国家优先级项目的服务质量,系统地登记完成

A. Yusuf, Albertus Yosep Maturan, Dapot Pardamean Saragih
{"title":"国家优先级项目的服务质量,系统地登记完成","authors":"A. Yusuf, Albertus Yosep Maturan, Dapot Pardamean Saragih","doi":"10.35724/sjias.v9i1.2780","DOIUrl":null,"url":null,"abstract":"The certificate service process has problems.The research objectives explain how the quality of publicservice.Qualitative research methods.Primary and secondary data sources.Data collectiontechniques; Observations, interviews, documentation and poll questions.Data analysis techniques;Reduction, presentation, verification or conclusion.Research results, First Process-Related quality ofpublic service shows good process effort but not maximally due to the interconnectedness of theprocess are still many problems that arise as a complex problem, Both Outcomes-Relatedimplementation PTSL applied based on the service system No.1 the year 2010 about standards ofservice and land arrangement by human resources of each task and responsibility for the workload,some of the SDM has a knowledge directly proportional to his education, such as educated SD,SMA/SMK, D1, D3, D4, and S1.Some SDM conditions have not demonstrated professionalism in whichthere are problems of the, Third Image-Related service is trusted to inform the implementation of PTSLstarting in January 2019 precisely in the land office and each village opened to the public for us toreceive a target land bid as many as 6,800 land fields, but For Land Fields Map (PBT) amounted to1,500 fields and the other 5,300 land areas are certified one includes Merauke regency.The publictrust is full of pique with what inconsistency is promised timeliness Issuance of delayed certificatesexperienced protracted applicants until the end of the year 2019 there has been no point of clarity.","PeriodicalId":312787,"journal":{"name":"Societas : Jurnal Ilmu Administrasi dan Sosial","volume":"6 4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-05-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Kualitas Pelayanan Program Prioritas Nasional Percepatan Pendaftaran Tanah Sistematis Lengkap\",\"authors\":\"A. Yusuf, Albertus Yosep Maturan, Dapot Pardamean Saragih\",\"doi\":\"10.35724/sjias.v9i1.2780\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The certificate service process has problems.The research objectives explain how the quality of publicservice.Qualitative research methods.Primary and secondary data sources.Data collectiontechniques; Observations, interviews, documentation and poll questions.Data analysis techniques;Reduction, presentation, verification or conclusion.Research results, First Process-Related quality ofpublic service shows good process effort but not maximally due to the interconnectedness of theprocess are still many problems that arise as a complex problem, Both Outcomes-Relatedimplementation PTSL applied based on the service system No.1 the year 2010 about standards ofservice and land arrangement by human resources of each task and responsibility for the workload,some of the SDM has a knowledge directly proportional to his education, such as educated SD,SMA/SMK, D1, D3, D4, and S1.Some SDM conditions have not demonstrated professionalism in whichthere are problems of the, Third Image-Related service is trusted to inform the implementation of PTSLstarting in January 2019 precisely in the land office and each village opened to the public for us toreceive a target land bid as many as 6,800 land fields, but For Land Fields Map (PBT) amounted to1,500 fields and the other 5,300 land areas are certified one includes Merauke regency.The publictrust is full of pique with what inconsistency is promised timeliness Issuance of delayed certificatesexperienced protracted applicants until the end of the year 2019 there has been no point of clarity.\",\"PeriodicalId\":312787,\"journal\":{\"name\":\"Societas : Jurnal Ilmu Administrasi dan Sosial\",\"volume\":\"6 4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-05-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Societas : Jurnal Ilmu Administrasi dan Sosial\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35724/sjias.v9i1.2780\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Societas : Jurnal Ilmu Administrasi dan Sosial","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35724/sjias.v9i1.2780","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

证书服务进程出现问题。研究目标解释了公共服务的质量如何。定性研究方法。主要和次要数据源。数据collectiontechniques;观察、访谈、文件和投票问题。数据分析技术;简化、展示、验证或结论。研究结果显示,第一,过程相关的公共服务质量表现出良好的过程努力,但由于过程的相互联系,仍然有许多问题出现,作为一个复杂的问题,两个结果相关的实施PTSL应用基于服务系统第1号2010年关于服务标准和土地安排的人力资源的每项任务和责任的工作量,一些SDM有知识成正比的教育;例如受教育的SD、SMA/SMK、D1、D3、D4和S1。一些SDM条件没有表现出专业性,其中存在问题,第三个图像相关服务被信任,从2019年1月开始在土地办公室实施ptsls,每个村庄向公众开放,让我们获得多达6,800块土地的目标土地投标,但土地地图(PBT)达到1,500块,其他5,300块土地获得认证,其中包括Merauke regency。公众信托对承诺的不一致充满了愤怒,及时性颁发延迟的证书,经历了拖延的申请人,直到2019年底,都没有明确的意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Kualitas Pelayanan Program Prioritas Nasional Percepatan Pendaftaran Tanah Sistematis Lengkap
The certificate service process has problems.The research objectives explain how the quality of publicservice.Qualitative research methods.Primary and secondary data sources.Data collectiontechniques; Observations, interviews, documentation and poll questions.Data analysis techniques;Reduction, presentation, verification or conclusion.Research results, First Process-Related quality ofpublic service shows good process effort but not maximally due to the interconnectedness of theprocess are still many problems that arise as a complex problem, Both Outcomes-Relatedimplementation PTSL applied based on the service system No.1 the year 2010 about standards ofservice and land arrangement by human resources of each task and responsibility for the workload,some of the SDM has a knowledge directly proportional to his education, such as educated SD,SMA/SMK, D1, D3, D4, and S1.Some SDM conditions have not demonstrated professionalism in whichthere are problems of the, Third Image-Related service is trusted to inform the implementation of PTSLstarting in January 2019 precisely in the land office and each village opened to the public for us toreceive a target land bid as many as 6,800 land fields, but For Land Fields Map (PBT) amounted to1,500 fields and the other 5,300 land areas are certified one includes Merauke regency.The publictrust is full of pique with what inconsistency is promised timeliness Issuance of delayed certificatesexperienced protracted applicants until the end of the year 2019 there has been no point of clarity.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Pemberdayaan Masyarakat Terhadap Pengelolaan Dana Desa Formulasi Kebijakan Kolaborasi Pengelolaan Pariwisata Peran Dinas Koperasi Dan Usaha Mikro Dalam Pemberdayaan Usaha Mikro Dinamika Kedudukan, Peran Dan Status Perempuan Suku Asmat Pendekatan Arena Kultural Pierre Bourdieu Implementasi Peraturan Daerah Nomor 11 Tahun 2018 Tentang Pengelolaan Barang Milik Daerah
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1