考虑时变加权因素的孤立式热电联产系统优化运行

Kejing Duan, Wei Wang, Wu Wei, Zhenya Ji
{"title":"考虑时变加权因素的孤立式热电联产系统优化运行","authors":"Kejing Duan, Wei Wang, Wu Wei, Zhenya Ji","doi":"10.1109/ICPSAsia52756.2021.9621385","DOIUrl":null,"url":null,"abstract":"Nowadays, comprehensive utilization of multiple forms of energy to improve energy efficiency is popularly concerned. To this end, an isolated combined cooling, heating and power (CCHP) system is deeply explored in this paper. Aiming for further optimization of the system according to characteristics of island operation mode, two integrated energy system (IES) evaluation indexes are taken as the objective function. Furthermore, a time-varying weight factor is proposed to calculate multi-objective function and optimize the system scheduling. Case study results demonstrate that the potential benefits of the proposed optimization strategy in terms of operation economics, energy utilization, as well as the load balancing of isolated system.","PeriodicalId":296085,"journal":{"name":"2021 IEEE/IAS Industrial and Commercial Power System Asia (I&CPS Asia)","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Optimal Operation of Isolated CCHP System Considering Time-Varying Weighting Factors\",\"authors\":\"Kejing Duan, Wei Wang, Wu Wei, Zhenya Ji\",\"doi\":\"10.1109/ICPSAsia52756.2021.9621385\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Nowadays, comprehensive utilization of multiple forms of energy to improve energy efficiency is popularly concerned. To this end, an isolated combined cooling, heating and power (CCHP) system is deeply explored in this paper. Aiming for further optimization of the system according to characteristics of island operation mode, two integrated energy system (IES) evaluation indexes are taken as the objective function. Furthermore, a time-varying weight factor is proposed to calculate multi-objective function and optimize the system scheduling. Case study results demonstrate that the potential benefits of the proposed optimization strategy in terms of operation economics, energy utilization, as well as the load balancing of isolated system.\",\"PeriodicalId\":296085,\"journal\":{\"name\":\"2021 IEEE/IAS Industrial and Commercial Power System Asia (I&CPS Asia)\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 IEEE/IAS Industrial and Commercial Power System Asia (I&CPS Asia)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPSAsia52756.2021.9621385\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE/IAS Industrial and Commercial Power System Asia (I&CPS Asia)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPSAsia52756.2021.9621385","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

目前,综合利用多种形式的能源,提高能源效率受到普遍关注。为此,本文对隔离式冷热电联产系统进行了深入的研究。针对海岛运行模式的特点,以两个综合能源系统评价指标作为目标函数,对系统进行进一步优化。在此基础上,提出了一种时变权重因子来计算多目标函数并优化系统调度。实例分析结果表明,所提出的优化策略在运行经济性、能源利用率和隔离系统负载均衡方面具有潜在的效益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimal Operation of Isolated CCHP System Considering Time-Varying Weighting Factors
Nowadays, comprehensive utilization of multiple forms of energy to improve energy efficiency is popularly concerned. To this end, an isolated combined cooling, heating and power (CCHP) system is deeply explored in this paper. Aiming for further optimization of the system according to characteristics of island operation mode, two integrated energy system (IES) evaluation indexes are taken as the objective function. Furthermore, a time-varying weight factor is proposed to calculate multi-objective function and optimize the system scheduling. Case study results demonstrate that the potential benefits of the proposed optimization strategy in terms of operation economics, energy utilization, as well as the load balancing of isolated system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Simulation of No-load Medium Recovery Characteristics of CO2 Circuit Breaker The Energy Management Strategies of Residential Integrated Energy System Considering Integrated Demand Response Optimal Operation of Integrated Electricity-Gas Systems for Renewable Energy Accommodation Considering Flexible Resources Optimal Offering and Operating Strategy of CSP Plants under Different Support Mechanisms Power Loss Mitigation of Parallel-Connected Distributed Energy Resources in DC Microgrids Using a Dual-Ascent Hierarchical Control
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1