影响变压器级别的160 kVA和100 kVA达到250kVA/400V对Tonys Villa度假村和水疗酒店的电力消耗成本的影响

I. Sutama, Komang Hermawan, I. W. Suriana
{"title":"影响变压器级别的160 kVA和100 kVA达到250kVA/400V对Tonys Villa度假村和水疗酒店的电力消耗成本的影响","authors":"I. Sutama, Komang Hermawan, I. W. Suriana","doi":"10.38043/telsinas.v5i1.3689","DOIUrl":null,"url":null,"abstract":"Hotel Tonys Villa and Resort was established in 2000 which is one of the 4-star hotels on the island of Bali which is located on Jalan Petitenget, South Kuta District, Badung. This hotel has a number of rooms, namely 22 Bungalow Rooms, 9 Pinky Villas, 40 Hotel Rooms, 3 large public pools and so on. One of the problems faced by this hotel is the increase in energy operational costs that are paid more than the budget with a minus average of Rp. 837,713 to Rp. 11,851,463 for each month. The method used is to analyze electricity cost savings by upgrading 160 and 100 KVA transformers to 1 250 KVA transformer, and analyze whether one 250 kVA transformer is able to carry the entire burden of Tonys Villa and Resort Hotel. The use of a 250 KVA transformer is considered more efficient than the use of a transformer (160 KVA and 100 KVA) with a cost difference of IDR 12,875,350 for each month and can save around IDR 154,504,200 within 1 year. In calculating the RM (Minimum Account) fee for the use of a 250 KVA transformer, it is considered more efficient and can save costs of Rp. 4,625,480 for each month if the use of the transformer is less than 40 hours and if the customer uses the transformer for more than 40 hours of use, then the financing will be calculated normally.","PeriodicalId":252670,"journal":{"name":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","volume":"83 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Pengaruh Up Grade Transformator 160 kVA dan 100 kVA Menjadi 250kVA/400V Terhadap Biaya Operasional Pemakaian Energi Listrik di Hotel Tonys Villa Resort and Spa\",\"authors\":\"I. Sutama, Komang Hermawan, I. W. Suriana\",\"doi\":\"10.38043/telsinas.v5i1.3689\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Hotel Tonys Villa and Resort was established in 2000 which is one of the 4-star hotels on the island of Bali which is located on Jalan Petitenget, South Kuta District, Badung. This hotel has a number of rooms, namely 22 Bungalow Rooms, 9 Pinky Villas, 40 Hotel Rooms, 3 large public pools and so on. One of the problems faced by this hotel is the increase in energy operational costs that are paid more than the budget with a minus average of Rp. 837,713 to Rp. 11,851,463 for each month. The method used is to analyze electricity cost savings by upgrading 160 and 100 KVA transformers to 1 250 KVA transformer, and analyze whether one 250 kVA transformer is able to carry the entire burden of Tonys Villa and Resort Hotel. The use of a 250 KVA transformer is considered more efficient than the use of a transformer (160 KVA and 100 KVA) with a cost difference of IDR 12,875,350 for each month and can save around IDR 154,504,200 within 1 year. In calculating the RM (Minimum Account) fee for the use of a 250 KVA transformer, it is considered more efficient and can save costs of Rp. 4,625,480 for each month if the use of the transformer is less than 40 hours and if the customer uses the transformer for more than 40 hours of use, then the financing will be calculated normally.\",\"PeriodicalId\":252670,\"journal\":{\"name\":\"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi\",\"volume\":\"83 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-04-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.38043/telsinas.v5i1.3689\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.38043/telsinas.v5i1.3689","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Tonys Villa and Resort酒店成立于2000年,是巴厘岛上的四星级酒店之一,位于巴东南库塔区Jalan Petitenget。酒店拥有22间平房,9间Pinky Villas, 40间酒店客房,3个大型公共游泳池等。这家酒店面临的问题之一是能源运营成本的增加,其支付的费用超过了预算,每月平均为837,713卢比至11,851,463卢比。使用的方法是分析将160和100 KVA变压器升级为1 250 KVA变压器所节省的电费,并分析一台250 KVA变压器是否能够承担Tonys别墅和度假酒店的全部负担。使用250 KVA变压器被认为比使用变压器(160 KVA和100 KVA)更有效,每月成本差异为12,875,350印尼盾,一年内可节省约154,504,200印尼盾。在计算使用250千伏安变压器的RM(最低账户)费用时,如果变压器的使用时间少于40小时,如果客户使用变压器的使用时间超过40小时,则认为它更有效,可以节省每月4,625,480卢比的成本,那么融资将正常计算。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Pengaruh Up Grade Transformator 160 kVA dan 100 kVA Menjadi 250kVA/400V Terhadap Biaya Operasional Pemakaian Energi Listrik di Hotel Tonys Villa Resort and Spa
Hotel Tonys Villa and Resort was established in 2000 which is one of the 4-star hotels on the island of Bali which is located on Jalan Petitenget, South Kuta District, Badung. This hotel has a number of rooms, namely 22 Bungalow Rooms, 9 Pinky Villas, 40 Hotel Rooms, 3 large public pools and so on. One of the problems faced by this hotel is the increase in energy operational costs that are paid more than the budget with a minus average of Rp. 837,713 to Rp. 11,851,463 for each month. The method used is to analyze electricity cost savings by upgrading 160 and 100 KVA transformers to 1 250 KVA transformer, and analyze whether one 250 kVA transformer is able to carry the entire burden of Tonys Villa and Resort Hotel. The use of a 250 KVA transformer is considered more efficient than the use of a transformer (160 KVA and 100 KVA) with a cost difference of IDR 12,875,350 for each month and can save around IDR 154,504,200 within 1 year. In calculating the RM (Minimum Account) fee for the use of a 250 KVA transformer, it is considered more efficient and can save costs of Rp. 4,625,480 for each month if the use of the transformer is less than 40 hours and if the customer uses the transformer for more than 40 hours of use, then the financing will be calculated normally.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Pengaruh Dinding Bata Bertulang Terhadap Kinerja Struktur Rangka Dengan Dinding Pengisi (Infilled Frame) Analisa Karakteristik Kecelakaan dan Faktor Penyebab Kecelakaan Akibat Jalan di Provinsi Jambi Analisis Perbaikan Faktor Daya Pada Tranformator 2500KVA/400V di Bandar Udara I Gusti Ngurah Rai Bali Revitalisasi Desain Struktural Gedung Universitas Darul Ulum Melalui Analisis Perbandingan Tulangan Balok T Kajian Fluktuasi Muka Air Tanah dan Kualitas Air Tanah Dangkal Berbasis Sistem Informasi Geografis (SIG) di Kecamatan Denpasar Utara Kota Denpasar
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1