{"title":"现代数据中心中电压互感器故障的案例研究:分析、缓解和解决方案实现","authors":"Tamer Abdelazim Mellik, T. Dionise, R. Yanniello","doi":"10.1109/ICPS.2016.7490257","DOIUrl":null,"url":null,"abstract":"While preparing a modern data center for startup, the commissioning process involved primary circuit switching that resulted in two voltage transformer (VT) failures. As a result of these failures, the authors conducted a comprehensive investigation of the VT failures. As the investigation proceeded, VT ferroresonance on circuit opening, and high frequency switching transients on closing, emerged as possible root causes of the VT failures. After incorporating extensive transient simulations and three rounds of field transient measurements, the authors designed and implemented a complete solution that included sizing of snubbers to overcome excessive switching transients, and the development of a saturable reactor to protect voltage transformers against the effects of ferroresonance. This paper describes root cause(s), simulations, field measurements, recommend solution(s), and solution implementation. The correlation between field measurements and simulation results show the effectiveness of modeling the implemented solutions.","PeriodicalId":266558,"journal":{"name":"2016 IEEE/IAS 52nd Industrial and Commercial Power Systems Technical Conference (I&CPS)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2016-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"A case study of voltage transformer failures in a modern data center: Analysis, mitigation, and solution implementation\",\"authors\":\"Tamer Abdelazim Mellik, T. Dionise, R. Yanniello\",\"doi\":\"10.1109/ICPS.2016.7490257\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"While preparing a modern data center for startup, the commissioning process involved primary circuit switching that resulted in two voltage transformer (VT) failures. As a result of these failures, the authors conducted a comprehensive investigation of the VT failures. As the investigation proceeded, VT ferroresonance on circuit opening, and high frequency switching transients on closing, emerged as possible root causes of the VT failures. After incorporating extensive transient simulations and three rounds of field transient measurements, the authors designed and implemented a complete solution that included sizing of snubbers to overcome excessive switching transients, and the development of a saturable reactor to protect voltage transformers against the effects of ferroresonance. This paper describes root cause(s), simulations, field measurements, recommend solution(s), and solution implementation. The correlation between field measurements and simulation results show the effectiveness of modeling the implemented solutions.\",\"PeriodicalId\":266558,\"journal\":{\"name\":\"2016 IEEE/IAS 52nd Industrial and Commercial Power Systems Technical Conference (I&CPS)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE/IAS 52nd Industrial and Commercial Power Systems Technical Conference (I&CPS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPS.2016.7490257\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE/IAS 52nd Industrial and Commercial Power Systems Technical Conference (I&CPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPS.2016.7490257","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A case study of voltage transformer failures in a modern data center: Analysis, mitigation, and solution implementation
While preparing a modern data center for startup, the commissioning process involved primary circuit switching that resulted in two voltage transformer (VT) failures. As a result of these failures, the authors conducted a comprehensive investigation of the VT failures. As the investigation proceeded, VT ferroresonance on circuit opening, and high frequency switching transients on closing, emerged as possible root causes of the VT failures. After incorporating extensive transient simulations and three rounds of field transient measurements, the authors designed and implemented a complete solution that included sizing of snubbers to overcome excessive switching transients, and the development of a saturable reactor to protect voltage transformers against the effects of ferroresonance. This paper describes root cause(s), simulations, field measurements, recommend solution(s), and solution implementation. The correlation between field measurements and simulation results show the effectiveness of modeling the implemented solutions.