M. Stamati, N. Patronis, M. Bacak, S. Amaducci, Adrià Casanovas Hoste, Francisco Garcia Infantes, A. Manna, A. Mengoni, Jose Antonio Pavon Rodriguez, Antonio Javier Praena Rodriguez, M. Spelta
{"title":"准备n_TOF/CERN设施的第4阶段","authors":"M. Stamati, N. Patronis, M. Bacak, S. Amaducci, Adrià Casanovas Hoste, Francisco Garcia Infantes, A. Manna, A. Mengoni, Jose Antonio Pavon Rodriguez, Antonio Javier Praena Rodriguez, M. Spelta","doi":"10.12681/hnps.3610","DOIUrl":null,"url":null,"abstract":"After CERN’s Long Shutdown 2, the n_TOF facility infrastructure was largely upgraded. The biggest change is the installation of a new lead spallation target, the performance of which needs to be carefully examined. During Summer 2021, the facility’s two flight paths were characterised in terms of neutron beam energy distribution, profile and resolution. In this work, the characterisation of the facility is described and the first results are given.","PeriodicalId":262803,"journal":{"name":"HNPS Advances in Nuclear Physics","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Preparing Phase 4 of the n_TOF/CERN facility\",\"authors\":\"M. Stamati, N. Patronis, M. Bacak, S. Amaducci, Adrià Casanovas Hoste, Francisco Garcia Infantes, A. Manna, A. Mengoni, Jose Antonio Pavon Rodriguez, Antonio Javier Praena Rodriguez, M. Spelta\",\"doi\":\"10.12681/hnps.3610\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"After CERN’s Long Shutdown 2, the n_TOF facility infrastructure was largely upgraded. The biggest change is the installation of a new lead spallation target, the performance of which needs to be carefully examined. During Summer 2021, the facility’s two flight paths were characterised in terms of neutron beam energy distribution, profile and resolution. In this work, the characterisation of the facility is described and the first results are given.\",\"PeriodicalId\":262803,\"journal\":{\"name\":\"HNPS Advances in Nuclear Physics\",\"volume\":\"19 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"HNPS Advances in Nuclear Physics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12681/hnps.3610\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"HNPS Advances in Nuclear Physics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12681/hnps.3610","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
After CERN’s Long Shutdown 2, the n_TOF facility infrastructure was largely upgraded. The biggest change is the installation of a new lead spallation target, the performance of which needs to be carefully examined. During Summer 2021, the facility’s two flight paths were characterised in terms of neutron beam energy distribution, profile and resolution. In this work, the characterisation of the facility is described and the first results are given.