{"title":"影响变压器级别的160 kVA和100 kVA达到250kVA/400V对Tonys Villa度假村和水疗酒店的电力消耗成本的影响","authors":"I. Sutama, Komang Hermawan, I. W. Suriana","doi":"10.38043/telsinas.v5i1.3689","DOIUrl":null,"url":null,"abstract":"Hotel Tonys Villa and Resort was established in 2000 which is one of the 4-star hotels on the island of Bali which is located on Jalan Petitenget, South Kuta District, Badung. This hotel has a number of rooms, namely 22 Bungalow Rooms, 9 Pinky Villas, 40 Hotel Rooms, 3 large public pools and so on. One of the problems faced by this hotel is the increase in energy operational costs that are paid more than the budget with a minus average of Rp. 837,713 to Rp. 11,851,463 for each month. The method used is to analyze electricity cost savings by upgrading 160 and 100 KVA transformers to 1 250 KVA transformer, and analyze whether one 250 kVA transformer is able to carry the entire burden of Tonys Villa and Resort Hotel. The use of a 250 KVA transformer is considered more efficient than the use of a transformer (160 KVA and 100 KVA) with a cost difference of IDR 12,875,350 for each month and can save around IDR 154,504,200 within 1 year. In calculating the RM (Minimum Account) fee for the use of a 250 KVA transformer, it is considered more efficient and can save costs of Rp. 4,625,480 for each month if the use of the transformer is less than 40 hours and if the customer uses the transformer for more than 40 hours of use, then the financing will be calculated normally.","PeriodicalId":252670,"journal":{"name":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","volume":"83 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Pengaruh Up Grade Transformator 160 kVA dan 100 kVA Menjadi 250kVA/400V Terhadap Biaya Operasional Pemakaian Energi Listrik di Hotel Tonys Villa Resort and Spa\",\"authors\":\"I. Sutama, Komang Hermawan, I. W. Suriana\",\"doi\":\"10.38043/telsinas.v5i1.3689\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Hotel Tonys Villa and Resort was established in 2000 which is one of the 4-star hotels on the island of Bali which is located on Jalan Petitenget, South Kuta District, Badung. This hotel has a number of rooms, namely 22 Bungalow Rooms, 9 Pinky Villas, 40 Hotel Rooms, 3 large public pools and so on. One of the problems faced by this hotel is the increase in energy operational costs that are paid more than the budget with a minus average of Rp. 837,713 to Rp. 11,851,463 for each month. The method used is to analyze electricity cost savings by upgrading 160 and 100 KVA transformers to 1 250 KVA transformer, and analyze whether one 250 kVA transformer is able to carry the entire burden of Tonys Villa and Resort Hotel. The use of a 250 KVA transformer is considered more efficient than the use of a transformer (160 KVA and 100 KVA) with a cost difference of IDR 12,875,350 for each month and can save around IDR 154,504,200 within 1 year. In calculating the RM (Minimum Account) fee for the use of a 250 KVA transformer, it is considered more efficient and can save costs of Rp. 4,625,480 for each month if the use of the transformer is less than 40 hours and if the customer uses the transformer for more than 40 hours of use, then the financing will be calculated normally.\",\"PeriodicalId\":252670,\"journal\":{\"name\":\"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi\",\"volume\":\"83 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-04-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.38043/telsinas.v5i1.3689\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.38043/telsinas.v5i1.3689","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
Tonys Villa and Resort酒店成立于2000年,是巴厘岛上的四星级酒店之一,位于巴东南库塔区Jalan Petitenget。酒店拥有22间平房,9间Pinky Villas, 40间酒店客房,3个大型公共游泳池等。这家酒店面临的问题之一是能源运营成本的增加,其支付的费用超过了预算,每月平均为837,713卢比至11,851,463卢比。使用的方法是分析将160和100 KVA变压器升级为1 250 KVA变压器所节省的电费,并分析一台250 KVA变压器是否能够承担Tonys别墅和度假酒店的全部负担。使用250 KVA变压器被认为比使用变压器(160 KVA和100 KVA)更有效,每月成本差异为12,875,350印尼盾,一年内可节省约154,504,200印尼盾。在计算使用250千伏安变压器的RM(最低账户)费用时,如果变压器的使用时间少于40小时,如果客户使用变压器的使用时间超过40小时,则认为它更有效,可以节省每月4,625,480卢比的成本,那么融资将正常计算。
Pengaruh Up Grade Transformator 160 kVA dan 100 kVA Menjadi 250kVA/400V Terhadap Biaya Operasional Pemakaian Energi Listrik di Hotel Tonys Villa Resort and Spa
Hotel Tonys Villa and Resort was established in 2000 which is one of the 4-star hotels on the island of Bali which is located on Jalan Petitenget, South Kuta District, Badung. This hotel has a number of rooms, namely 22 Bungalow Rooms, 9 Pinky Villas, 40 Hotel Rooms, 3 large public pools and so on. One of the problems faced by this hotel is the increase in energy operational costs that are paid more than the budget with a minus average of Rp. 837,713 to Rp. 11,851,463 for each month. The method used is to analyze electricity cost savings by upgrading 160 and 100 KVA transformers to 1 250 KVA transformer, and analyze whether one 250 kVA transformer is able to carry the entire burden of Tonys Villa and Resort Hotel. The use of a 250 KVA transformer is considered more efficient than the use of a transformer (160 KVA and 100 KVA) with a cost difference of IDR 12,875,350 for each month and can save around IDR 154,504,200 within 1 year. In calculating the RM (Minimum Account) fee for the use of a 250 KVA transformer, it is considered more efficient and can save costs of Rp. 4,625,480 for each month if the use of the transformer is less than 40 hours and if the customer uses the transformer for more than 40 hours of use, then the financing will be calculated normally.