{"title":"双馈风力发电机故障穿越新策略","authors":"A. Kasem, E. El-Saadany, H. El-Tamaly, M. Wahab","doi":"10.1109/EPC.2007.4520297","DOIUrl":null,"url":null,"abstract":"Withstanding grid faults becomes an obligation for the bulk wind generation units connected to the transmission network and it is highly desired for distribution wind generators. In this paper, a proposed scheme is implemented for DFIG to keep it operating during transient grid faults. Challenges imposed on the generator configuration and the control during the fault and recovering periods are presented. A comprehensive time domain model for the DFIG with the decoupled dq controller is implemented using Matlab/Simulink software. Intensive simulation results are discussed to ensure the validity and feasibility of the proposed fault ride through technique. The scheme protects the DFIG components, fulfills the grid code requirements, and optimizes the hardware added to the generator.","PeriodicalId":196861,"journal":{"name":"2007 IEEE Canada Electrical Power Conference","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"A New Fault Ride-through Strategy for Doubly Fed Wind-Power Induction Generator\",\"authors\":\"A. Kasem, E. El-Saadany, H. El-Tamaly, M. Wahab\",\"doi\":\"10.1109/EPC.2007.4520297\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Withstanding grid faults becomes an obligation for the bulk wind generation units connected to the transmission network and it is highly desired for distribution wind generators. In this paper, a proposed scheme is implemented for DFIG to keep it operating during transient grid faults. Challenges imposed on the generator configuration and the control during the fault and recovering periods are presented. A comprehensive time domain model for the DFIG with the decoupled dq controller is implemented using Matlab/Simulink software. Intensive simulation results are discussed to ensure the validity and feasibility of the proposed fault ride through technique. The scheme protects the DFIG components, fulfills the grid code requirements, and optimizes the hardware added to the generator.\",\"PeriodicalId\":196861,\"journal\":{\"name\":\"2007 IEEE Canada Electrical Power Conference\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 IEEE Canada Electrical Power Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPC.2007.4520297\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Canada Electrical Power Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPC.2007.4520297","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A New Fault Ride-through Strategy for Doubly Fed Wind-Power Induction Generator
Withstanding grid faults becomes an obligation for the bulk wind generation units connected to the transmission network and it is highly desired for distribution wind generators. In this paper, a proposed scheme is implemented for DFIG to keep it operating during transient grid faults. Challenges imposed on the generator configuration and the control during the fault and recovering periods are presented. A comprehensive time domain model for the DFIG with the decoupled dq controller is implemented using Matlab/Simulink software. Intensive simulation results are discussed to ensure the validity and feasibility of the proposed fault ride through technique. The scheme protects the DFIG components, fulfills the grid code requirements, and optimizes the hardware added to the generator.