{"title":"基于双边电力市场的两种拥堵管理方式的比较","authors":"V. Farahani, A. Kazemi","doi":"10.1109/IEEEGCC.2006.5686233","DOIUrl":null,"url":null,"abstract":"The restructuring of the electric power industry has involved paradigm shifts in the real time control activities of the power grids. Managing dispatch is one of the important control activities in a power system. With the trend of an increasing number of bilateral contracts being signed for electricity market trades, the possibility of insufficient resources leading to network congestion may be unavoidable. In this scenario, congestion management becomes an important issue. Real-time transmission congestion can be defined as the operating condition in which there is not enough transmission capability to implement all the traded transactions. It may be alleviated by incorporating line capacity constraints in the dispatch and scheduling process. This may involve redispatch of generation or load curtailment. Other possible means for relieving congestion are operation of FACTS devices (TCSC), these two ways are compared in this paper.","PeriodicalId":433452,"journal":{"name":"2006 IEEE GCC Conference (GCC)","volume":"388 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-03-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Comparing two ways of congestion management in bilateral based power market\",\"authors\":\"V. Farahani, A. Kazemi\",\"doi\":\"10.1109/IEEEGCC.2006.5686233\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The restructuring of the electric power industry has involved paradigm shifts in the real time control activities of the power grids. Managing dispatch is one of the important control activities in a power system. With the trend of an increasing number of bilateral contracts being signed for electricity market trades, the possibility of insufficient resources leading to network congestion may be unavoidable. In this scenario, congestion management becomes an important issue. Real-time transmission congestion can be defined as the operating condition in which there is not enough transmission capability to implement all the traded transactions. It may be alleviated by incorporating line capacity constraints in the dispatch and scheduling process. This may involve redispatch of generation or load curtailment. Other possible means for relieving congestion are operation of FACTS devices (TCSC), these two ways are compared in this paper.\",\"PeriodicalId\":433452,\"journal\":{\"name\":\"2006 IEEE GCC Conference (GCC)\",\"volume\":\"388 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-03-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 IEEE GCC Conference (GCC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEEGCC.2006.5686233\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE GCC Conference (GCC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEEGCC.2006.5686233","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

电力工业的重组涉及到电网实时控制活动的范式转变。调度管理是电力系统重要的控制活动之一。随着电力市场交易的双边合同越来越多的趋势,资源不足导致网络拥堵的可能性是不可避免的。在这种情况下,拥塞管理成为一个重要问题。实时传输拥塞可以定义为没有足够的传输能力来实现所有交易的运行状态。可以通过在调度和调度过程中纳入线路容量限制来缓解这一问题。这可能涉及重新分配发电或削减负荷。另一种可能的缓解拥塞的方法是运行FACTS设备(TCSC),本文对这两种方法进行了比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Comparing two ways of congestion management in bilateral based power market
The restructuring of the electric power industry has involved paradigm shifts in the real time control activities of the power grids. Managing dispatch is one of the important control activities in a power system. With the trend of an increasing number of bilateral contracts being signed for electricity market trades, the possibility of insufficient resources leading to network congestion may be unavoidable. In this scenario, congestion management becomes an important issue. Real-time transmission congestion can be defined as the operating condition in which there is not enough transmission capability to implement all the traded transactions. It may be alleviated by incorporating line capacity constraints in the dispatch and scheduling process. This may involve redispatch of generation or load curtailment. Other possible means for relieving congestion are operation of FACTS devices (TCSC), these two ways are compared in this paper.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Perturbation method based evaluation of power system voltage security Allocating generation to loads and line flows for transmission open access Z-transform PML algorithm for truncating metamaterial FDTD domains A personal search agent system Optimum design of high frequency transformer for compact and light weight switch mode power supplies (SMPS)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1