{"title":"卡普吉纳水泵水电站运行补偿制度对波黑电力系统电压状况的影响","authors":"Senad Hadžić, Husnija Ferizović, Obrad Skrba, A. Muharemovic, Bojan Rebić","doi":"10.2478/bhee-2021-0022","DOIUrl":null,"url":null,"abstract":"Abstract The paper presents the results of testing the operational capabilities of the pump hydropower plant (PHPP) Capljina in compensatory, under excited mode in real time, and answers the questions how, and to what extent, the operation of PHPP Capljina in the under excited mode affects the improvement of voltage conditions in the power system of B&H. The test was performed with one machine in compensatory under excited mode with the takeover of reactive power in the amount of 160 MVAr, in a period of 4 hours. During the test, thermal power plant (TPP) Gacko operated in the maximum under excited mode for a certain period of time.","PeriodicalId":236883,"journal":{"name":"B&H Electrical Engineering","volume":"123 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Influence of Compensatory Regime of Operation of Pump Hydropower Plant Capljina on Voltage Conditions in Electric Power System of Bosnia and Herzegovina\",\"authors\":\"Senad Hadžić, Husnija Ferizović, Obrad Skrba, A. Muharemovic, Bojan Rebić\",\"doi\":\"10.2478/bhee-2021-0022\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The paper presents the results of testing the operational capabilities of the pump hydropower plant (PHPP) Capljina in compensatory, under excited mode in real time, and answers the questions how, and to what extent, the operation of PHPP Capljina in the under excited mode affects the improvement of voltage conditions in the power system of B&H. The test was performed with one machine in compensatory under excited mode with the takeover of reactive power in the amount of 160 MVAr, in a period of 4 hours. During the test, thermal power plant (TPP) Gacko operated in the maximum under excited mode for a certain period of time.\",\"PeriodicalId\":236883,\"journal\":{\"name\":\"B&H Electrical Engineering\",\"volume\":\"123 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"B&H Electrical Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/bhee-2021-0022\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"B&H Electrical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/bhee-2021-0022","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The Influence of Compensatory Regime of Operation of Pump Hydropower Plant Capljina on Voltage Conditions in Electric Power System of Bosnia and Herzegovina
Abstract The paper presents the results of testing the operational capabilities of the pump hydropower plant (PHPP) Capljina in compensatory, under excited mode in real time, and answers the questions how, and to what extent, the operation of PHPP Capljina in the under excited mode affects the improvement of voltage conditions in the power system of B&H. The test was performed with one machine in compensatory under excited mode with the takeover of reactive power in the amount of 160 MVAr, in a period of 4 hours. During the test, thermal power plant (TPP) Gacko operated in the maximum under excited mode for a certain period of time.