{"title":"英国合同法中的损害赔偿谈判","authors":"Sirko Harder","doi":"10.25148/lawrev.14.1.7","DOIUrl":null,"url":null,"abstract":"This article evaluates the decision by the UK Supreme Court in One Step (Support) Ltd. v. Morris-Garner (2018), \nin which the Court laid down the circumstances in which damages for breach of contract may be measured by reference to the amount of the fee that the innocent party could have demanded from the breaching party for a release of the latter from the relevant obligation (\"negotiating damages\").","PeriodicalId":300333,"journal":{"name":"FIU Law Review","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Negotiating Damages in English Contract Law\",\"authors\":\"Sirko Harder\",\"doi\":\"10.25148/lawrev.14.1.7\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article evaluates the decision by the UK Supreme Court in One Step (Support) Ltd. v. Morris-Garner (2018), \\nin which the Court laid down the circumstances in which damages for breach of contract may be measured by reference to the amount of the fee that the innocent party could have demanded from the breaching party for a release of the latter from the relevant obligation (\\\"negotiating damages\\\").\",\"PeriodicalId\":300333,\"journal\":{\"name\":\"FIU Law Review\",\"volume\":\"35 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"FIU Law Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25148/lawrev.14.1.7\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"FIU Law Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25148/lawrev.14.1.7","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
This article evaluates the decision by the UK Supreme Court in One Step (Support) Ltd. v. Morris-Garner (2018),
in which the Court laid down the circumstances in which damages for breach of contract may be measured by reference to the amount of the fee that the innocent party could have demanded from the breaching party for a release of the latter from the relevant obligation ("negotiating damages").