{"title":"面向高峰负荷管理的主动配电网分布式储能系统优化选址与规模研究","authors":"Z. Cai, Kun Yang, Y. Gu, Sirong Pan, Sashuang Sun, Hanzheng Xie, Peilin Li","doi":"10.1109/ACFPE56003.2022.9952232","DOIUrl":null,"url":null,"abstract":"With the continuous technical economy improvement of electric energy storage, it has become a trend to integrate a large number of DESSs (Distributed Energy Storage Systems) in the distribution network. In order to make full use of the battery energy storage system to delay the upgrading and reconstruction of the distribution network, a comprehensive optimization method of selecting the site and capacity to participate in the peak load regulation of distribution network is proposed. In the proposed method, a bilevel planning model is built where the upper layer model is the capacity configuration model, which considers the investment income of DESSs and delaying the expansion and upgrade of the distribution network; whereas the lower layer model is the installation spot optimization model, which considers the characteristics and capacity limit of DESSs, and the load regulation for peak-load shifting. The validity of the proposed method is verified by the IEEE 33-bus system. Simulative results show that, the proposed comprehensive optimization method is suitable for different application scenarios with the integration of DESSs of different capacity configurations and different installation spots and can provide a technical support for the planning and managing of largescale DESSs accessing to the distribution network.","PeriodicalId":198086,"journal":{"name":"2022 Asian Conference on Frontiers of Power and Energy (ACFPE)","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Optimal Siting and Sizing for Distributed Energy Storage System in Active Distribution Networks for Peak Load Management\",\"authors\":\"Z. Cai, Kun Yang, Y. Gu, Sirong Pan, Sashuang Sun, Hanzheng Xie, Peilin Li\",\"doi\":\"10.1109/ACFPE56003.2022.9952232\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the continuous technical economy improvement of electric energy storage, it has become a trend to integrate a large number of DESSs (Distributed Energy Storage Systems) in the distribution network. In order to make full use of the battery energy storage system to delay the upgrading and reconstruction of the distribution network, a comprehensive optimization method of selecting the site and capacity to participate in the peak load regulation of distribution network is proposed. In the proposed method, a bilevel planning model is built where the upper layer model is the capacity configuration model, which considers the investment income of DESSs and delaying the expansion and upgrade of the distribution network; whereas the lower layer model is the installation spot optimization model, which considers the characteristics and capacity limit of DESSs, and the load regulation for peak-load shifting. The validity of the proposed method is verified by the IEEE 33-bus system. Simulative results show that, the proposed comprehensive optimization method is suitable for different application scenarios with the integration of DESSs of different capacity configurations and different installation spots and can provide a technical support for the planning and managing of largescale DESSs accessing to the distribution network.\",\"PeriodicalId\":198086,\"journal\":{\"name\":\"2022 Asian Conference on Frontiers of Power and Energy (ACFPE)\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 Asian Conference on Frontiers of Power and Energy (ACFPE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ACFPE56003.2022.9952232\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 Asian Conference on Frontiers of Power and Energy (ACFPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ACFPE56003.2022.9952232","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

随着电力储能技术经济性的不断提高,在配电网中大量集成分布式储能系统(dess)已成为一种趋势。为了充分利用蓄电池储能系统延迟配电网的升级改造,提出了一种参与配电网调峰的地点和容量选择的综合优化方法。该方法考虑了dess的投资收益和配电网扩容升级的延迟,建立了二层规划模型,上层模型为容量配置模型;下层模型为考虑dess特性、容量限制和调峰的安装点优化模型。通过IEEE 33总线系统验证了该方法的有效性。仿真结果表明,所提出的综合优化方法适用于不同容量配置、不同安装点的分布式分布式电源集成的不同应用场景,可为大型分布式分布式电源接入配电网的规划和管理提供技术支持。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimal Siting and Sizing for Distributed Energy Storage System in Active Distribution Networks for Peak Load Management
With the continuous technical economy improvement of electric energy storage, it has become a trend to integrate a large number of DESSs (Distributed Energy Storage Systems) in the distribution network. In order to make full use of the battery energy storage system to delay the upgrading and reconstruction of the distribution network, a comprehensive optimization method of selecting the site and capacity to participate in the peak load regulation of distribution network is proposed. In the proposed method, a bilevel planning model is built where the upper layer model is the capacity configuration model, which considers the investment income of DESSs and delaying the expansion and upgrade of the distribution network; whereas the lower layer model is the installation spot optimization model, which considers the characteristics and capacity limit of DESSs, and the load regulation for peak-load shifting. The validity of the proposed method is verified by the IEEE 33-bus system. Simulative results show that, the proposed comprehensive optimization method is suitable for different application scenarios with the integration of DESSs of different capacity configurations and different installation spots and can provide a technical support for the planning and managing of largescale DESSs accessing to the distribution network.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Projection Method of Energy Storage System in Power Spot Market for Renewable Accommodation A Copeland-Method-based Weakness Identification for the Components in Transmission Systems Under Natural Disasters Optimization Clearing Model of Regional Integrated Electricity Market Transaction in the Dual Track System of Planning and Market Mechanism analysis of power fluctuation of wind power AC transmission channel caused by DC commutation failure Research on energy regulation strategy of six-phase motor for multi-mode combined propulsion system
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1