{"title":"O-MBK部分接地的压下集电极","authors":"Yong Jiang, S. Shchelkunov, V. Teryaev, J. Hirshfield","doi":"10.1109/AAC.2018.8659418","DOIUrl":null,"url":null,"abstract":"New results are presented for the development of a 3 MW highly-efficient radio-frequency (RF) source at 1.3 GHz. The project's ultimate goal is to equip the existing tube with a partially grounded depressed collector in order to boost its efficiency to at least 73 %. The tests of this device in its original configuration are not yet completed. A limited 2-week campaign at Communication & Power Industries, LLC yielded 3MW at nearly 60% of efficiency in narrow 15 microsecond pulses. The next stage is to test the device and optimize it to achieve 62-63% in efficiency in the full pulse at 1.5 milliseconds. The preparations are almost complete to do these tests at SLAC National Accelerator Laboratory, End Station B. The results will be presented.","PeriodicalId":339772,"journal":{"name":"2018 IEEE Advanced Accelerator Concepts Workshop (AAC)","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"O-MBK with Partially Grounded Depressed Collector\",\"authors\":\"Yong Jiang, S. Shchelkunov, V. Teryaev, J. Hirshfield\",\"doi\":\"10.1109/AAC.2018.8659418\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"New results are presented for the development of a 3 MW highly-efficient radio-frequency (RF) source at 1.3 GHz. The project's ultimate goal is to equip the existing tube with a partially grounded depressed collector in order to boost its efficiency to at least 73 %. The tests of this device in its original configuration are not yet completed. A limited 2-week campaign at Communication & Power Industries, LLC yielded 3MW at nearly 60% of efficiency in narrow 15 microsecond pulses. The next stage is to test the device and optimize it to achieve 62-63% in efficiency in the full pulse at 1.5 milliseconds. The preparations are almost complete to do these tests at SLAC National Accelerator Laboratory, End Station B. The results will be presented.\",\"PeriodicalId\":339772,\"journal\":{\"name\":\"2018 IEEE Advanced Accelerator Concepts Workshop (AAC)\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE Advanced Accelerator Concepts Workshop (AAC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AAC.2018.8659418\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE Advanced Accelerator Concepts Workshop (AAC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AAC.2018.8659418","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

介绍了一种1.3 GHz 3mw高效射频源的研制新结果。该项目的最终目标是为现有的管道配备一个部分接地的压抑集热器,以将其效率提高到至少73%。此设备在其原始配置下的测试尚未完成。在通信与电力工业有限责任公司进行的为期两周的有限活动中,在15微秒的窄脉冲中产生了3MW,效率接近60%。下一阶段是测试该设备并对其进行优化,使其在1.5毫秒的全脉冲中达到62-63%的效率。在SLAC国家加速器实验室b端站进行这些测试的准备工作几乎已经完成,结果将被公布。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
O-MBK with Partially Grounded Depressed Collector
New results are presented for the development of a 3 MW highly-efficient radio-frequency (RF) source at 1.3 GHz. The project's ultimate goal is to equip the existing tube with a partially grounded depressed collector in order to boost its efficiency to at least 73 %. The tests of this device in its original configuration are not yet completed. A limited 2-week campaign at Communication & Power Industries, LLC yielded 3MW at nearly 60% of efficiency in narrow 15 microsecond pulses. The next stage is to test the device and optimize it to achieve 62-63% in efficiency in the full pulse at 1.5 milliseconds. The preparations are almost complete to do these tests at SLAC National Accelerator Laboratory, End Station B. The results will be presented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Simple Variable Focus Lens for Field-Emitter Cathodes Multi-Stream Instability in UMER Investigating Instabilities of Long, Intense Laser Pulses in Plasma Wakefield Accelerators Head and Tail Compression of an Electron Beam High-Dielectric 3-D Printable Materials for Laser Accelerators
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1