项目管理中的项目目的理论简介

Umar A. Altahtooh, M. Emsley
{"title":"项目管理中的项目目的理论简介","authors":"Umar A. Altahtooh, M. Emsley","doi":"10.4018/IJITPM.2017070105","DOIUrl":null,"url":null,"abstract":"Almostallprojectmanagementsoftwarehaslackofdisplayingtheoutcomesofprojectsasafeature. Thisisbecausethereisnorecognizedwayofcalculatingtheactualprojectdurationcomparedtothe authorizedprojectduration.DatawerecollectedthroughamixedmethodusingaCriticalIncident Technique (CIT)anda survey.The study finds that timeerror canoccur throughout theproject executionphase.Findingssuggest thatchallengedprojectscouldbesuccessfulor failedprojects usingamodelofITProjectOutcomesTesting(MITPOT).Thus,thismodelestablishesafoundation ofProjectEndTheory(PET). KEywoRdS Actual Project Duration, Challenged Project, Failure, IT Project, Success, Time Error","PeriodicalId":375999,"journal":{"name":"Int. J. Inf. Technol. Proj. Manag.","volume":"24 2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"An Introduction to Project End Theory in Project Management\",\"authors\":\"Umar A. Altahtooh, M. Emsley\",\"doi\":\"10.4018/IJITPM.2017070105\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Almostallprojectmanagementsoftwarehaslackofdisplayingtheoutcomesofprojectsasafeature. Thisisbecausethereisnorecognizedwayofcalculatingtheactualprojectdurationcomparedtothe authorizedprojectduration.DatawerecollectedthroughamixedmethodusingaCriticalIncident Technique (CIT)anda survey.The study finds that timeerror canoccur throughout theproject executionphase.Findingssuggest thatchallengedprojectscouldbesuccessfulor failedprojects usingamodelofITProjectOutcomesTesting(MITPOT).Thus,thismodelestablishesafoundation ofProjectEndTheory(PET). KEywoRdS Actual Project Duration, Challenged Project, Failure, IT Project, Success, Time Error\",\"PeriodicalId\":375999,\"journal\":{\"name\":\"Int. J. Inf. Technol. Proj. Manag.\",\"volume\":\"24 2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Int. J. Inf. Technol. Proj. Manag.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4018/IJITPM.2017070105\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Inf. Technol. Proj. Manag.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/IJITPM.2017070105","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

Almostallprojectmanagementsoftwarehaslackofdisplayingtheoutcomesofprojectsasafeature。Thisisbecausethereisnorecognizedwayofcalculatingtheactualprojectdurationcomparedtothe authorizedprojectduration。DatawerecollectedthroughamixedmethodusingaCriticalIncident technque_ (CIT)anda调查。The研究发现,timeerror canoccur贯穿始终theproject executionphase。Findingssuggest thatchallengedprojectscouldbesuccessfulor failedprojects usingamodelofITProjectOutcomesTesting(MITPOT)。Thus,thismodelestablishesafoundation ofProjectEndTheory(PET)。关键词实际项目工期,挑战项目,失败,IT项目,成功,时间错误
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
An Introduction to Project End Theory in Project Management
Almostallprojectmanagementsoftwarehaslackofdisplayingtheoutcomesofprojectsasafeature. Thisisbecausethereisnorecognizedwayofcalculatingtheactualprojectdurationcomparedtothe authorizedprojectduration.DatawerecollectedthroughamixedmethodusingaCriticalIncident Technique (CIT)anda survey.The study finds that timeerror canoccur throughout theproject executionphase.Findingssuggest thatchallengedprojectscouldbesuccessfulor failedprojects usingamodelofITProjectOutcomesTesting(MITPOT).Thus,thismodelestablishesafoundation ofProjectEndTheory(PET). KEywoRdS Actual Project Duration, Challenged Project, Failure, IT Project, Success, Time Error
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Adapting P2M Framework for Innovation Program Management Through a Lean-Agile Approach Mining Project Failure Indicators From Big Data Using Machine Learning Mixed Methods A Proposal for Research on the Application of AI/ML in ITPM: Intelligent Project Management "Soar" or "Sore": Examining and Reflecting on Bank Performance During Global Financial Crisis - An Indian Scenario FDI Inflow in BRICS and G7: An Empirical Analysis
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1