N. Vikulin, V. A. Rusakov, A. A. Aliyev, Oleg Igorevich Mityaev
{"title":"多级增产设计的新机遇——单尺寸可溶球激活压裂滑套","authors":"N. Vikulin, V. A. Rusakov, A. A. Aliyev, Oleg Igorevich Mityaev","doi":"10.2118/201853-ms","DOIUrl":null,"url":null,"abstract":"\n This article includes review of evolution of multistage fracturing completions for conventional oil reserves in continental Russia and focuses on attempts of the LLC \"RN-Yuganskneftegaz\", the one of the largest operator company in Russia, to solve the challenge of well life extension by implementing new completion technologies allowing reliable means of re-fracturing on the well after several years of service as well as the means to isolate gas or water break-through.\n A comparative analysis of different types of multistage fracturing completions was performed by LLC \"RN-Yuganskneftegaz\" with the aim to select the most suitable technology to address the above-mentioned goals without sacrifice of time required to drill, complete and stimulate the well.\n As the result of the analysis the technology of the frac valves activated by single-sized dissolvable balls was selected as a most appropriate. The successful field trial on 2 wells is described in this paper.","PeriodicalId":359083,"journal":{"name":"Day 2 Tue, October 27, 2020","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"New Opportunities for Multistage Stimulation Design - Frac Sleeves Activated by Single-Sized Dissolvable Balls\",\"authors\":\"N. Vikulin, V. A. Rusakov, A. A. Aliyev, Oleg Igorevich Mityaev\",\"doi\":\"10.2118/201853-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This article includes review of evolution of multistage fracturing completions for conventional oil reserves in continental Russia and focuses on attempts of the LLC \\\"RN-Yuganskneftegaz\\\", the one of the largest operator company in Russia, to solve the challenge of well life extension by implementing new completion technologies allowing reliable means of re-fracturing on the well after several years of service as well as the means to isolate gas or water break-through.\\n A comparative analysis of different types of multistage fracturing completions was performed by LLC \\\"RN-Yuganskneftegaz\\\" with the aim to select the most suitable technology to address the above-mentioned goals without sacrifice of time required to drill, complete and stimulate the well.\\n As the result of the analysis the technology of the frac valves activated by single-sized dissolvable balls was selected as a most appropriate. The successful field trial on 2 wells is described in this paper.\",\"PeriodicalId\":359083,\"journal\":{\"name\":\"Day 2 Tue, October 27, 2020\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, October 27, 2020\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/201853-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, October 27, 2020","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/201853-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
New Opportunities for Multistage Stimulation Design - Frac Sleeves Activated by Single-Sized Dissolvable Balls
This article includes review of evolution of multistage fracturing completions for conventional oil reserves in continental Russia and focuses on attempts of the LLC "RN-Yuganskneftegaz", the one of the largest operator company in Russia, to solve the challenge of well life extension by implementing new completion technologies allowing reliable means of re-fracturing on the well after several years of service as well as the means to isolate gas or water break-through.
A comparative analysis of different types of multistage fracturing completions was performed by LLC "RN-Yuganskneftegaz" with the aim to select the most suitable technology to address the above-mentioned goals without sacrifice of time required to drill, complete and stimulate the well.
As the result of the analysis the technology of the frac valves activated by single-sized dissolvable balls was selected as a most appropriate. The successful field trial on 2 wells is described in this paper.