用于获得高质量一秒间隔PV最大功率和太阳辐射测量的监测系统

W. Grady, C. Klauber, H. Thomas
{"title":"用于获得高质量一秒间隔PV最大功率和太阳辐射测量的监测系统","authors":"W. Grady, C. Klauber, H. Thomas","doi":"10.1109/ENERGYTECH.2013.6645282","DOIUrl":null,"url":null,"abstract":"A major concern with future high penetration PV levels is the impact on electric utility power distribution systems due to abrupt changes in power generation caused by cloud shadows and the resulting voltage flicker. The time period of interest in this phenomenon is seconds. This paper describes the process used to obtain GPS time-stamped 1-second spaced maximum panel power output and solar radiation estimates from a data logger controlled system. The key is to operate the system quickly during each repetitive 5-second period, taking a string of measurements and sweeping the test panels current-voltage curve, and then using cubic splines to compute high-quality estimates at integer 1-second spaced intervals.","PeriodicalId":154402,"journal":{"name":"2013 IEEE Energytech","volume":"94 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A monitoring system for obtaining high-quality one-second spaced PV maximum power and solar radiation measurements\",\"authors\":\"W. Grady, C. Klauber, H. Thomas\",\"doi\":\"10.1109/ENERGYTECH.2013.6645282\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A major concern with future high penetration PV levels is the impact on electric utility power distribution systems due to abrupt changes in power generation caused by cloud shadows and the resulting voltage flicker. The time period of interest in this phenomenon is seconds. This paper describes the process used to obtain GPS time-stamped 1-second spaced maximum panel power output and solar radiation estimates from a data logger controlled system. The key is to operate the system quickly during each repetitive 5-second period, taking a string of measurements and sweeping the test panels current-voltage curve, and then using cubic splines to compute high-quality estimates at integer 1-second spaced intervals.\",\"PeriodicalId\":154402,\"journal\":{\"name\":\"2013 IEEE Energytech\",\"volume\":\"94 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 IEEE Energytech\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ENERGYTECH.2013.6645282\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE Energytech","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ENERGYTECH.2013.6645282","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

未来高渗透光伏水平的一个主要问题是由于云层阴影和由此产生的电压闪变引起的发电突然变化对公用事业配电系统的影响。对这种现象感兴趣的时间周期是秒。本文描述了从数据记录器控制的系统中获得GPS时间戳间隔1秒的最大面板功率输出和太阳辐射估计的过程。关键是在每个重复的5秒周期内快速操作系统,进行一系列测量并扫描测试面板的电流-电压曲线,然后使用三次样条以整数1秒间隔计算高质量的估计值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A monitoring system for obtaining high-quality one-second spaced PV maximum power and solar radiation measurements
A major concern with future high penetration PV levels is the impact on electric utility power distribution systems due to abrupt changes in power generation caused by cloud shadows and the resulting voltage flicker. The time period of interest in this phenomenon is seconds. This paper describes the process used to obtain GPS time-stamped 1-second spaced maximum panel power output and solar radiation estimates from a data logger controlled system. The key is to operate the system quickly during each repetitive 5-second period, taking a string of measurements and sweeping the test panels current-voltage curve, and then using cubic splines to compute high-quality estimates at integer 1-second spaced intervals.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Energy exchange model of PV-based battery switch stations based on battery swap service and power distribution Flux weakening control for surface mount permanent magnet synchronous motor (PMSM) drives with rapid load and speed varying applications Toward an Energy-Proportional Building prospect: Evaluation and analysis of the energy consumption in a green building testbed Commercialization of high 600V GaN-on-silicon power HEMTs and diodes On time desynchronization attack against IEEE 1588 protocol in power grid systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1