工业建筑系统成本估算中的建筑信息建模技术创新

M. Moledina, Goh Wei Pin, W. Enegbuma, K. Ali, Kayode I. Adenuga
{"title":"工业建筑系统成本估算中的建筑信息建模技术创新","authors":"M. Moledina, Goh Wei Pin, W. Enegbuma, K. Ali, Kayode I. Adenuga","doi":"10.1109/ICRIIS.2017.8002480","DOIUrl":null,"url":null,"abstract":"The paradigm shift in construction cost estimation is attributed to technological innovations in the spheres of building information modelling (BIM) and industrialised building systems (IBS). Majority of construction projects experience cost overruns which affect project objectives. The outcome of cost overruns invariably leads to disputes and further delays. Similarly, cost estimators resistance to overcoming the inertia to leap from traditional estimation methods to advanced methods further exacerbates the issues of cost estimation. This paper aims at comparing cost estimate between traditional cost estimation and advanced cost estimation. Data was collected via questionnaire from registered quantity surveying companies with the Board of Quantity Surveying Malaysia (BQSM). Subsequently, real time simulation was carried out on a sample IBS project using Autodesk Revit and Navisworks to compare cost estimates. The results revealed that BIM is accurate than bill of quantity (BOQ) as this difference results in a critical factor for large construction projects. The study was limited in terms of cost standard and database in Autodesk Navisworks. Future research can improve on the quantity coding for BIM in Malaysia.","PeriodicalId":384130,"journal":{"name":"2017 International Conference on Research and Innovation in Information Systems (ICRIIS)","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Building information modelling technological innovations in industrialised building systems cost estimation\",\"authors\":\"M. Moledina, Goh Wei Pin, W. Enegbuma, K. Ali, Kayode I. Adenuga\",\"doi\":\"10.1109/ICRIIS.2017.8002480\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paradigm shift in construction cost estimation is attributed to technological innovations in the spheres of building information modelling (BIM) and industrialised building systems (IBS). Majority of construction projects experience cost overruns which affect project objectives. The outcome of cost overruns invariably leads to disputes and further delays. Similarly, cost estimators resistance to overcoming the inertia to leap from traditional estimation methods to advanced methods further exacerbates the issues of cost estimation. This paper aims at comparing cost estimate between traditional cost estimation and advanced cost estimation. Data was collected via questionnaire from registered quantity surveying companies with the Board of Quantity Surveying Malaysia (BQSM). Subsequently, real time simulation was carried out on a sample IBS project using Autodesk Revit and Navisworks to compare cost estimates. The results revealed that BIM is accurate than bill of quantity (BOQ) as this difference results in a critical factor for large construction projects. The study was limited in terms of cost standard and database in Autodesk Navisworks. Future research can improve on the quantity coding for BIM in Malaysia.\",\"PeriodicalId\":384130,\"journal\":{\"name\":\"2017 International Conference on Research and Innovation in Information Systems (ICRIIS)\",\"volume\":\"36 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 International Conference on Research and Innovation in Information Systems (ICRIIS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICRIIS.2017.8002480\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Conference on Research and Innovation in Information Systems (ICRIIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICRIIS.2017.8002480","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

建筑成本估算的范式转变归因于建筑信息模型(BIM)和工业化建筑系统(IBS)领域的技术创新。大多数建设项目都存在成本超支的问题,影响了项目目标。成本超支的结果总是导致纠纷和进一步的延误。同样,成本估算者不愿克服从传统估算方法向先进估算方法飞跃的惯性,进一步加剧了成本估算的问题。本文旨在比较传统成本估算和先进成本估算的成本估算。数据是通过马来西亚工料测量委员会(BQSM)的注册工料测量公司的问卷调查收集的。随后,使用Autodesk Revit和Navisworks对样本IBS项目进行了实时仿真,以比较成本估算。结果表明,BIM比工程量清单(BOQ)更准确,因为这种差异是大型建筑项目的关键因素。本研究在成本标准和Autodesk Navisworks数据库方面受到限制。未来的研究可以完善马来西亚BIM的数量编码。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Building information modelling technological innovations in industrialised building systems cost estimation
The paradigm shift in construction cost estimation is attributed to technological innovations in the spheres of building information modelling (BIM) and industrialised building systems (IBS). Majority of construction projects experience cost overruns which affect project objectives. The outcome of cost overruns invariably leads to disputes and further delays. Similarly, cost estimators resistance to overcoming the inertia to leap from traditional estimation methods to advanced methods further exacerbates the issues of cost estimation. This paper aims at comparing cost estimate between traditional cost estimation and advanced cost estimation. Data was collected via questionnaire from registered quantity surveying companies with the Board of Quantity Surveying Malaysia (BQSM). Subsequently, real time simulation was carried out on a sample IBS project using Autodesk Revit and Navisworks to compare cost estimates. The results revealed that BIM is accurate than bill of quantity (BOQ) as this difference results in a critical factor for large construction projects. The study was limited in terms of cost standard and database in Autodesk Navisworks. Future research can improve on the quantity coding for BIM in Malaysia.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A firm and individual characteristic-based prediction model for E2.0 continuance adoption Understanding knowledge management behavior from a social exchange perspective Healthcare employees' perception on information privacy concerns Detection and prevention of possible unauthorized login attempts through stolen credentials from a phishing attack in an online banking system Resolving data duplication, inaccuracy and inconsistency issues using Master Data Management
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1