{"title":"高铁进出站列车停靠方案优化","authors":"Han Wang, Y. Yue","doi":"10.1109/ICITE50838.2020.9231477","DOIUrl":null,"url":null,"abstract":"Efficient train platforming plans at high-speed railway stations are important for the station work organization. By defining four types of train technical operation chains and their corresponding occupation times of arrival-departure tracks, this paper proposes a multi-objective optimization model to simultaneously optimize the organized and balance use of station tracks. Based on dispatching principles, train movement constraints are constructed to avoid potential conflicts at congested high-speed railway stations. The multi-objective planning model is transformed into a single object model through min-max method and finally solved by The General Algebraic Modeling System (GAMS). The proposed method is tested in Xiong'an Station to generate track operation plans from 6:00am to 9:00am.","PeriodicalId":112371,"journal":{"name":"2020 IEEE 5th International Conference on Intelligent Transportation Engineering (ICITE)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Optimizing Train-Platforming Plans at Arrival-Departure Tracks of High-speed Railway Stations\",\"authors\":\"Han Wang, Y. Yue\",\"doi\":\"10.1109/ICITE50838.2020.9231477\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Efficient train platforming plans at high-speed railway stations are important for the station work organization. By defining four types of train technical operation chains and their corresponding occupation times of arrival-departure tracks, this paper proposes a multi-objective optimization model to simultaneously optimize the organized and balance use of station tracks. Based on dispatching principles, train movement constraints are constructed to avoid potential conflicts at congested high-speed railway stations. The multi-objective planning model is transformed into a single object model through min-max method and finally solved by The General Algebraic Modeling System (GAMS). The proposed method is tested in Xiong'an Station to generate track operation plans from 6:00am to 9:00am.\",\"PeriodicalId\":112371,\"journal\":{\"name\":\"2020 IEEE 5th International Conference on Intelligent Transportation Engineering (ICITE)\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 IEEE 5th International Conference on Intelligent Transportation Engineering (ICITE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICITE50838.2020.9231477\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE 5th International Conference on Intelligent Transportation Engineering (ICITE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICITE50838.2020.9231477","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Optimizing Train-Platforming Plans at Arrival-Departure Tracks of High-speed Railway Stations
Efficient train platforming plans at high-speed railway stations are important for the station work organization. By defining four types of train technical operation chains and their corresponding occupation times of arrival-departure tracks, this paper proposes a multi-objective optimization model to simultaneously optimize the organized and balance use of station tracks. Based on dispatching principles, train movement constraints are constructed to avoid potential conflicts at congested high-speed railway stations. The multi-objective planning model is transformed into a single object model through min-max method and finally solved by The General Algebraic Modeling System (GAMS). The proposed method is tested in Xiong'an Station to generate track operation plans from 6:00am to 9:00am.