{"title":"基于4M方法的工厂建设阶段专家感知安全管理因素分析","authors":"Kyujin Kim, Byung-Sun 理쒕퀝 Choi, J. Chun","doi":"10.6106/KJCEM.2016.17.1.018","DOIUrl":null,"url":null,"abstract":"The purpose of this study is to classify main risk factors on a construction phase of a plant project and analyze importance by the risk factors. Plant Industry is continuing boom and the increase in overseas plant orders in 2014 has showed a performance increase of 61% of the total orders, as the plant industry are risk factors for the construction phase, safety management target recognition and variety of accident prevention and safety factors by importance, etc. a situation that requires the development and introduction of management. So, it is performed that collected disaster conditions data on a construction phase of a plant project, is questioned by plant construction professional and is classified by 4M. Then, it is performed that is questioned by plant construction and safety professional in order to apply AHP method, and is presented from analyzing the risk factors, which are results of the survey, by importance and priority. This study will recognize from identifying the main risk factors in advance and will be utilized as a basic data is to prevent the risk factors.","PeriodicalId":220018,"journal":{"name":"Korean Journal of Construction Engineering and Management","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-01-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Safety Management Factor Analysis of Expert Perceptions Based on 4M Method for Plant Construction Phase\",\"authors\":\"Kyujin Kim, Byung-Sun 理쒕퀝 Choi, J. Chun\",\"doi\":\"10.6106/KJCEM.2016.17.1.018\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this study is to classify main risk factors on a construction phase of a plant project and analyze importance by the risk factors. Plant Industry is continuing boom and the increase in overseas plant orders in 2014 has showed a performance increase of 61% of the total orders, as the plant industry are risk factors for the construction phase, safety management target recognition and variety of accident prevention and safety factors by importance, etc. a situation that requires the development and introduction of management. So, it is performed that collected disaster conditions data on a construction phase of a plant project, is questioned by plant construction professional and is classified by 4M. Then, it is performed that is questioned by plant construction and safety professional in order to apply AHP method, and is presented from analyzing the risk factors, which are results of the survey, by importance and priority. This study will recognize from identifying the main risk factors in advance and will be utilized as a basic data is to prevent the risk factors.\",\"PeriodicalId\":220018,\"journal\":{\"name\":\"Korean Journal of Construction Engineering and Management\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-01-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Korean Journal of Construction Engineering and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.6106/KJCEM.2016.17.1.018\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Korean Journal of Construction Engineering and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.6106/KJCEM.2016.17.1.018","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究的目的是对某工厂工程建设阶段的主要风险因素进行分类,并通过风险因素分析其重要性。工厂行业持续繁荣,2014年海外工厂订单的增长已显示出总订单的61%的业绩增长,因为工厂行业是风险因素的建设阶段,安全管理目标的识别和各种事故的预防和安全因素的重要性等情况,需要开发和引进管理。因此,将收集到的某厂项目某一施工阶段的灾情数据,由厂建专业人员进行质疑,并按4M进行分类。然后,对工厂建设和安全专业人员提出了问题,以便应用层次分析法,并从调查结果的风险因素分析中提出了重要性和优先级。本研究将提前识别出主要的危险因素,并将其作为预防危险因素的基础数据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Safety Management Factor Analysis of Expert Perceptions Based on 4M Method for Plant Construction Phase
The purpose of this study is to classify main risk factors on a construction phase of a plant project and analyze importance by the risk factors. Plant Industry is continuing boom and the increase in overseas plant orders in 2014 has showed a performance increase of 61% of the total orders, as the plant industry are risk factors for the construction phase, safety management target recognition and variety of accident prevention and safety factors by importance, etc. a situation that requires the development and introduction of management. So, it is performed that collected disaster conditions data on a construction phase of a plant project, is questioned by plant construction professional and is classified by 4M. Then, it is performed that is questioned by plant construction and safety professional in order to apply AHP method, and is presented from analyzing the risk factors, which are results of the survey, by importance and priority. This study will recognize from identifying the main risk factors in advance and will be utilized as a basic data is to prevent the risk factors.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
BIM 기술 융·복합 수준 분석을 위한 특허 정보 활용 방안 Analysis of Leasing Decision Determinants by the Store Size and Lend-Lease Perspectives for Mix-Used Shopping Mall Development Seamless Superimposition Technique of Virtual Objects for AR System of Excavator Based on Image Processing Review of Real Options Analysis for Renewable Energy Projects Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1