{"title":"为建筑管理制定业主项目评估框架","authors":"Jong Hoon Kim, Hyun-soo Lee, Moonseo Park, Sanghwi Park, Inbeom Lee","doi":"10.6106/KJCEM.2016.17.5.130","DOIUrl":null,"url":null,"abstract":": Owner’s participation on a construciton project can alter the success of a construction project. In general, success of a construction project is measured by project schedule and cost decrease without considering the role an owner has in a project. As a result, this research developed a framework for the project evaluation form and after extracting a total of 9 project critical success factors (CSF) and 27 sub-CSF. AHP method was utilized to evaluate the importance factor of each CSFs. Setting a goal for each CSFs at the beginning of a project and comparing the values at the completion of the project utilizing the project evalaution form will allow a systematic evaluation and management of a project. Solution Map was introduced and Solution Tool was suggested in order to utlize the evaluation results effectively. In the future studies, various project cases needs to be supplemented for further verification and a solution based on the evaluation result needs to be developed that can be applied to construction projects.","PeriodicalId":220018,"journal":{"name":"Korean Journal of Construction Engineering and Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Developing an Owner`s Project Evaluation Framework for Construction Management\",\"authors\":\"Jong Hoon Kim, Hyun-soo Lee, Moonseo Park, Sanghwi Park, Inbeom Lee\",\"doi\":\"10.6106/KJCEM.2016.17.5.130\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": Owner’s participation on a construciton project can alter the success of a construction project. In general, success of a construction project is measured by project schedule and cost decrease without considering the role an owner has in a project. As a result, this research developed a framework for the project evaluation form and after extracting a total of 9 project critical success factors (CSF) and 27 sub-CSF. AHP method was utilized to evaluate the importance factor of each CSFs. Setting a goal for each CSFs at the beginning of a project and comparing the values at the completion of the project utilizing the project evalaution form will allow a systematic evaluation and management of a project. Solution Map was introduced and Solution Tool was suggested in order to utlize the evaluation results effectively. In the future studies, various project cases needs to be supplemented for further verification and a solution based on the evaluation result needs to be developed that can be applied to construction projects.\",\"PeriodicalId\":220018,\"journal\":{\"name\":\"Korean Journal of Construction Engineering and Management\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Korean Journal of Construction Engineering and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.6106/KJCEM.2016.17.5.130\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Korean Journal of Construction Engineering and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.6106/KJCEM.2016.17.5.130","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Developing an Owner`s Project Evaluation Framework for Construction Management
: Owner’s participation on a construciton project can alter the success of a construction project. In general, success of a construction project is measured by project schedule and cost decrease without considering the role an owner has in a project. As a result, this research developed a framework for the project evaluation form and after extracting a total of 9 project critical success factors (CSF) and 27 sub-CSF. AHP method was utilized to evaluate the importance factor of each CSFs. Setting a goal for each CSFs at the beginning of a project and comparing the values at the completion of the project utilizing the project evalaution form will allow a systematic evaluation and management of a project. Solution Map was introduced and Solution Tool was suggested in order to utlize the evaluation results effectively. In the future studies, various project cases needs to be supplemented for further verification and a solution based on the evaluation result needs to be developed that can be applied to construction projects.