B. Palyagar, P. Shanthakumar, A. Kishore
{"title":"Visual Strawman将程序RE关联到项目RE","authors":"B. Palyagar, P. Shanthakumar, A. Kishore","doi":"10.1109/REV.2008.5","DOIUrl":null,"url":null,"abstract":"Requirements Engineering (RE) of a program is closely related to that of the projects within the program. The relationships dictate timelines of the program and related projects. Further, the relationships determine the effect of Change on the program, and the intensity of risk management required to reduce program failures. Inherent complexity of RE phase forces the relationships intricate thus making program management a difficult exercise. Familiar methods to represent relationships are descriptive alphanumeric data and gantt charts. These methods are inadequate to present the Program and Project phases with their relationships in a single paradigm. Further, with the existing methods, it is difficult to present Desired and Actual states of Program and Project phases in one model. This paper presents a tested visualization technique to connect a program RE with its projects. The technique provides an easy way to represent association of program RE to project RE.","PeriodicalId":429417,"journal":{"name":"2008 Requirements Engineering Visualization","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-09-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Visual Strawman to Relate Program RE to Project RE\",\"authors\":\"B. Palyagar, P. Shanthakumar, A. Kishore\",\"doi\":\"10.1109/REV.2008.5\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Requirements Engineering (RE) of a program is closely related to that of the projects within the program. The relationships dictate timelines of the program and related projects. Further, the relationships determine the effect of Change on the program, and the intensity of risk management required to reduce program failures. Inherent complexity of RE phase forces the relationships intricate thus making program management a difficult exercise. Familiar methods to represent relationships are descriptive alphanumeric data and gantt charts. These methods are inadequate to present the Program and Project phases with their relationships in a single paradigm. Further, with the existing methods, it is difficult to present Desired and Actual states of Program and Project phases in one model. This paper presents a tested visualization technique to connect a program RE with its projects. The technique provides an easy way to represent association of program RE to project RE.\",\"PeriodicalId\":429417,\"journal\":{\"name\":\"2008 Requirements Engineering Visualization\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-09-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 Requirements Engineering Visualization\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/REV.2008.5\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 Requirements Engineering Visualization","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REV.2008.5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

一个规划的需求工程(RE)与规划中的项目的需求工程密切相关。这种关系决定了计划和相关项目的时间表。此外,这些关系决定了变更对规划的影响,以及减少规划失败所需的风险管理强度。RE阶段固有的复杂性迫使关系错综复杂,从而使项目管理成为一项困难的工作。表示关系的常见方法是描述性字母数字数据和甘特图。这些方法不足以在单一范例中呈现计划和项目阶段及其关系。此外,使用现有的方法,很难在一个模型中表示计划和项目阶段的期望状态和实际状态。本文提出了一种将程序RE与其项目连接起来的可视化技术。该技术提供了一种简单的方法来表示程序可再生资源到项目可再生资源的关联。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Visual Strawman to Relate Program RE to Project RE
Requirements Engineering (RE) of a program is closely related to that of the projects within the program. The relationships dictate timelines of the program and related projects. Further, the relationships determine the effect of Change on the program, and the intensity of risk management required to reduce program failures. Inherent complexity of RE phase forces the relationships intricate thus making program management a difficult exercise. Familiar methods to represent relationships are descriptive alphanumeric data and gantt charts. These methods are inadequate to present the Program and Project phases with their relationships in a single paradigm. Further, with the existing methods, it is difficult to present Desired and Actual states of Program and Project phases in one model. This paper presents a tested visualization technique to connect a program RE with its projects. The technique provides an easy way to represent association of program RE to project RE.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Graph-based Visualization of Requirements Relationships Modelling Trust Requirements by Means of a Visualization Language Visual Strawman to Relate Program RE to Project RE On Usability in Requirements Trace Visualizations Beyond Documents: Visualizing Informal Communication
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1