K. Biery, K. Ragan, R. Grindley, A. Holscher, P. Sinervo, R. Harris, K. Schurecht, T. Shaw
{"title":"CDF数据采集系统在1992年运行中的表现","authors":"K. Biery, K. Ragan, R. Grindley, A. Holscher, P. Sinervo, R. Harris, K. Schurecht, T. Shaw","doi":"10.1109/NSSMIC.1992.301319","DOIUrl":null,"url":null,"abstract":"The CDF data acquisition system was upgraded for the 1992 run, with modifications to the front-end electronics and the addition of a second FASTBUS-based event builder. The goal is a 35-Hz output rate to the Level 3 trigger processor farm. The initial performance of the system up to the Level 3 input is reviewed and compared to that of a Verilog simulation. The system runs reliably and its performance is in good agreement with the predictions of the behavioral simulation.<<ETX>>","PeriodicalId":447239,"journal":{"name":"IEEE Conference on Nuclear Science Symposium and Medical Imaging","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Performance of the CDF DAQ system in the 1992 run\",\"authors\":\"K. Biery, K. Ragan, R. Grindley, A. Holscher, P. Sinervo, R. Harris, K. Schurecht, T. Shaw\",\"doi\":\"10.1109/NSSMIC.1992.301319\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The CDF data acquisition system was upgraded for the 1992 run, with modifications to the front-end electronics and the addition of a second FASTBUS-based event builder. The goal is a 35-Hz output rate to the Level 3 trigger processor farm. The initial performance of the system up to the Level 3 input is reviewed and compared to that of a Verilog simulation. The system runs reliably and its performance is in good agreement with the predictions of the behavioral simulation.<<ETX>>\",\"PeriodicalId\":447239,\"journal\":{\"name\":\"IEEE Conference on Nuclear Science Symposium and Medical Imaging\",\"volume\":\"35 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1992-10-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Conference on Nuclear Science Symposium and Medical Imaging\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/NSSMIC.1992.301319\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Conference on Nuclear Science Symposium and Medical Imaging","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NSSMIC.1992.301319","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The CDF data acquisition system was upgraded for the 1992 run, with modifications to the front-end electronics and the addition of a second FASTBUS-based event builder. The goal is a 35-Hz output rate to the Level 3 trigger processor farm. The initial performance of the system up to the Level 3 input is reviewed and compared to that of a Verilog simulation. The system runs reliably and its performance is in good agreement with the predictions of the behavioral simulation.<>