具有可变故障率的不可靠的多服务器机器可修复系统

Shengli Lv, Jingbo Li, Dequan Yue
{"title":"具有可变故障率的不可靠的多服务器机器可修复系统","authors":"Shengli Lv, Jingbo Li, Dequan Yue","doi":"10.1080/10170669.2011.599431","DOIUrl":null,"url":null,"abstract":"We consider the machine repair system in which K identical unreliable machines are maintained by N servers. Each server is subject to breakdown even if no failed machines are in the system. There are c reliable repairmen in the system to repair the breakdown servers. Failure and service times of the machines, and breakdown and repair times of the servers, are assumed to follow a negative exponential distribution. Each unreliable server has different breakdown rates in its busy times and idle times. The system performance measures are obtained by a matrix geometric method. Some important relationships between the system performance measures are given. An optimization model is developed for the optimum numbers of servers and repairmen to minimize the expected total cost of the system. A numerical example is given for illustration.","PeriodicalId":369256,"journal":{"name":"Journal of The Chinese Institute of Industrial Engineers","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Uunreliable multi-server machine repairable system with variable breakdown rates\",\"authors\":\"Shengli Lv, Jingbo Li, Dequan Yue\",\"doi\":\"10.1080/10170669.2011.599431\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We consider the machine repair system in which K identical unreliable machines are maintained by N servers. Each server is subject to breakdown even if no failed machines are in the system. There are c reliable repairmen in the system to repair the breakdown servers. Failure and service times of the machines, and breakdown and repair times of the servers, are assumed to follow a negative exponential distribution. Each unreliable server has different breakdown rates in its busy times and idle times. The system performance measures are obtained by a matrix geometric method. Some important relationships between the system performance measures are given. An optimization model is developed for the optimum numbers of servers and repairmen to minimize the expected total cost of the system. A numerical example is given for illustration.\",\"PeriodicalId\":369256,\"journal\":{\"name\":\"Journal of The Chinese Institute of Industrial Engineers\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of The Chinese Institute of Industrial Engineers\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/10170669.2011.599431\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of The Chinese Institute of Industrial Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/10170669.2011.599431","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

我们考虑一个机器维修系统,其中K台相同的不可靠机器由N台服务器维护。即使系统中没有发生故障的机器,每个服务器也会发生故障。系统中有可靠的维修人员对故障服务器进行维修。假设机器的故障和服务时间以及服务器的故障和修复时间遵循负指数分布。每个不可靠的服务器在繁忙时间和空闲时间都有不同的故障率。采用矩阵几何方法获得了系统的性能指标。给出了系统性能指标之间的一些重要关系。为了使系统的预期总成本最小,建立了服务器和维修人员的最佳数量的优化模型。给出了一个数值算例进行说明。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Uunreliable multi-server machine repairable system with variable breakdown rates
We consider the machine repair system in which K identical unreliable machines are maintained by N servers. Each server is subject to breakdown even if no failed machines are in the system. There are c reliable repairmen in the system to repair the breakdown servers. Failure and service times of the machines, and breakdown and repair times of the servers, are assumed to follow a negative exponential distribution. Each unreliable server has different breakdown rates in its busy times and idle times. The system performance measures are obtained by a matrix geometric method. Some important relationships between the system performance measures are given. An optimization model is developed for the optimum numbers of servers and repairmen to minimize the expected total cost of the system. A numerical example is given for illustration.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Parallel machines scheduling with deterioration effects and resource allocations A cut-to-order strategy for one-dimensional cable cutting and a case study A preliminary field study of optimal trunk flexion by subjective discomfort in recreational cyclists A scatter search method for the multidimensional knapsack problem with generalized upper bound constraints Fabrication and turning of Al/SiC/B4C hybrid metal matrix composites optimization using desirability analysis
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1