{"title":"避免停电的电厂保护与控制策略","authors":"C. Mozina","doi":"10.1109/PSAMP.2006.285389","DOIUrl":null,"url":null,"abstract":"Recent misoperations of generation protection during major system disturbances have highlighted the need for better coordination of generator protection with generator capability, generator automatic voltage regulator (AVR) control and transmission system protection. This paper discusses in detail the important role that the generator AVR plays during major system disturbances. This paper provides practical guidance on proper coordination of generator protection and generator control to enhance security and system stability","PeriodicalId":125883,"journal":{"name":"59th Annual Conference for Protective Relay Engineers, 2006.","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"19","resultStr":"{\"title\":\"Power plant protection and control strategies for blackout avoidance\",\"authors\":\"C. Mozina\",\"doi\":\"10.1109/PSAMP.2006.285389\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Recent misoperations of generation protection during major system disturbances have highlighted the need for better coordination of generator protection with generator capability, generator automatic voltage regulator (AVR) control and transmission system protection. This paper discusses in detail the important role that the generator AVR plays during major system disturbances. This paper provides practical guidance on proper coordination of generator protection and generator control to enhance security and system stability\",\"PeriodicalId\":125883,\"journal\":{\"name\":\"59th Annual Conference for Protective Relay Engineers, 2006.\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-03-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"19\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"59th Annual Conference for Protective Relay Engineers, 2006.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PSAMP.2006.285389\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"59th Annual Conference for Protective Relay Engineers, 2006.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PSAMP.2006.285389","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 19

摘要

近年来在重大系统扰动中发生的发电机保护误操作突出表明,需要更好地协调发电机保护与发电机能力、发电机自动电压调节器(AVR)控制和输电系统保护。本文详细讨论了发电机AVR在系统重大扰动中所起的重要作用。本文对发电机保护和发电机控制的合理协调提供了实践指导,以提高系统的安全性和稳定性
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Power plant protection and control strategies for blackout avoidance
Recent misoperations of generation protection during major system disturbances have highlighted the need for better coordination of generator protection with generator capability, generator automatic voltage regulator (AVR) control and transmission system protection. This paper discusses in detail the important role that the generator AVR plays during major system disturbances. This paper provides practical guidance on proper coordination of generator protection and generator control to enhance security and system stability
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Application of islanding protection for industrial and commercial generators-an IEEE industrial application society working group report Addressing window type transformer proximity errors Perfecting performance of distance protective relays and it's associated pilot protection schemes in extra high voltage (EHV) transmission line applications Selection of current transformers and wire sizing in substations Directional overcurrent relaying (67) concepts
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1