{"title":"光纤环路系统的可用性目标","authors":"J. L. Spencer","doi":"10.1109/GLOCOM.1991.188450","DOIUrl":null,"url":null,"abstract":"It is noted that deployment of fiber in the loop (FITL) involves more than the simple replacement of copper media with optical fiber; it requires the introduction of additional equipment, primarily related to the optoelectronics obviously necessary for fiber optic transport, and a careful reexamination of maintenance strategies. Although the end-to-end service availability objective (99.99%) is not changed in proposed Bellcore criteria, FITL leads to a new hypothetical reference circuit (HRC) and subsequent reallocation of maximum downtimes assigned to different network elements. These changes are reviewed, and some critical system and component issues are identified. The downtime allocations described, based on the new FITL HRC, give equipment suppliers clear reliability goals for the design and manufacture of their products.<<ETX>>","PeriodicalId":343080,"journal":{"name":"IEEE Global Telecommunications Conference GLOBECOM '91: Countdown to the New Millennium. Conference Record","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1991-12-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Availability objectives for fiber in the loop systems\",\"authors\":\"J. L. Spencer\",\"doi\":\"10.1109/GLOCOM.1991.188450\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"It is noted that deployment of fiber in the loop (FITL) involves more than the simple replacement of copper media with optical fiber; it requires the introduction of additional equipment, primarily related to the optoelectronics obviously necessary for fiber optic transport, and a careful reexamination of maintenance strategies. Although the end-to-end service availability objective (99.99%) is not changed in proposed Bellcore criteria, FITL leads to a new hypothetical reference circuit (HRC) and subsequent reallocation of maximum downtimes assigned to different network elements. These changes are reviewed, and some critical system and component issues are identified. The downtime allocations described, based on the new FITL HRC, give equipment suppliers clear reliability goals for the design and manufacture of their products.<<ETX>>\",\"PeriodicalId\":343080,\"journal\":{\"name\":\"IEEE Global Telecommunications Conference GLOBECOM '91: Countdown to the New Millennium. Conference Record\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-12-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Global Telecommunications Conference GLOBECOM '91: Countdown to the New Millennium. Conference Record\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/GLOCOM.1991.188450\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Global Telecommunications Conference GLOBECOM '91: Countdown to the New Millennium. Conference Record","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/GLOCOM.1991.188450","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

值得注意的是,光纤在环路(FITL)的部署涉及的不仅仅是用光纤简单地替换铜介质;它需要引入额外的设备,主要是与光纤传输明显必要的光电子相关的设备,并仔细重新检查维护策略。虽然端到端服务可用性目标(99.99%)在提议的Bellcore标准中没有改变,但FITL导致了一个新的假设参考电路(HRC)和随后分配给不同网元的最大停机时间的重新分配。审查这些更改,并确定一些关键的系统和组件问题。根据新的FITL HRC,所描述的停机时间分配为设备供应商的产品设计和制造提供了明确的可靠性目标。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Availability objectives for fiber in the loop systems
It is noted that deployment of fiber in the loop (FITL) involves more than the simple replacement of copper media with optical fiber; it requires the introduction of additional equipment, primarily related to the optoelectronics obviously necessary for fiber optic transport, and a careful reexamination of maintenance strategies. Although the end-to-end service availability objective (99.99%) is not changed in proposed Bellcore criteria, FITL leads to a new hypothetical reference circuit (HRC) and subsequent reallocation of maximum downtimes assigned to different network elements. These changes are reviewed, and some critical system and component issues are identified. The downtime allocations described, based on the new FITL HRC, give equipment suppliers clear reliability goals for the design and manufacture of their products.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The HPC/VORX local area multicomputer system Improvement of ADP-CELP speech coding at 4 kbits/s Bi-directional equalization technique for TDMA communication systems over land mobile radio channels Implementation strategies for scheduling algorithms in integrated-services packet-switched networks Traffic routing and performance analysis of the Common Channel Signaling System 7 network
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1