{"title":"由电容器组步长开关引起的配电网暂态过电压","authors":"A. Amer","doi":"10.1109/ICEEC.2004.1374620","DOIUrl":null,"url":null,"abstract":"The application of controlled reactive power compensators in electric distribution networks, whether for power factor improvement, losses reduction, voltage control or released capacity has been accepted as a necessary step in the design of distribution systems. The operation of such equipment necessitate the switching on and off of steps of capacitor banks. Such switching procedure are normally accompanied by transient over current and transient over voltages This paper presents the results of studies of transient over voltages in electric distribution networks due to the installation of switched capacitor banks on the secondary side of primary substations. Transient over voltages due to the switching off steps of the capacitor banks are obtained for both the primary and the secondary sides of the primary substations. The results obtained give an explanation for the problem of terminations failure on the high voltage side of the primary substation. The study is very helpful for manufacturers, operators and planners, for the suitable choice of equipment type, size and steps of capacitor banks.","PeriodicalId":180043,"journal":{"name":"International Conference on Electrical, Electronic and Computer Engineering, 2004. ICEEC '04.","volume":"59 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-09-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Transient over voltages in electric distribution networks due to switching of capacitor banks steps\",\"authors\":\"A. Amer\",\"doi\":\"10.1109/ICEEC.2004.1374620\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The application of controlled reactive power compensators in electric distribution networks, whether for power factor improvement, losses reduction, voltage control or released capacity has been accepted as a necessary step in the design of distribution systems. The operation of such equipment necessitate the switching on and off of steps of capacitor banks. Such switching procedure are normally accompanied by transient over current and transient over voltages This paper presents the results of studies of transient over voltages in electric distribution networks due to the installation of switched capacitor banks on the secondary side of primary substations. Transient over voltages due to the switching off steps of the capacitor banks are obtained for both the primary and the secondary sides of the primary substations. The results obtained give an explanation for the problem of terminations failure on the high voltage side of the primary substation. The study is very helpful for manufacturers, operators and planners, for the suitable choice of equipment type, size and steps of capacitor banks.\",\"PeriodicalId\":180043,\"journal\":{\"name\":\"International Conference on Electrical, Electronic and Computer Engineering, 2004. ICEEC '04.\",\"volume\":\"59 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-09-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Conference on Electrical, Electronic and Computer Engineering, 2004. ICEEC '04.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICEEC.2004.1374620\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Conference on Electrical, Electronic and Computer Engineering, 2004. ICEEC '04.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEEC.2004.1374620","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

控制无功补偿器在配电网中的应用,无论是为了改善功率因数、降低损耗、控制电压还是释放容量,都已被公认为配电网设计的必要步骤。这种设备的运行需要电容器组的开关步骤。这种开关过程通常伴随着暂态过电流和暂态过电压。本文介绍了由于在一次变电站二次侧安装开关电容器组而引起的配电网暂态过电压的研究结果。在一次变电站的一次侧和二次侧,由于电容器组的关断步骤而获得的瞬态过电压。所得结果对一次变电站高压侧终端失效问题作出了解释。研究结果对电容器组的制造商、运营商和规划者合理选择电容器组的设备类型、尺寸和步骤具有重要的指导意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Transient over voltages in electric distribution networks due to switching of capacitor banks steps
The application of controlled reactive power compensators in electric distribution networks, whether for power factor improvement, losses reduction, voltage control or released capacity has been accepted as a necessary step in the design of distribution systems. The operation of such equipment necessitate the switching on and off of steps of capacitor banks. Such switching procedure are normally accompanied by transient over current and transient over voltages This paper presents the results of studies of transient over voltages in electric distribution networks due to the installation of switched capacitor banks on the secondary side of primary substations. Transient over voltages due to the switching off steps of the capacitor banks are obtained for both the primary and the secondary sides of the primary substations. The results obtained give an explanation for the problem of terminations failure on the high voltage side of the primary substation. The study is very helpful for manufacturers, operators and planners, for the suitable choice of equipment type, size and steps of capacitor banks.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Study of superconducting microstrip line using transverse resonance technique Sensitivity of radial-basis networks to single-example decision classes Comparison of branch prediction schemes for superscalar processors ICEEC 2004 Integrator frequency synthesizer Fuzzy logic control of the mean arterial pressure of ICu patients
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1