{"title":"实施广域监测、保护和控制的实际考虑","authors":"E. Price","doi":"10.1109/CPRE.2006.1638690","DOIUrl":null,"url":null,"abstract":"The purpose of this paper to provide a brief overview of wide area monitoring, protection and control systems addressing the fundamental process of collecting and delivering the synchrophasor data to the application, a vision of the technology direction, and some practical points to consider when implementing a phasor measurement program. It is based on experience gained working with utilities in their initial efforts to implement phasor measurement projects.","PeriodicalId":125883,"journal":{"name":"59th Annual Conference for Protective Relay Engineers, 2006.","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"39","resultStr":"{\"title\":\"Practical considerations for implementing wide area monitoring, protection and control\",\"authors\":\"E. Price\",\"doi\":\"10.1109/CPRE.2006.1638690\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this paper to provide a brief overview of wide area monitoring, protection and control systems addressing the fundamental process of collecting and delivering the synchrophasor data to the application, a vision of the technology direction, and some practical points to consider when implementing a phasor measurement program. It is based on experience gained working with utilities in their initial efforts to implement phasor measurement projects.\",\"PeriodicalId\":125883,\"journal\":{\"name\":\"59th Annual Conference for Protective Relay Engineers, 2006.\",\"volume\":\"43 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-04-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"39\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"59th Annual Conference for Protective Relay Engineers, 2006.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CPRE.2006.1638690\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"59th Annual Conference for Protective Relay Engineers, 2006.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE.2006.1638690","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Practical considerations for implementing wide area monitoring, protection and control
The purpose of this paper to provide a brief overview of wide area monitoring, protection and control systems addressing the fundamental process of collecting and delivering the synchrophasor data to the application, a vision of the technology direction, and some practical points to consider when implementing a phasor measurement program. It is based on experience gained working with utilities in their initial efforts to implement phasor measurement projects.