基于潮流监测的加权最小二乘状态估计

Andi Nur Putri, O. Penangsang, Mochammad Apriyadi Hadi Sirad
{"title":"基于潮流监测的加权最小二乘状态估计","authors":"Andi Nur Putri, O. Penangsang, Mochammad Apriyadi Hadi Sirad","doi":"10.1109/iSemantic50169.2020.9234235","DOIUrl":null,"url":null,"abstract":"his current study aims to analyzing the results of measurements of Remote Terminal Unit and detect bad measurement on the bus by using State Estimation. The research was conducted at Load Control Unit of PT. PLN SULSELRABAR (South, Southeast, and West Sulawesi, hereafter SULSELRABAR). The data used in the analysis were data of channel impedance, and the results of RTU measurements, including data about bus, voltage, MVAR injection, and load data in the electric system of SULSELRABAR. The results reveal that from 37 buses in the system, 22 buses can be monitored via the RTU, and 30 buses can be estimated by using the estimation method with Weighted Least Square (WLS). Based on the results of state estimation, bad measurements occurred on the bus of 27 and of 29, with error levels of 0.0575 and 0.0871 respectively.","PeriodicalId":345558,"journal":{"name":"2020 International Seminar on Application for Technology of Information and Communication (iSemantic)","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Power Flow Based Monitoring Of State Estimation Using The Weighted Least Square\",\"authors\":\"Andi Nur Putri, O. Penangsang, Mochammad Apriyadi Hadi Sirad\",\"doi\":\"10.1109/iSemantic50169.2020.9234235\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"his current study aims to analyzing the results of measurements of Remote Terminal Unit and detect bad measurement on the bus by using State Estimation. The research was conducted at Load Control Unit of PT. PLN SULSELRABAR (South, Southeast, and West Sulawesi, hereafter SULSELRABAR). The data used in the analysis were data of channel impedance, and the results of RTU measurements, including data about bus, voltage, MVAR injection, and load data in the electric system of SULSELRABAR. The results reveal that from 37 buses in the system, 22 buses can be monitored via the RTU, and 30 buses can be estimated by using the estimation method with Weighted Least Square (WLS). Based on the results of state estimation, bad measurements occurred on the bus of 27 and of 29, with error levels of 0.0575 and 0.0871 respectively.\",\"PeriodicalId\":345558,\"journal\":{\"name\":\"2020 International Seminar on Application for Technology of Information and Communication (iSemantic)\",\"volume\":\"20 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 International Seminar on Application for Technology of Information and Communication (iSemantic)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/iSemantic50169.2020.9234235\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Seminar on Application for Technology of Information and Communication (iSemantic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/iSemantic50169.2020.9234235","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

他目前的研究旨在分析远程终端单元的测量结果,并利用状态估计方法检测总线上的不良测量。该研究是在SULSELRABAR(南、东南和西苏拉威西,以下简称SULSELRABAR) PT. PLN的负荷控制单元进行的。分析中使用的数据是通道阻抗数据和RTU测量结果,包括SULSELRABAR电气系统中母线、电压、MVAR注入和负载数据。结果表明,在系统的37辆公交车中,有22辆可以通过RTU进行监控,30辆可以通过加权最小二乘估计方法进行估计。根据状态估计的结果,在27和29总线上出现了不良测量,误差水平分别为0.0575和0.0871。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Power Flow Based Monitoring Of State Estimation Using The Weighted Least Square
his current study aims to analyzing the results of measurements of Remote Terminal Unit and detect bad measurement on the bus by using State Estimation. The research was conducted at Load Control Unit of PT. PLN SULSELRABAR (South, Southeast, and West Sulawesi, hereafter SULSELRABAR). The data used in the analysis were data of channel impedance, and the results of RTU measurements, including data about bus, voltage, MVAR injection, and load data in the electric system of SULSELRABAR. The results reveal that from 37 buses in the system, 22 buses can be monitored via the RTU, and 30 buses can be estimated by using the estimation method with Weighted Least Square (WLS). Based on the results of state estimation, bad measurements occurred on the bus of 27 and of 29, with error levels of 0.0575 and 0.0871 respectively.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Independent Public Video Conference Network Sentiment Analysis of Yelp Review Extrovert and Introvert Classification based on Myers-Briggs Type Indicator(MBTI) using Support Vector Machine (SVM) Brain Segmentation using Adaptive Thresholding, K-Means Clustering and Mathematical Morphology in MRI Data Handwriting Recognition of Hiragana Characters using Convolutional Neural Network
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1