{"title":"基于粗糙集的网格计算中可用资源优化检测新方法","authors":"Asgarali Bouyer, M. N. MD SAP, A. Abdullah","doi":"10.1109/ICICT.2009.5267209","DOIUrl":null,"url":null,"abstract":"Since the Grid is a dynamic environment, the prediction and detection of available resources in near future is important for resource scheduling. Economic-based grid management has been viewed as a feasible approach to carry out fair, efficient and reliable scheduling. One key issue in Economic-based grid strategy is to inform about available resources. In this paper, we present a novel predictable method to specify available resource in economic-based grid. This method use a rough set analysis by scheduler to divide resources in groups and then grant a priority to each group based on cost price and efficiency of nodes. The result show that our proposed method has an acceptable performance and it try to use cheaper and suitable resources for each job to decrease cost price of computation.","PeriodicalId":147005,"journal":{"name":"2009 International Conference on Information and Communication Technologies","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-09-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A new rough set based approach for optimized detection of available resources in Grid computing\",\"authors\":\"Asgarali Bouyer, M. N. MD SAP, A. Abdullah\",\"doi\":\"10.1109/ICICT.2009.5267209\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Since the Grid is a dynamic environment, the prediction and detection of available resources in near future is important for resource scheduling. Economic-based grid management has been viewed as a feasible approach to carry out fair, efficient and reliable scheduling. One key issue in Economic-based grid strategy is to inform about available resources. In this paper, we present a novel predictable method to specify available resource in economic-based grid. This method use a rough set analysis by scheduler to divide resources in groups and then grant a priority to each group based on cost price and efficiency of nodes. The result show that our proposed method has an acceptable performance and it try to use cheaper and suitable resources for each job to decrease cost price of computation.\",\"PeriodicalId\":147005,\"journal\":{\"name\":\"2009 International Conference on Information and Communication Technologies\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-09-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 International Conference on Information and Communication Technologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICICT.2009.5267209\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 International Conference on Information and Communication Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICICT.2009.5267209","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A new rough set based approach for optimized detection of available resources in Grid computing
Since the Grid is a dynamic environment, the prediction and detection of available resources in near future is important for resource scheduling. Economic-based grid management has been viewed as a feasible approach to carry out fair, efficient and reliable scheduling. One key issue in Economic-based grid strategy is to inform about available resources. In this paper, we present a novel predictable method to specify available resource in economic-based grid. This method use a rough set analysis by scheduler to divide resources in groups and then grant a priority to each group based on cost price and efficiency of nodes. The result show that our proposed method has an acceptable performance and it try to use cheaper and suitable resources for each job to decrease cost price of computation.