海上交流集线器内多个VSC-HVDC转换器的控制

J. Stevens, Daniel J. Rogers
{"title":"海上交流集线器内多个VSC-HVDC转换器的控制","authors":"J. Stevens, Daniel J. Rogers","doi":"10.1109/ENERGYTECH.2013.6645303","DOIUrl":null,"url":null,"abstract":"The offshore node will be a key component of a future European Supergrid. The offshore AC hub (or SuperNode) is presented as one possible topology of an offshore node. Tranche A is an area within Dogger Bank, which is one of the UK's largest offshore wind development zones. It is a likely location of an offshore AC hub and therefore is used as a case study. Two strategies are presented for control of voltage, current and power within the offshore AC hub. The performance of each control strategy is compared under both planned and unplanned changes in operating conditions. Simulations are carried out using the SimPower toolbox of MATLAB Simulink. It is found that both control strategies are able to maintain satisfactory control of voltage, current and power. The communication requirements of each strategy are also briefly discussed.","PeriodicalId":154402,"journal":{"name":"2013 IEEE Energytech","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Control of multiple VSC-HVDC converters within an offshore AC-hub\",\"authors\":\"J. Stevens, Daniel J. Rogers\",\"doi\":\"10.1109/ENERGYTECH.2013.6645303\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The offshore node will be a key component of a future European Supergrid. The offshore AC hub (or SuperNode) is presented as one possible topology of an offshore node. Tranche A is an area within Dogger Bank, which is one of the UK's largest offshore wind development zones. It is a likely location of an offshore AC hub and therefore is used as a case study. Two strategies are presented for control of voltage, current and power within the offshore AC hub. The performance of each control strategy is compared under both planned and unplanned changes in operating conditions. Simulations are carried out using the SimPower toolbox of MATLAB Simulink. It is found that both control strategies are able to maintain satisfactory control of voltage, current and power. The communication requirements of each strategy are also briefly discussed.\",\"PeriodicalId\":154402,\"journal\":{\"name\":\"2013 IEEE Energytech\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 IEEE Energytech\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ENERGYTECH.2013.6645303\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE Energytech","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ENERGYTECH.2013.6645303","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

海上节点将成为未来欧洲超级电网的关键组成部分。离岸交流集线器(或超级节点)被表示为离岸节点的一种可能拓扑。Tranche A是Dogger Bank内的一个区域,Dogger Bank是英国最大的海上风电开发区之一。它可能是海上交流集线器的位置,因此被用作案例研究。提出了海上交流集线器电压、电流和功率控制的两种策略。比较了各控制策略在计划工况和计划外工况变化下的性能。利用MATLAB Simulink中的SimPower工具箱进行仿真。结果表明,两种控制策略均能保持对电压、电流和功率的满意控制。并简要讨论了每种策略的通信要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Control of multiple VSC-HVDC converters within an offshore AC-hub
The offshore node will be a key component of a future European Supergrid. The offshore AC hub (or SuperNode) is presented as one possible topology of an offshore node. Tranche A is an area within Dogger Bank, which is one of the UK's largest offshore wind development zones. It is a likely location of an offshore AC hub and therefore is used as a case study. Two strategies are presented for control of voltage, current and power within the offshore AC hub. The performance of each control strategy is compared under both planned and unplanned changes in operating conditions. Simulations are carried out using the SimPower toolbox of MATLAB Simulink. It is found that both control strategies are able to maintain satisfactory control of voltage, current and power. The communication requirements of each strategy are also briefly discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Energy exchange model of PV-based battery switch stations based on battery swap service and power distribution Flux weakening control for surface mount permanent magnet synchronous motor (PMSM) drives with rapid load and speed varying applications Toward an Energy-Proportional Building prospect: Evaluation and analysis of the energy consumption in a green building testbed Commercialization of high 600V GaN-on-silicon power HEMTs and diodes On time desynchronization attack against IEEE 1588 protocol in power grid systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1