem with non-convex nature. Since, to solve the proposed MINLP problem, GAMS platform has been utilized. The newly developed method has been applied to a cascaded system with three hydro power plants over a time horizon of 24-hours. The obtained results demonstrate the feasibility and profitableness of the newly developed method in the optimal self-scheduling of cascaded hydro power plants in electricity markets, when compared with other methods.\",\"PeriodicalId\":309316,\"journal\":{\"name\":\"2016 6th Conference on Thermal Power Plants (CTPP)\",\"volume\":\"227 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 6th Conference on Thermal Power Plants (CTPP)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CTPP.2016.7483057\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 6th Conference on Thermal Power Plants (CTPP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CTPP.2016.7483057","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

本文提出了一种在能源和备用电力市场下梯级水电站最优自调度的新方法。该方法采用基于风险的水库容量自调度方法,对旋转备用电力市场的能源价格和存在概率都有影响,而能源价格仅对旋转备用电力市场的存在概率有影响。为了在能源和备用电力市场上建立级联水电站的最优自调度模型,考虑了每小时区间的日运行情况。该方法是一类具有非凸性质的混合整数非线性规划问题。因此,为了解决所提出的MINLP问题,采用了GAMS平台。新开发的方法已在24小时的时间范围内应用于三个水力发电厂的级联系统。研究结果表明,与其他方法相比,该方法在电力市场条件下梯级水电站最优自调度问题上具有可行性和可操作性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A risk-based optimal self-scheduling of cascaded hydro power plants in joint energy and reserve electricity markets
In this paper, the authors propose a new method for optimal self-scheduling of cascaded hydro power plants in energy and reserve electricity markets. In the proposed methodology, risk-based self-scheduling is applied with regard to volume of reservoirs impresses on both energy price and probability of presence in spinning reserve electricity market, whiles energy price influences on only probability of presence in spinning reserve market. In order to model optimal self-scheduling of cascaded hydro power plants in the energy and reserve electricity markets, daily operation in hourly interval is taken into account. The proposed method is one of Mixed-Integer, Non-Linear Programming (MINLP) problem with non-convex nature. Since, to solve the proposed MINLP problem, GAMS platform has been utilized. The newly developed method has been applied to a cascaded system with three hydro power plants over a time horizon of 24-hours. The obtained results demonstrate the feasibility and profitableness of the newly developed method in the optimal self-scheduling of cascaded hydro power plants in electricity markets, when compared with other methods.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
AGC of interconnected multi-source power system with considering GDB and GRC nonlinearity effects Fault diagnosis of an industrial once-through benson boiler by utilizing adaptive neuro-fuzzy inference system A novel approach to improve automatic generation control of a two-area power system considering frequency bias factor A risk-based optimal self-scheduling of cascaded hydro power plants in joint energy and reserve electricity markets Optimal power flow problem considering the cost, loss, and emission by multi-objective electromagnetism-like algorithm
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1